Clean Water Act discharge permit · NPDES VAR10O028
NORFOLK TERMINAL LP, Norfolk, VA: NPDES VAR10O028 discharge permit, effluent exceedances, inspections, penalties
- Administratively continuedPermit status
- MinorDischarger class
- 0Pollutants under a numeric limit
- 0Pollutants with an effluent exceedance
- 0Inspections on file
- 0Formal enforcement actions
NORFOLK TERMINAL LP, held by Katoen Natie Engineering USA Inc, holds NPDES permit VAR10O028, which discharges to Eastern Branch Elizabeth River. EPA’s file records it issued July 1, 2019 and expiring June 30, 2024. The status and dates are as EPA’s permit file stood when Velarion loaded it (September 15, 2026); EPA’s free Detailed Facility Report on ECHO carries the permit’s current standing.
What the register holds for NORFOLK TERMINAL LP: its NPDES ID, its permit type and status, its dates, its address in Norfolk, Virginia, its receiving water. EPA’s effluent violation file and its single-event violation file hold no violation for NPDES VAR10O028.
What stands out
- Its term runs 4 years and 365 days, July 1, 2019 to June 30, 2024; the term ended 807 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as administratively continued.
- No dated event in the 365 days to September 15, 2026.
- It is one of 13,137 discharge permits on the register in Virginia; 6,257 of them (48%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility as filed | NORFOLK TERMINAL LP |
|---|---|
| Permittee as filed | Katoen Natie Engineering USA Inc |
| NPDES ID | VAR10O028 |
| Permit status | Administratively continued (past its expiration date and still in force until reissued) |
| Permit type | Coverage under a general permit |
| Discharger class | Minor discharger |
| Facility type | Not a publicly owned treatment works |
| Program | Construction stormwater |
| Issued | July 1, 2019 |
| Expiration date | June 30, 2024 |
| Issuing agency | VA DEQ |
| Address | Norfolk, VA 23523 |
| Receiving water | Eastern Branch Elizabeth River |
| Receiving water impaired | 303(D) Listed |
| Subwatershed | Eastern Branch Elizabeth River (HUC 020802080204) |
Cited to the EPA ICIS-NPDES permit file (ECHO download).
Effluent limits and exceedances
- 0Pollutants on file
- 0Under a numeric limit
- 0With a violation of any kind
- 0With an effluent exceedance
EPA’s limits and effluent violation files hold no pollutant row for NPDES VAR10O028.
Cited to the EPA ICIS-NPDES limits and effluent violations files (ECHO download); up to 60 rows shown, most exceedances first.
Inspections, violations and enforcement
- 0Single-event violations
EPA’s single-event violation file, as loaded, holds no violation for NPDES VAR10O028.
Inspections
EPA’s inspection file holds no inspection for NPDES VAR10O028.
Formal enforcement and penalties
0 formal actions, 0 of them with a penalty assessed. Federal and state penalties are separate figures from separate authorities and are shown as each was filed, never added together.
Informal enforcement
EPA’s informal enforcement file holds no action for NPDES VAR10O028.
Cited to the EPA ICIS-NPDES violation, inspection and enforcement files (ECHO download); up to 50 rows of each shown, newest first.
Watch this permit
One permit holder, $99/month. Watch the register for one permit holder and the places and receiving waters tied to its permits. Choose “One permit holder” and enter this permit’s NPDES ID, VAR10O028.
Start the watch
- One permit holder — $99/month
- One watershed — $2,990/year
- One state — $4,990/year
- The whole register — $18,000/year
How we handle your data → Privacy
EPA publishes a free Detailed Facility Report for every permit on ECHO: its compliance status quarter by quarter, its inspections, and its enforcement actions and penalties. EPA also sends free notices of new inspections and enforcement actions through ECHO Notify; enter NPDES ID VAR10O028 there.
NORFOLK TERMINAL LP, Norfolk, Virginia: Coverage under a general permit VAR10O028, held by Katoen Natie Engineering USA Inc; Construction stormwater; Administratively continued (past its expiration date and still in force until reissued); issued July 1, 2019, term to June 30, 2024, by VA DEQ; discharges to Eastern Branch Elizabeth River.
Virginia holds 6,257 Construction stormwater coverages of this permit type in EPA’s file; 4 were issued before VAR10O028.
Coverages issued nearest VAR10O028
- 2019-07-01: CRYSTAL HILL SOLAR LLC PHASE I, Crystal Hill: VAR10O003, held by DEPCOM Power Inc
- 2019-07-01: DEAN WENGER POULTRY HOUSE, Bridgewater: VAR10O011, held by Sheldon Wenger
- 2019-07-01: SHERWOOD ON THE RIVER SECTION 2, Stafford: VAR10O012, held by Piccard Building and Development LLC
- 2019-07-01: KING OF KINGS CHURCH, Forest: VAR10O020, held by King of Kings Church
- 2019-07-01: RED BARN SUBDIVISION, Wirtz: VAR10O024, held by Red Barn Developers LLC
- 2019-07-01: DEERFIELD DRIVE EXTENSION, Ruckersville: VAR10O030, held by Kinvara Properties LLC
- 2019-07-01: HUNTING HILLS SECTION 29, Roanoke: VAR10O032, held by Old Heritage Corp
- 2019-07-01: SAINT POPE CYRIL COPTIC ORTHODOX CHURCH, Aldie: VAR10O037, held by Pope Cyril VI Coptic Orthodox Church of Chantilly
- 2019-07-01: BELLA SIGNATURE HOMES LLC PROPERTY, Charlottesville: VAR10O046, held by Bella Homes LLC
- 2019-07-01: GLOUCESTER SELF STORAGE, Gloucester: VAR10O049, held by KHP LLC
NORFOLK TERMINAL LP among its neighbors
90 discharge permits are in the Eastern Branch Elizabeth River subwatershed (HUC 020802080204); VAR10O028 is one.
Other permits in the Eastern Branch Elizabeth River subwatershed (HUC 020802080204)
- A-OK STORAGE, Norfolk: VAR10V310, minor, term to 2029-06-30
- ALPOLIC SITE IMPROVEMENTS, Chesapeake: VAR10R093, minor, term to 2024-06-30
- AMAZON COM SERVICES LLC - DOR2, Norfolk: VAR052516, minor, term to 2024-06-30
- ARTISTRY ON GREENWICH ES/STORMWATER PLAN, Virginia Beach: VAR10S992, minor, term to 2024-06-30
- ATLANTIC SHORES BAPTIST CHURCH, Virginia Beach: VAR10R657, minor, term to 2024-06-30
- ATTAIN AT CARLTON, Chesapeake: VAR10X137, minor, term to 2029-06-30
- ATTAIN AT NEWTOWN, Norfolk: VAR10X099, minor, term to 2029-06-30
- BANK OF AMERICA - VOLVO PARKWAY, Chesapeake: VAR10W076, minor, term to 2029-06-30
- BARGE RAMP AND PLATFORM, Norfolk: VAR10W888, minor, term to 2029-06-30
- BAY DISPOSAL NORFOLK MAINTENANCE SHOP & MRF, Norfolk: VAR052302, minor, term to 2024-06-30
Nearby on the register
- Discharge permits in Norfolk
- Every permit record in Norfolk, A to Z
- Discharge permits in Virginia
- Every permit record in Virginia, A to Z
Figures from EPA’s ICIS-NPDES download, loaded September 15, 2026.
What this page shows
NORFOLK TERMINAL LP is one of 54 storm water construction permits in Norfolk, and 0.0% of those carry a violation entry. The Eastern Branch Elizabeth River subwatershed (HUC 020802080204) lists 90 NPDES permits, this one included. Norfolk's register holds 54 storm water construction permits, with this one among them.