NPDES VAR10P886 · Clean Water Act
ABRAMS POINTE SUBDIVISION SECTIONS 2A, 2B, 4A, 4B, Winchester, VA: NPDES VAR10P886 discharge permit, effluent exceedances, inspections, penalties
ABRAMS POINTE SUBDIVISION SECTIONS 2A, 2B, 4A, 4B, Winchester, Virginia: General permit coverage VAR10P886, held by Richmond American Homes of Virginia Inc; Construction stormwater; Administratively continued; issued July 1, 2019, term to June 30, 2024, by VA DEQ; discharges to Abrams Creek.
- October 19, 2026: Evaluation (S).
- April 13, 2026: Evaluation (S).
Virginia holds 6,257 Construction stormwater coverages of this permit type in EPA’s file; 4 were issued before VAR10P886. Richmond American Homes of Virginia Inc holds 4 permits in Virginia.
Other permits held by Richmond American Homes of Virginia Inc
- HIGHPOINT OF CULPEPER PHASES 4 6 AND 1 SECTION 5 P, Culpeper: VAR101326, issued 2019-07-01
- HASTINGS MARKETPLACE, Manassas: VAR108741, issued 2019-07-01
- RAVEN OAKS SUBDIVISION, Winchester: VAR10O366, issued 2019-07-01
Coverages issued nearest VAR10P886
- 2019-07-01: MAIN TREE FARM CPAP, Leesburg: VAR10P870, held by Carrington Builders at Main Tree Farm LC
- 2019-07-01: CARVERS CREEK LLC PHASE 2, Gloucester: VAR10P872, held by DEPCOM Power Inc
- 2019-07-01: PREMIER STORAGE AND SERVICES LLC, Mineral: VAR10P879, held by Premier Storage and Services LLC
- 2019-07-01: CROSSINGS CENTRE DRIVE OFFICE PARK, Forest: VAR10P882, held by Moneywise Partners LLC
- 2019-07-01: WILLOW POND ESTATES FORGE ROAD MINOR SUBDIVISION, Toano: VAR10P885, held by Elwood H Perry
- 2019-07-01: WATLINGTON SOLAR, South Boston: VAR10P888, held by Watlington Solar LLC
- 2019-07-01: MURDOCK STREET PROPERTY, Chantilly: VAR10P892, held by Cape Theresa LLC
- 2019-07-01: ONE UNIVERSITY, Fai: VAR10P893, held by The Whiting Turner Contracting Co
- 2019-07-01: NEWPORT NEWS TRANSIT CENTER PARK AND RIDE REDEVELO, Newport News: VAR10P895, held by Allan Myers VA Inc
- 2019-07-01: BOOKERS MILL SOLAR PART 1, Farnham: VAR10P897, held by Virginia Electric and Power Co dba Dominion Energy
ABRAMS POINTE SUBDIVISION SECTIONS 2A, 2B, 4A, 4B among its neighbors
48 discharge permits are in the Abrams Creek subwatershed (HUC 020700040902); VAR10P886 is one.
Other permits in the Abrams Creek subwatershed (HUC 020700040902)
- 135 IMBODEN DRIVE PROJECT, Winchester: VAR10O455, minor, term to 2024-06-30
- ABRAMS CREEK STREAM RESTORATION, Winchester: VAR10W982, minor, term to 2029-06-30
- ABRAMS CROSSING LOT 1, Winchester: VAR10T970, minor, term to 2024-06-30
- ABRAMS CROSSING LOT 5, Winchester: VAR10T975, minor, term to 2024-06-30
- ABRAMS POINTE SECTION 3, Winchester: VAR10Q735, minor, term to 2024-06-30
- CAMERON SQUARE - SITE PLAN, Winchester: VAR10V540, minor, term to 2029-06-30
- CAMERON STREET REDEVELOPMENT - REVISED SITE DEVELO, Winchester: VAR10U128, minor, term to 2029-06-30
- CENTRAL DOWNTOWN INFRASTRUCTURE IMPROVEMENTS PROJE, Winchester: VAR10N512, minor, term to 2024-06-30
- ESTES EXPRESS LINES - 005 WINCHESTER, Winchester: VAR052646, minor, term to 2029-06-30
- FEDERAL MOGUL PRODUCTS INC - W, Winchester: VA0076384, minor, term to 2012-12-31
What stands out
- Its term runs 4 years and 365 days, July 1, 2019 to June 30, 2024; the term ended 807 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as administratively continued.
- Its newest dated event on file is an inspection on October 19, 2026.
- In the 365 days to September 15, 2026, it was dated 1 inspection.
- EPA's file dates 2 events for it, all in 2026.
- It is one of 13,137 discharge permits on the register in Virginia; 6,257 of them (48%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | ABRAMS POINTE SUBDIVISION SECTIONS 2A, 2B, 4A, 4B |
|---|---|
| Permittee | Richmond American Homes of Virginia Inc |
| NPDES ID | VAR10P886 |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | July 1, 2019 |
| Expires | June 30, 2024 |
| Agency | VA DEQ |
| Address | Winchester, VA 22602 |
| Receiving water | Abrams Creek |
| Subwatershed | Abrams Creek (HUC 020700040902) |
NPDES VAR10P886: effluent limits and exceedances
ABRAMS POINTE SUBDIVISION SECTIONS 2A, 2B, 4A, 4B (NPDES VAR10P886): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES VAR10P886: no pollutant row on file.
NPDES VAR10P886: inspections, violations and enforcement
NPDES VAR10P886: 2 inspections
| Date | What EPA recorded | Agency |
|---|---|---|
| October 19, 2026 | Evaluation | S |
| April 13, 2026 | Evaluation | S |
NPDES VAR10P886 (ABRAMS POINTE SUBDIVISION SECTIONS 2A, 2B, 4A, 4B): no single-event violation, formal enforcement action and informal enforcement action on file.
Watch NPDES VAR10P886
NPDES VAR10P886: one email when its EPA record changes — $99/month.
Permits near NPDES VAR10P886
NPDES VAR10P886: 0 pollutant rows, 2 dated events; ICIS-NPDES download, loaded September 15, 2026.