NPDES VAR10R273 · Clean Water Act
JAMES RIVER 138KV STATION, Lovingston, VA: NPDES VAR10R273 discharge permit, effluent exceedances, inspections, penalties
JAMES RIVER 138KV STATION, Lovingston, Virginia: General permit coverage VAR10R273, held by American Electric Power d/b/a Appalachian Power Co; Construction stormwater; Administratively continued; issued July 1, 2019, term to June 30, 2024, by VA DEQ; discharges to Rucker Run.
- September 10, 2026: Evaluation (S).
Virginia holds 6,257 Construction stormwater coverages of this permit type in EPA’s file; 4 were issued before VAR10R273.
Coverages issued nearest VAR10R273
- 2019-07-01: PRINCE GEORGE HIGH SCHOOL SYNTHETIC TURF FIELD, Prince George: VAR10R262, held by FieldTurf USA Inc
- 2019-07-01: SOAPSTONE 138 KV SUBSTATION, Schuyler: VAR10R267, held by Appalachian Power Co
- 2019-07-01: RIVERVILLE 138 KV SUBSTATION EXPANSION, Gladstone: VAR10R268, held by Appalachian Power Co
- 2019-07-01: MIDLAND ROAD INDUSTRIAL FACILITY, Midland: VAR10R271, held by OTB Associates, LLC d/b/a OTB Contracting
- 2019-07-01: SHOOSMITH LANDFILL - GAS TREATMENT FACILITY, Chester: VAR10R272, held by Swift Creek Renewables LLC
- 2019-07-01: HERITAGE AT OLD TOWN, Alexandria: VAR10R274, held by John Moriarty & Associates of Virginia, LLC
- 2019-07-01: EDGAR SUBDIVISION RD PLAN, Barboursville: VAR10R276, held by Gary Deal
- 2019-07-01: PLANTATION STORAGE, Kilmarnock: VAR10R279, held by Southeast Management Company LLC
- 2019-07-01: WAVERLY SOLAR LLC PHASE III, Waverly: VAR10R284, held by Energix EPC US LLC
- 2019-07-01: HOT ROD MOTORSPORTS, Petersburg: VAR10R286, held by Hot Rod Motorsports LLC
JAMES RIVER 138KV STATION among its neighbors
6 discharge permits are in the Rucker Run subwatershed (HUC 020802030702); VAR10R273 is one.
Other permits in the Rucker Run subwatershed (HUC 020802030702)
- LOVINGSTON SELF STORAGE, Lovingston: VAR10Q305, minor, term to 2024-06-30
- NELSON SOCIAL SERVICES BUILDING, Lovingston: VAR10V581, minor, term to 2029-06-30
- TINDER GARY AND DAWN RESIDENCE, Shipman: VAG408574, minor, term to 2026-07-31
- VDOT - APPOMATTOX - 6029-062-844,C501, P101, R201, Nelson County: VAR10W495, minor, term to 2029-06-30
- VDOT APPOMATTOX - 0653-062-817 - UPC 112865, Nelson County: VAR10U209, minor, term to 2029-06-30
What stands out
- Its term runs 4 years and 365 days, July 1, 2019 to June 30, 2024; the term ended 807 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as administratively continued.
- Its newest dated event on file is an inspection on September 10, 2026, 5 days before EPA's file was loaded.
- In the 365 days to September 15, 2026, it was dated 1 inspection.
- EPA's file dates 1 event for it, all in 2026.
- It is one of 13,137 discharge permits on the register in Virginia; 6,257 of them (48%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | JAMES RIVER 138KV STATION |
|---|---|
| Permittee | American Electric Power d/b/a Appalachian Power Co |
| NPDES ID | VAR10R273 |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | July 1, 2019 |
| Expires | June 30, 2024 |
| Agency | VA DEQ |
| Address | Lovingston, VA 22971 |
| Receiving water | Rucker Run |
| Subwatershed | Rucker Run (HUC 020802030702) |
NPDES VAR10R273: effluent limits and exceedances
JAMES RIVER 138KV STATION (NPDES VAR10R273): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES VAR10R273: no pollutant row on file.
NPDES VAR10R273: inspections, violations and enforcement
NPDES VAR10R273: 1 inspection
| Date | What EPA recorded | Agency |
|---|---|---|
| September 10, 2026 | Evaluation | S |
NPDES VAR10R273 (JAMES RIVER 138KV STATION): no single-event violation, formal enforcement action and informal enforcement action on file.
Watch NPDES VAR10R273
NPDES VAR10R273: one email when its EPA record changes — $99/month.
Permits near NPDES VAR10R273
NPDES VAR10R273: 0 pollutant rows, 1 dated events; ICIS-NPDES download, loaded September 15, 2026.