NPDES VAR10T519 · Clean Water Act
UNITY TUNSTALL 230KV LINES PHASE 1, Lunenberg, VA: NPDES VAR10T519 discharge permit, effluent exceedances, inspections, penalties
UNITY TUNSTALL 230KV LINES PHASE 1, Lunenberg, Virginia: General permit coverage VAR10T519, held by Virginia Electric and Power Co dba Dominion Energy; Construction stormwater; Administratively continued; issued July 1, 2019, term to June 30, 2024, by VA DEQ; discharges to Meherrin River-Stony Creek.
- April 28, 2026: Evaluation (S).
Virginia holds 6,257 Construction stormwater coverages of this permit type in EPA’s file; 4 were issued before VAR10T519. Virginia Electric and Power Co dba Dominion Energy holds 26 permits in Virginia.
Other permits held by Virginia Electric and Power Co dba Dominion Energy
- MAIN POINT SUBSTATION FINAL SITE AND GRADING PLAN, Fort Lee: VAR10N325, issued 2019-07-01
- FORT POWHATAN SOLAR PHASE I AND PHASE II, Disputanta: VAR10N521, issued 2019-07-01
- MOUNT STORM TO VALLEY 500 KV ELECTRICAL TRANSMISSI, Harrisonburg: VAR10N687, issued 2019-07-01
- POSSUM POINT POWER STATION PONDS ABC AND E CLOSURE, Dumfries: VAR10O106, issued 2019-07-01
- DINWIDDIE CAMPUS MOBILE SUBSTATION AND LAB, N. Dinwiddie: VAR10O898, issued 2019-07-01
- TYSONS SUBSTATION UPGRADE, Vienna: VAR10O956, issued 2019-07-01
- BOOKERS MILL SOLAR PART 1, Farnham: VAR10P897, issued 2019-07-01
- RENAISSANCE TECH PARK BRIDGING, Herndon: VAR10S394, issued 2019-07-01
- BLUE RIDGE SOLAR PART 1, Tight Squeeze: VAR10S443, issued 2019-07-01
- HARPERS SWITCHING STATION, Virginia Beach: VAR10S806, issued 2019-07-01
Coverages issued nearest VAR10T519
- 2019-07-01: THE AIRE AT WESTCHESTER SECTION 1, INCLUDING TIMBE, Midlothian: VAR10T511, held by HHHunt Corporation
- 2019-07-01: BELLEVUE ACRES SUBDIVISION, PHASE 2, Forest: VAR10T515, held by Gillespie Properties, LLC
- 2019-07-01: CCBC LOT 2, Ridgeway: VAR10T516, held by Haymes Brothers Inc
- 2019-07-01: GILLIES CREEK TRAIL PHASE II & III, Richmond: VAR10T517, held by City of Richmond Department of Public Works
- 2019-07-01: THE MENNEL MILLING COMPANY OF VIRGINIA, West Point: VAR10T518, held by The Mennel Milling Company of Virginia
- 2019-07-01: WILDWOOD 138KV TRANSMISSION LINE EXTENSION, Carroll County: VAR10T521, held by Appalachian Power Company
- 2019-07-01: PRESS GLASS BUILDING EXPANSION, Ridgeway: VAR10T522, held by New Atlantic Contracting Inc
- 2019-07-01: BELMONT PARK, Ashburn: VAR10T523, held by Beazer Homes, LLC
- 2019-07-01: PROPOSED DOLLAR GENERAL AXTON VA, Axton: VAR10T525, held by JMB Investment Company LLC
- 2019-07-01: OVERBROOK PHASE 6 - 9, Mcgaheysville: VAR10T526, held by EVG - FM Ventures, LLC
UNITY TUNSTALL 230KV LINES PHASE 1 among its neighbors
5 discharge permits are in the Flat Rock Creek subwatershed (HUC 030102040303); VAR10T519 is one.
Other permits in the Flat Rock Creek subwatershed (HUC 030102040303)
- UNITY 500 KV TAP, Lunenburg: VAR10U951, minor, term to 2029-06-30
- UNITY 500/230KV SWITCHING STATION, Lunenburg: VAR10T649, minor, term to 2024-06-30
- VIRGINIA MARBLE MANUFACTURERS INC, Kenbridge: VAR051137, minor, term to 2024-06-30
- VIRGINIA MARBLE MANUFACTURERS INC, Kenbridge: VAR052213, minor, term to 2024-06-30
What stands out
- Its term runs 4 years and 365 days, July 1, 2019 to June 30, 2024; the term ended 807 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as administratively continued.
- Its newest dated event on file is an inspection on April 28, 2026, 140 days before EPA's file was loaded.
- In the 365 days to September 15, 2026, it was dated 1 inspection.
- EPA's file dates 1 event for it, all in 2026.
- It is one of 13,137 discharge permits on the register in Virginia; 6,257 of them (48%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | UNITY TUNSTALL 230KV LINES PHASE 1 |
|---|---|
| Permittee | Virginia Electric and Power Co dba Dominion Energy |
| NPDES ID | VAR10T519 |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | July 1, 2019 |
| Expires | June 30, 2024 |
| Agency | VA DEQ |
| Address | Lunenberg, VA 23952 |
| Receiving water | Meherrin River-Stony Creek |
| Subwatershed | Flat Rock Creek (HUC 030102040303) |
NPDES VAR10T519: effluent limits and exceedances
UNITY TUNSTALL 230KV LINES PHASE 1 (NPDES VAR10T519): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES VAR10T519: no pollutant row on file.
NPDES VAR10T519: inspections, violations and enforcement
NPDES VAR10T519: 1 inspection
| Date | What EPA recorded | Agency |
|---|---|---|
| April 28, 2026 | Evaluation | S |
NPDES VAR10T519 (UNITY TUNSTALL 230KV LINES PHASE 1): no single-event violation, formal enforcement action and informal enforcement action on file.
Watch NPDES VAR10T519
NPDES VAR10T519: one email when its EPA record changes — $99/month.
Permits near NPDES VAR10T519
NPDES VAR10T519: 0 pollutant rows, 1 dated events; ICIS-NPDES download, loaded September 15, 2026.