NPDES VAR10U340 · Clean Water Act
CRYSTAL HOUSE 3 - EARLY UTILITY WORK, Arlington, VA: NPDES VAR10U340 discharge permit, effluent exceedances, inspections, penalties
CRYSTAL HOUSE 3 - EARLY UTILITY WORK, Arlington, Virginia: General permit coverage VAR10U340, held by CBG Building Company LLC; Construction stormwater; Effective; issued July 1, 2024, term to June 30, 2029, by VA DEQ; discharges to Potomac River-Pimmit Run.
- September 16, 2026: Evaluation (S).
- September 4, 2026: Evaluation (S).
Virginia holds 6,257 Construction stormwater coverages of this permit type in EPA’s file; 3,403 were issued before VAR10U340. CBG Building Company LLC holds 4 permits in Virginia.
Other permits held by CBG Building Company LLC
- REDEVELOPMENT OF 1901 N. MOORE STREET, Arlington: VAR10S051, issued 2019-07-01
- 1501 FAIRFAX DRIVE, Arlington: VAR10U872, issued 2024-07-01
- 10TH AND IRVING, Arlington: VAR10V086, issued 2024-07-01
Coverages issued nearest VAR10U340
- 2024-07-01: TOWERVIEW SELF STORAGE, Herndon: VAR10U333, held by AMIN SS2, LLC
- 2024-07-01: MASSAPONAX ELEVATED WATER STORAGE TANK, Fredericksburg: VAR10U335, held by Spotsylvania County Utilities/Public Works
- 2024-07-01: TIGHTSQUEEZE DEVELOPMENT, Chatham: VAR10U337, held by Guy P Riddle Inc
- 2024-07-01: ROE PROPERTIES WESTINGHOUSE ROAD GRADING SITE, Abingdon: VAR10U338, held by Roe Properties LLC
- 2024-07-01: HAMPTON MANOR ASSISTED LIVING, Virginia Beach: VAR10U339, held by The Delventhal Company
- 2024-07-01: THE POINTE AT LAUREL LAKES, Glen Allen: VAR10U341, held by NVR, Inc.
- 2024-07-01: BELDALE SOLAR, Powhatan: VAR10U342, held by Virginia Electric and Power Co d/b/a Dominion Ener
- 2024-07-01: FULKS RUN FIRE STATION, Fulks Run: VAR10U346, held by Harman Construction, Inc.
- 2024-07-01: ELBOW ROAD EXTENDED PHASE IIB AND IIC, Virginia Beach: VAR10U349, held by Archer Western Construction, LLC
- 2024-07-01: PATRIOTS WALKE, Chesapeake: VAR10U350, held by Kirk-Old PW, LLC
CRYSTAL HOUSE 3 - EARLY UTILITY WORK among its neighbors
129 discharge permits are in the Pimmit Run-Potomac River subwatershed (HUC 020700100103); VAR10U340 is one.
Other permits in the Pimmit Run-Potomac River subwatershed (HUC 020700100103)
- 1 K STREET SW, Dc: 03R10I00N, minor, term to 2027-02-16
- 10TH AND IRVING, Arlington: VAG830644, minor, term to 2028-02-29
- 10TH AND IRVING, Arlington: VAR10V086, minor, term to 2029-06-30
- 113 POTOMAC AVENUE SW, Washington: DCR1000A4, minor, term to 2027-02-16
- 12 STREET AND CONSTITUTION PUMP STATION, Washington: DCNOEJ00I, minor, term to 2023-09-18
- 12 STREET AND MAINE AVENUE PUMPING STATION, Washington: DCNOEJ00J, minor, term to 2023-09-18
- 14 STREET BRIDGE PUMPING STATION, Washington: DCNOEJ00E, minor, term to 2023-09-18
- 1501 FAIRFAX DRIVE, Arlington: VAR10U872, minor, term to 2029-06-30
- 15TH AND S APARTMENTS, Washington: DCR10008T, minor, term to 2022-02-15
- 1812 N MOORE STREET, Arlington: VAG830340, minor, term to 2023-02-25
What stands out
- Its term runs 4 years and 364 days, July 1, 2024 to June 30, 2029.
- Its newest dated event on file is an inspection on September 16, 2026.
- In the 365 days to September 15, 2026, it was dated 1 inspection.
- EPA's file dates 2 events for it, all in 2026.
- It is one of 13,137 discharge permits on the register in Virginia; 6,257 of them (48%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | CRYSTAL HOUSE 3 - EARLY UTILITY WORK |
|---|---|
| Permittee | CBG Building Company LLC |
| NPDES ID | VAR10U340 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | July 1, 2024 |
| Expires | June 30, 2029 |
| Agency | VA DEQ |
| Address | Arlington, VA 22202 |
| Receiving water | Potomac River-Pimmit Run |
| Subwatershed | Pimmit Run-Potomac River (HUC 020700100103) |
NPDES VAR10U340: effluent limits and exceedances
CRYSTAL HOUSE 3 - EARLY UTILITY WORK (NPDES VAR10U340): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES VAR10U340: no pollutant row on file.
NPDES VAR10U340: inspections, violations and enforcement
NPDES VAR10U340: 2 inspections
| Date | What EPA recorded | Agency |
|---|---|---|
| September 16, 2026 | Evaluation | S |
| September 4, 2026 | Evaluation | S |
NPDES VAR10U340 (CRYSTAL HOUSE 3 - EARLY UTILITY WORK): no single-event violation, formal enforcement action and informal enforcement action on file.
Watch NPDES VAR10U340
NPDES VAR10U340: one email when its EPA record changes — $99/month.
Permits near NPDES VAR10U340
NPDES VAR10U340: 0 pollutant rows, 2 dated events; ICIS-NPDES download, loaded September 15, 2026.