LINE 27 BURTON – BAYSIDE 115 KV REBUILD, Virginia Beach, VA: NPDES VAR10U870 discharge permit, effluent exceedances, inspections, penalties
LINE 27 BURTON – BAYSIDE 115 KV REBUILD, Virginia Beach, Virginia: General permit coverage VAR10U870, held by Virginia Electric and Power Company d/b/a Dominion; Construction stormwater; Effective; issued July 1, 2024, term to June 30, 2029, by VA DEQ; discharges to Lower Chesapeake Bay-Little Creek.
- July 14, 2026: Evaluation (S).
- July 6, 2026: Evaluation (S).
Virginia holds 6,257 Construction stormwater coverages of this permit type in EPA’s file; 3,403 were issued before VAR10U870. Virginia Electric and Power Company d/b/a Dominion holds 33 permits in Virginia.
Other permits held by Virginia Electric and Power Company d/b/a Dominion
- BOOKERS MILL SOLAR - PART 2, Farnham: VAR10Q451, issued 2019-07-01
- SWEET SUE SOLAR, Aylett: VAR10Q543, issued 2019-07-01
- MOUNT STORM TO VALLEY 500 KV TRANSMISSION LINE 550, Fulks Run: VAR10R202, issued 2019-07-01
- FOUNTAIN CREEK SOLAR - PART I, Emporia: VAR10R239, issued 2019-07-01
- FOUNTAIN CREEK SOLAR - PART II, Emporia: VAR10R240, issued 2019-07-01
- NORGE SOLAR ELECTRIC POWER PLANT, Williamsburg: VAR10R411, issued 2019-07-01
- WISHING STAR SUBSTATION, Loudoun: VAR10S325, issued 2019-07-01
- NORTH RIDGE SOLAR, Powhatan: VAR10S945, issued 2019-07-01
- LINE 568 STRUCTURE RELOCATIONS, Prince William County: VAR10U377, issued 2024-07-01
- LINE #183 PARTIAL REBUILD BRISTERS TO JOPLIN ROAD, Bealeton: VAR10U435, issued 2024-07-01
Coverages issued nearest VAR10U870
- 2024-07-01: MACAA REDEVELOPMENT, Charlottesville: VAR10U864, held by Piedmont Housing Alliance
- 2024-07-01: DVA-6 PHASE 4B PIPELINE REPLACEMENT, Prince William: VAR10U865, held by Columbia Gas of Virginia, Inc.
- 2024-07-01: FUNNY BONE, Virginia Beach: VAR10U866, held by Core 22 Design Build, LLC
- 2024-07-01: HOLTZMAN WINCHESTER (SNOWDEN BRIDGE BLVD.), Winchester: VAR10U868, held by Snowden Bridge Station, LLC
- 2024-07-01: GUNSTON FIRE STATION #20, Fairfax: VAR10U869, held by SCHEIBEL INCORPORATED
- 2024-07-01: HABITAT FOR HUMANITY AIRPORT ROAD TOWNHOMES, Blacksburg: VAR10U871, held by Habitat for Humanity of the New River Valley
- 2024-07-01: 1501 FAIRFAX DRIVE, Arlington: VAR10U872, held by CBG Building Company LLC
- 2024-07-01: VERVE CHARLOTTESVILLE, Charlottesville: VAR10U873, held by Charlottesville Stadium Road Properties KP7, LLC
- 2024-07-01: JENNIE DEAN ELEMENTARY SCHOOL, Manassas: VAR10U874, held by Howard Shockey & Sons, Inc.
- 2024-07-01: CAPSTONE SUBDIVISION, Blacksburg: VAR10U875, held by SHAH Development LLC
LINE 27 BURTON – BAYSIDE 115 KV REBUILD among its neighbors
39 discharge permits are in the Little Creek-Lower Chesapeake Bay subwatershed (HUC 020801080202); VAR10U870 is one.
Other permits in the Little Creek-Lower Chesapeake Bay subwatershed (HUC 020801080202)
- ARAGONA PEMBROKE LITTLE LEAGUE, Virginia Beach: VAR10J748, minor, term to 2024-06-30
- COBB'S MARINA INCORPORATED, Norfolk: VAR050244, minor, term to 2024-06-30
- CRYSTAL CLEAN LLC – NORFOLK, Norfolk: VAR051722, minor, term to 2024-06-30
- DIAMOND SPRINGS ELEMENTARY EXPANSION, Virginia Beach: VAR10X276, minor, term to 2029-06-30
- EAST BEACH PHASE 7, Norfolk: VAR10C596, minor, term to 2024-06-30
- ENTERPRISE RENT A CAR-2017 INDEPENDENCE BLVD, Virginia Beach: VAG750266, minor, term to 2022-10-15
- GRAND LAKE CREST, Virginia Beach: VAR10W591, minor, term to 2029-06-30
- HRSD - CHESAPEAKE-ELIZABETH SEWAGE TREATMENT PLANT, Virginia Beach: VA0081264, major, term to 2017-10-25
- HRSD-CHESAPEAKE/ELIZABETH STP, Virginia Beach: VAL081264, minor, term to 2025-12-31
- JOINT BASE LITTLE CREEK - FT STORY MS4, Virginia Beach City: VAR040141, minor, term to 2023-10-31
What stands out
- Its term runs 4 years and 364 days, July 1, 2024 to June 30, 2029.
- Its newest dated event on file is an inspection on July 14, 2026, 92 days before EPA's file was loaded.
- In the 365 days to October 14, 2026, it was dated 2 inspections.
- EPA's file dates 2 events for it, all in 2026.
- It is one of 13,137 discharge permits on the register in Virginia; 6,257 of them (48%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | LINE 27 BURTON – BAYSIDE 115 KV REBUILD |
|---|---|
| Permittee | Virginia Electric and Power Company d/b/a Dominion |
| NPDES ID | VAR10U870 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | July 1, 2024 |
| Expires | June 30, 2029 |
| Agency | VA DEQ |
| Address | Virginia Beach, VA 23450 |
| Receiving water | Lower Chesapeake Bay-Little Creek |
| Subwatershed | Little Creek-Lower Chesapeake Bay (HUC 020801080202) |
NPDES VAR10U870: effluent limits and exceedances
LINE 27 BURTON – BAYSIDE 115 KV REBUILD (NPDES VAR10U870): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES VAR10U870: no pollutant row on file.
NPDES VAR10U870: inspections, violations and enforcement
NPDES VAR10U870: 2 inspections
| Date | What EPA recorded | Agency |
|---|---|---|
| July 14, 2026 | Evaluation | S |
| July 6, 2026 | Evaluation | S |
NPDES VAR10U870 (LINE 27 BURTON – BAYSIDE 115 KV REBUILD): no single-event violation, formal enforcement action and informal enforcement action on file.
Watch NPDES VAR10U870
NPDES VAR10U870: one email when its EPA record changes — $99/month.
Permits near NPDES VAR10U870
NPDES VAR10U870: 0 pollutant rows, 2 dated events; ICIS-NPDES download, loaded October 14, 2026.