NPDES VAR10V051 · Clean Water Act
PROJECT TROPICAL PHASE 1 - SITE LOGISTICS AREA AND, Sandston, VA: NPDES VAR10V051 discharge permit, effluent exceedances, inspections, penalties
PROJECT TROPICAL PHASE 1 - SITE LOGISTICS AREA AND, Sandston, Virginia: General permit coverage VAR10V051, held by DPR Construction, A General Partnership; Construction stormwater; Effective; issued July 1, 2024, term to June 30, 2029, by VA DEQ; discharges to White Oak Swamp.
- September 23, 2026: Evaluation (S).
Virginia holds 6,257 Construction stormwater coverages of this permit type in EPA’s file; 3,403 were issued before VAR10V051. DPR Construction, A General Partnership holds 4 permits in Virginia.
Other permits held by DPR Construction, A General Partnership
- DIGITAL FILIGREE DEMOLITION PLAN, Ashburn Va: VAR10U799, issued 2024-07-01
- PROJECT TROPICAL PHASE 2 - DATA CENTER AND SUBSTAT, Sandston: VAR10W563, issued 2024-07-01
- DIGITAL WAXPOOL ROAD- ACC11, Ashburn: VAR10X265, issued 2024-07-01
Coverages issued nearest VAR10V051
- 2024-07-01: LAKE ANNA TOWN CENTER LLC LOT 1, Louisa County: VAR10V043, held by Green Springs Holding LLC
- 2024-07-01: FLEETS BRANCH STREAM RESTORATION - PHASE 2, Chesterfield: VAR10V044, held by Summit Environmental Services, LLC
- 2024-07-01: CENTREVILLE RD TO MONROE ST, Fairfax: VAR10V045, held by The Fishel Co
- 2024-07-01: VALLEY BAPTIST CHURCH, Stuarts Draft: VAR10V046, held by George Owen Construction LLC
- 2024-07-01: BELFORD STREET DEVELOPMENT, Roanoke: VAR10V049, held by Brad Graham Real Estate
- 2024-07-01: CIRCLE K GAS STATION, Lexington: VAR10V054, held by RPT Rockbridge LLC
- 2024-07-01: PROSPECT WEST, Suffolk: VAR10V055, held by PROSPECT WEST 1 LLC
- 2024-07-01: RAINEY FARMS BORROW & SPOILS SITE, South Hill: VAR10V056, held by J. A. Barker Construction, Inc
- 2024-07-01: SMITH MOUNTAIN LAKE HEALTH AND REHAB, Franklin County: VAR10V059, held by Saber Healthcare Group
- 2024-07-01: WORK DISTRICT 2.0 WAREHOUSE, Lynchburg: VAR10V060, held by Dantas Properties LLC
PROJECT TROPICAL PHASE 1 - SITE LOGISTICS AREA AND among its neighbors
35 discharge permits are in the White Oak Swamp subwatershed (HUC 020802060503); VAR10V051 is one.
Other permits in the White Oak Swamp subwatershed (HUC 020802060503)
- ARMY AVIATION SUPPORT FACILITY, Sandstone: VAR10U641, minor, term to 2029-06-30
- ARMY AVIATION SUPPORT FACILITY, Sandston: VAR10U801, minor, term to 2029-06-30
- GATEWAY AT LANDMARK, Sandston: VAR10U590, minor, term to 2029-06-30
- GATEWAY AT LANDMARK SECTION 1, Sandston: VAR10S984, minor, term to 2024-06-30
- LAFRANCE PROPERTIES AT PORTUGEE INDUSTRIAL CENTER, Sandston: VAR10U258, minor, term to 2029-06-30
- LANDMARK, Sandston: VAR10T233, minor, term to 2024-06-30
- LANDMARK SECTION 1 AND 2, Sandston: VAR10R471, minor, term to 2024-06-30
- LANDMARK SECTION 3, Sandston: VAR10T699, minor, term to 2024-06-30
- LEE HY CONSTRUCTION LLC PORTUGEE RD 4, Sandston: VAR051024, minor, term to 2024-06-30
- PARKSIDE TOWNES, Sandston: VAR10T356, minor, term to 2024-06-30
What stands out
- Its term runs 4 years and 364 days, July 1, 2024 to June 30, 2029.
- Its newest dated event on file is an inspection on September 23, 2026, 21 days before EPA's file was loaded.
- In the 365 days to October 14, 2026, it was dated 1 inspection.
- EPA's file dates 1 event for it, all in 2026.
- It is one of 13,137 discharge permits on the register in Virginia; 6,257 of them (48%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | PROJECT TROPICAL PHASE 1 - SITE LOGISTICS AREA AND |
|---|---|
| Permittee | DPR Construction, A General Partnership |
| NPDES ID | VAR10V051 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | July 1, 2024 |
| Expires | June 30, 2029 |
| Agency | VA DEQ |
| Address | Sandston, VA 23150 |
| Receiving water | White Oak Swamp |
| Subwatershed | White Oak Swamp (HUC 020802060503) |
NPDES VAR10V051: effluent limits and exceedances
PROJECT TROPICAL PHASE 1 - SITE LOGISTICS AREA AND (NPDES VAR10V051): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES VAR10V051: no pollutant row on file.
NPDES VAR10V051: inspections, violations and enforcement
NPDES VAR10V051: 1 inspection
| Date | What EPA recorded | Agency |
|---|---|---|
| September 23, 2026 | Evaluation | S |
NPDES VAR10V051 (PROJECT TROPICAL PHASE 1 - SITE LOGISTICS AREA AND): no single-event violation, formal enforcement action and informal enforcement action on file.
Watch NPDES VAR10V051
NPDES VAR10V051: one email when its EPA record changes — $99/month.
Permits near NPDES VAR10V051
NPDES VAR10V051: 0 pollutant rows, 1 dated events; ICIS-NPDES download, loaded October 14, 2026.