NPDES VAR10V115 · Clean Water Act
ELKWOOD OFFICE BUILDING, Culpeper, VA: NPDES VAR10V115 discharge permit, effluent exceedances, inspections, penalties
ELKWOOD OFFICE BUILDING, Culpeper, Virginia: General permit coverage VAR10V115, held by G & M Property Management Inc; Construction stormwater; Effective; issued July 1, 2024, term to June 30, 2029, by VA DEQ; discharges to Rappahannock River-Ruffans Run.
- April 15, 2026: Evaluation (S).
- March 24, 2026: Evaluation (S).
Virginia holds 6,257 Construction stormwater coverages of this permit type in EPA’s file; 3,403 were issued before VAR10V115.
Coverages issued nearest VAR10V115
- 2024-07-01: OLD GREENVILLE POULTRY HOUSES, Stuarts Draft: VAR10V109, held by Jacob Leonard
- 2024-07-01: DAVES STORE SUBSTATION, Gainesville: VAR10V111, held by Virginia Electric and Power Company, d/b/a Dominio
- 2024-07-01: LINE 588 FENTRESS YADKIN 500 KV REBUILD PHASE 1, Chesapeake: VAR10V112, held by Virginia Electric and Power Co dba Dominion Energy
- 2024-07-01: DRY FORK SOLAR, Chatham: VAR10V113, held by Dry Fork Solar 1 LLC
- 2024-07-01: MEADOWBROOK COMMERCIAL PAD E&S, Dave District: VAR10V114, held by Solar ESG Development LLC
- 2024-07-01: WALLOPS ISLAND CAUSEWAY BRIDGE OVER CAT CREEK REPL, Wallops Island: VAR10V118, held by Kokosing Construction Company, Inc.
- 2024-07-01: BRUNSWICK ACADEMY NEW ATHLETIC PRACTICE FIELD, Lawrenceville: VAR10V119, held by Brunswick Academy
- 2024-07-01: ARMSTRONG ELEMENTARY SCHOOL, Reston: VAR10V120, held by SAN JOSE CONSTRUCTION GROUP, INC
- 2024-07-01: NISOURCE COVINGTON OPERATIONS CENTER, Covington: VAR10V122, held by NiSource Corporate Services Company
- 2024-07-01: BEDFORD PRIMARY SCHOOL BUILDING ADDITION, Bedford: VAR10V126, held by Jamerson-Lewis Construction, Inc.
ELKWOOD OFFICE BUILDING among its neighbors
30 discharge permits are in the Ruffans Run-Rappahannock River subwatershed (HUC 020801030602); VAR10V115 is one.
Other permits in the Ruffans Run-Rappahannock River subwatershed (HUC 020801030602)
- 17/66 LOT 10B CUL-DE-SAC, Marshall: VAR10Q787, minor, term to 2024-06-30
- BANTLY DANIEL RESIDENCE, Elkwood: VAG406714, minor, term to 2026-07-31
- BUCHNER RONALD RESIDENCE, Remington: VAG406746, minor, term to 2026-07-31
- CULPEPER COUNTY INDUSTRIAL AIRPARK STP, Culpeper: VA0068586, minor, term to 2021-08-31
- CULPEPER REGIONAL AIRPORT, Brandy Station: VAR050984, minor, term to 2024-06-30
- ELKWOOD STORAGE YARD, Lpeper County,: VAR10X385, minor, term to 2029-06-30
- EURO COMPOSITES CORPORATION, Culpeper: VAR10T440, minor, term to 2024-06-30
- EUROCOMPOSITES CORPORATION, Elkwood: VAR052450, minor, term to 2024-06-30
- GIBSON RESIDENCE AND ELKWOOD POST OFFICE, Elkwood: VAG406023, minor, term to 2026-07-31
- GREENHOUSE ROAD EXTENSION, Brandy Station: VAR10T191, minor, term to 2024-06-30
What stands out
- Its term runs 4 years and 364 days, July 1, 2024 to June 30, 2029.
- Its newest dated event on file is an inspection on April 15, 2026, 153 days before EPA's file was loaded.
- In the 365 days to September 15, 2026, it was dated 2 inspections.
- EPA's file dates 2 events for it, all in 2026.
- It is one of 13,137 discharge permits on the register in Virginia; 6,257 of them (48%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | ELKWOOD OFFICE BUILDING |
|---|---|
| Permittee | G & M Property Management Inc |
| NPDES ID | VAR10V115 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | July 1, 2024 |
| Expires | June 30, 2029 |
| Agency | VA DEQ |
| Address | Culpeper, VA 22718 |
| Receiving water | Rappahannock River-Ruffans Run |
| Subwatershed | Ruffans Run-Rappahannock River (HUC 020801030602) |
NPDES VAR10V115: effluent limits and exceedances
ELKWOOD OFFICE BUILDING (NPDES VAR10V115): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES VAR10V115: no pollutant row on file.
NPDES VAR10V115: inspections, violations and enforcement
NPDES VAR10V115: 2 inspections
| Date | What EPA recorded | Agency |
|---|---|---|
| April 15, 2026 | Evaluation | S |
| March 24, 2026 | Evaluation | S |
NPDES VAR10V115 (ELKWOOD OFFICE BUILDING): no single-event violation, formal enforcement action and informal enforcement action on file.
Watch NPDES VAR10V115
NPDES VAR10V115: one email when its EPA record changes — $99/month.
Permits near NPDES VAR10V115
NPDES VAR10V115: 0 pollutant rows, 2 dated events; ICIS-NPDES download, loaded September 15, 2026.