Velarion Records
Free: one email when NPDES VAR10W515 changes. Unsubscribe any time.

NPDES VAR10W515 · Clean Water Act

CAMBRIDGE PAVERS NEW MANUFACTURING FACILITY, Ringgold, VA: NPDES VAR10W515 discharge permit, effluent exceedances, inspections, penalties

CAMBRIDGE PAVERS NEW MANUFACTURING FACILITY, Ringgold, Virginia: General permit coverage VAR10W515, held by Sellers Brothers Inc; Construction stormwater; Effective; issued July 1, 2024, term to June 30, 2029, by VA DEQ; discharges to Dan River-Cane Creek.

  • September 16, 2026: Evaluation (S).
  • August 24, 2026: Evaluation (S).
  • July 16, 2026: State CWA Penalty AO (State), $8,071 state or local penalty.
  • June 23, 2026: Evaluation (S).
  • April 14, 2026: Evaluation (S).
  • March 25, 2026: Notice of Violation (State).
  • March 16, 2026: Evaluation (S).

Virginia holds 6,257 Construction stormwater coverages of this permit type in EPA’s file; 3,403 were issued before VAR10W515. Sellers Brothers Inc holds 2 permits in Virginia.

Other permits held by Sellers Brothers Inc

Coverages issued nearest VAR10W515

CAMBRIDGE PAVERS NEW MANUFACTURING FACILITY among its neighbors

18 discharge permits are in the Cane Creek-Dan River subwatershed (HUC 030101040109); VAR10W515 is one.

Other permits in the Cane Creek-Dan River subwatershed (HUC 030101040109)

What stands out

  • Its term runs 4 years and 364 days, July 1, 2024 to June 30, 2029.
  • Its newest dated event on file is an inspection on September 16, 2026.
  • In the 365 days to September 15, 2026, it was dated 4 inspections, 1 formal enforcement action, 1 informal enforcement action.
  • EPA's file dates 7 events for it, all in 2026.
  • It is one of 13,137 discharge permits on the register in Virginia; 6,257 of them (48%) are in its program, Construction stormwater, and it is a minor discharger.

Identity

FacilityCAMBRIDGE PAVERS NEW MANUFACTURING FACILITY
PermitteeSellers Brothers Inc
NPDES IDVAR10W515
StatusEffective
TypeGeneral permit coverage
ClassMinor
Facility typeNon-POTW
ProgramConstruction stormwater
IssuedJuly 1, 2024
ExpiresJune 30, 2029
AgencyVA DEQ
AddressRinggold, VA 24586
Receiving waterDan River-Cane Creek
SubwatershedCane Creek-Dan River (HUC 030101040109)

NPDES VAR10W515: effluent limits and exceedances

CAMBRIDGE PAVERS NEW MANUFACTURING FACILITY (NPDES VAR10W515): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.

NPDES VAR10W515: no pollutant row on file.

NPDES VAR10W515: inspections, violations and enforcement

NPDES VAR10W515: 5 inspections

DateWhat EPA recordedAgency
September 16, 2026EvaluationS
August 24, 2026EvaluationS
June 23, 2026EvaluationS
April 14, 2026EvaluationS
March 16, 2026EvaluationS

NPDES VAR10W515: 1 formal enforcement action

1 of them with a penalty assessed. How penalties are shown.

DateWhat EPA recordedAgencyFederal penaltyState or local penalty
July 16, 2026State CWA Penalty AOState$8,071

NPDES VAR10W515: 1 informal enforcement action

DateWhat EPA recordedAgency
March 25, 2026Notice of ViolationState

NPDES VAR10W515 (CAMBRIDGE PAVERS NEW MANUFACTURING FACILITY): no single-event violation on file.

Watch NPDES VAR10W515

NPDES VAR10W515: one email when its EPA record changes — $99/month.

Billing

Privacy

Permits near NPDES VAR10W515

NPDES VAR10W515: 0 pollutant rows, 7 dated events; ICIS-NPDES download, loaded September 15, 2026.