FIELDALE SHEFFIELD 138 KV LINE REBUILD, Fieldale, VA: NPDES VAR10W522 discharge permit, effluent exceedances, inspections, penalties

FIELDALE SHEFFIELD 138 KV LINE REBUILD, Fieldale, Virginia: General permit coverage VAR10W522, held by Appalachian Power Co; Construction stormwater; Effective; issued July 1, 2024, term to June 30, 2029, by VA DEQ; discharges to Marrowbone Creek.

  • July 7, 2026: Evaluation (S).
  • June 29, 2026: Evaluation (S).

Virginia holds 6,257 Construction stormwater coverages of this permit type in EPA’s file; 3,403 were issued before VAR10W522. Appalachian Power Co holds 15 permits in Virginia.

Other permits held by Appalachian Power Co

Coverages issued nearest VAR10W522

FIELDALE SHEFFIELD 138 KV LINE REBUILD among its neighbors

30 discharge permits are in the Beaver Creek-Smith River subwatershed (HUC 030101030801); VAR10W522 is one.

Other permits in the Beaver Creek-Smith River subwatershed (HUC 030101030801)

What stands out

  • Its term runs 4 years and 364 days, July 1, 2024 to June 30, 2029.
  • Its newest dated event on file is an inspection on July 7, 2026, 70 days before EPA's file was loaded.
  • In the 365 days to September 15, 2026, it was dated 2 inspections.
  • EPA's file dates 2 events for it, all in 2026.
  • It is one of 13,137 discharge permits on the register in Virginia; 6,257 of them (48%) are in its program, Construction stormwater, and it is a minor discharger.

Identity

FacilityFIELDALE SHEFFIELD 138 KV LINE REBUILD
PermitteeAppalachian Power Co
NPDES IDVAR10W522
StatusEffective
TypeGeneral permit coverage
ClassMinor
Facility typeNon-POTW
ProgramConstruction stormwater
IssuedJuly 1, 2024
ExpiresJune 30, 2029
AgencyVA DEQ
AddressFieldale, VA 24089
Receiving waterMarrowbone Creek
Receiving water impaired303(D) Listed
SubwatershedBeaver Creek-Smith River (HUC 030101030801)

NPDES VAR10W522: effluent limits and exceedances

FIELDALE SHEFFIELD 138 KV LINE REBUILD (NPDES VAR10W522): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.

NPDES VAR10W522: no pollutant row on file.

NPDES VAR10W522: inspections, violations and enforcement

NPDES VAR10W522: 2 inspections

DateWhat EPA recordedAgency
July 7, 2026EvaluationS
June 29, 2026EvaluationS

NPDES VAR10W522 (FIELDALE SHEFFIELD 138 KV LINE REBUILD): no single-event violation, formal enforcement action and informal enforcement action on file.

Watch NPDES VAR10W522

NPDES VAR10W522: one email when its EPA record changes — $99/month.

Billing

Privacy

Permits near NPDES VAR10W522

NPDES VAR10W522: 0 pollutant rows, 2 dated events; ICIS-NPDES download, loaded September 15, 2026.