NPDES VTS008515 · Clean Water Act
SUGARBUSH 2026-2027 CONSTRUCTION PROJECTS, Warren, VT: NPDES VTS008515 discharge permit, effluent exceedances, inspections, penalties
SUGARBUSH 2026-2027 CONSTRUCTION PROJECTS, Warren, Vermont: Individual permit VTS008515, held by Sugarbush Resort Inc; Construction stormwater; Effective; issued April 28, 2026, term to April 27, 2031, by Vermont DEC.
Vermont holds 43 Construction stormwater coverages of this permit type in EPA’s file; 38 were issued before VTS008515.
Coverages issued nearest VTS008515
- 2025-12-08: PROJECT MOOSE, Essex: VTS007809, held by Scannell Properties 759, LLC
- 2026-01-06: FAIRLEE IM 091-2(91), Fairlee: VTS007973, held by Vermont Agency of Transportation
- 2026-01-16: NEW ENGLAND CLEAN POWER LINK (NECPL), Benson: VTS008012, held by Champlain VT, LLC d.b.a TDI-New England
- 2026-04-20: KILLINGTON SKI RESORT CONSTRUCTION PROJECTS INDC, Killington: VTS008093, held by GG Killington LP
- 2026-04-21: HERMITAGE CLUB AT HAYSTACK MOUNTAIN, Wilmington: VTS008035, held by The Hermitage Members Club, Inc.
- 2026-04-30: ECO-RETREAT AT BOORN BROOK FARM, Manchester: VTS008432, held by Jeffrey O. Nyweide
- 2026-06-11: MOUNT SNOW CONSTRUCTION PROJECTS INDC, Dover: VTS008551, held by Mount Snow Ltd.
- 2026-06-12: TOWN OF SHELBURNE - WASTEWATER TREATMENT FACILITIES CONSOLIDATION, CONTRACT NO., Shelburne: VTS008532, held by Town of Shelburne
- 2026-09-02: BETA CHILDCARE FACILITY, BTV-BETA EARTHWORKS, BTV CARGO APRON EXPANSION, South Burlington: VTS008650, held by PC Construction
SUGARBUSH 2026-2027 CONSTRUCTION PROJECTS among its neighbors
6 discharge permits are in the Mill Brook-Mad River subwatershed (HUC 041504030502); VTS008515 is one. Its county: 21, 3 major; VTS008515 is minor permit.
Other permits in the Mill Brook-Mad River subwatershed (HUC 041504030502)
- 2025 CONSTRUCTION PROJECTS, Fayston: VTS007741, minor, term to 2030-02-06
- HEAVEN'S GATE LIFT REPLACEMENT, Warren: VTS007478, minor, term to 2029-02-21
- JOYCE PROPERTY, Fayston: VTS007750, minor, term to 2030-02-06
- OPSAHL, Warren: VTS007216, minor, term to 2028-04-27
- THE RIDER'S OUTPOST, Waitsfield: VTS007215, minor, term to 2028-03-16
What stands out
- Its term runs 4 years and 364 days, April 28, 2026 to April 27, 2031.
- No dated event in the 365 days to September 15, 2026.
- It is one of 1,103 discharge permits on the register in Vermont; 48 of them (4.4%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | SUGARBUSH 2026-2027 CONSTRUCTION PROJECTS |
|---|---|
| Permittee | Sugarbush Resort Inc |
| NPDES ID | VTS008515 |
| Status | Effective |
| Type | Individual permit |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | April 28, 2026 |
| Expires | April 27, 2031 |
| Agency | Vermont DEC |
| Address | Warren, VT 05674 |
| Subwatershed | Mill Brook-Mad River (HUC 041504030502) |
| Other EPA IDs (FRS) | RCRA handler VTP000562496 |
NPDES VTS008515: effluent limits and exceedances
SUGARBUSH 2026-2027 CONSTRUCTION PROJECTS (NPDES VTS008515): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES VTS008515: no pollutant row on file.
NPDES VTS008515: inspections, violations and enforcement
NPDES VTS008515 (SUGARBUSH 2026-2027 CONSTRUCTION PROJECTS): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES VTS008515
NPDES VTS008515: one email when its EPA record changes — $99/month.
Permits near NPDES VTS008515
NPDES VTS008515: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.