EPA · discharge permits by city
Discharge permits in Easton, Washington
- 6Current permits
Permits
Major dischargers first. Permits are placed by the address on the permit, which is the operation’s own, not the outfall’s.
| Permit holder | NPDES ID | Program | Discharger | Receiving water |
|---|---|---|---|---|
| ELLENSBURG CEMENT EASTON PIT | WAG505061 | Minor | Tarpiscan Creek | |
| ELLENSBURG CEMENT PRODUCTS EASTON RIP RAP | WAG505162 | Minor | Little Creek-Yakima River | |
| I 90 CABIN CREEK IC TO W EASTON IC PHASE 3 ADD LANES BUILD WILDLIFE BRIDGES | WAR310604 | Construction stormwater | Minor | Stampede Creek-Yakima River |
| KACHESS DAM MODIFICATION PHASE 1 | WAR10I02X | Construction stormwater | Minor | Little Creek-Yakima River |
| MARIAN MEADOWS PUD | WAR313124 | Construction stormwater | Minor | Little Creek-Yakima River |
| STAMPEDE SAND & GRAVEL LLC | WAG505198 | Minor | Stampede Creek-Yakima River |