EPA · discharge permits by city
Discharge permits in Packwood, Washington
- 4Current permits
Permits
Major dischargers first. Permits are placed by the address on the permit, which is the operation’s own, not the outfall’s.
| Permit holder | NPDES ID | Program | Discharger | Receiving water |
|---|---|---|---|---|
| FRYINGPAN CREEK BRIDGE WA NP MORA 11(1) | WAR10F0CF | Construction stormwater | Minor | Headwaters White River |
| OHANAPECOSH CAMPGROUND | WAR10F0AL | Construction stormwater | Minor | Ohanapecosh River |
| SR 123 LAUGHINGWATER CREEK BRIDGE TO PANTHER CREEK BRIDGE | WAR10F0AT | Construction stormwater | Minor | Ohanapecosh River |
| WA NP MORA 123(2), LAUGHINGWATER CREEK TO PANTHER CREEK BRIDGE | WAR10F08M | Construction stormwater | Minor | Ohanapecosh River |