NPDES WAG030141 · Clean Water Act
FAIRHAVEN MARINE INDUSTRIAL PARK (BIRDON AMERICA, INC.), Bellingham, WA: NPDES WAG030141 discharge permit, effluent exceedances, inspections, penalties
FAIRHAVEN MARINE INDUSTRIAL PARK (BIRDON AMERICA, INC.), Bellingham, Washington: General permit coverage WAG030141, held by Birdon America, Inc.; Effective; issued July 20, 2022, term to August 31, 2027, by State.
- pH, maximum: 6 limits, 6 violations of any kind.
- Turbidity: 3 limits, 3 violations of any kind.
- Copper, total [as Cu]: 3 limits, 3 violations of any kind.
- Zinc, total [as Zn]: 3 limits, 3 violations of any kind.
- Total Petroleum Hydrocarbons - Diesel: 3 limits, 3 violations of any kind.
- Oil and grease visual: 3 limits, 3 violations of any kind.
FAIRHAVEN MARINE INDUSTRIAL PARK (BIRDON AMERICA, INC.) among its neighbors
24 discharge permits are in the Chuckanot Creek-Frontal Bellingham Bay subwatershed (HUC 171100040604); WAG030141 is one. Its county: 327, 4 major; WAG030141 is minor permit.
Other permits in the Chuckanot Creek-Frontal Bellingham Bay subwatershed (HUC 171100040604)
- 1021 GRANARY AVENUE, Bellingham: WAR309080, minor, term to 2025-12-31
- 2015 SEWER REPLACEMENT, Bellingham: WAR303561, minor, term to 2015-12-31
- 39TH STREET N O CONNELLY AVENUE, Bellingham: WAR124815, minor, term to 2015-12-31
- BELLINGHAM SHIPPING TERMINAL, Bellingham: WAR126689, minor, term to 2014-12-31
- BELLINGHAM SHIPPING TERMINAL POB, Bellingham: WAR305536, minor, term to 2024-12-31
- BELLINGHAM WWTP, Bellingham: WA0025968
- CARVER ACADEMIC RENOVATION, Bellingham: WAR303186, minor, term to 2015-12-31
- ENCOGEN GENERATING STATION, Bellingham: WAR126967, minor, term to 2024-12-31
- FAIRHAVEN MARINE INDUSTRIAL PARK, Bellingham: WAR313586, minor, term to 2025-12-31
- GALBRAITH HEIGHTS, Bellingham: WAR315426, minor, term to 2030-12-31
What stands out
- Its term runs 5 years and 42 days, July 20, 2022 to August 31, 2027.
- No dated event in the 365 days to September 15, 2026.
- It is one of 8,573 discharge permits on the register in Washington; the file names no program for it, and it is a minor discharger.
Identity
| Facility | FAIRHAVEN MARINE INDUSTRIAL PARK (BIRDON AMERICA, INC.) |
|---|---|
| Permittee | Birdon America, Inc. |
| NPDES ID | WAG030141 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Issued | July 20, 2022 |
| Expires | August 31, 2027 |
| Agency | State |
| Address | Bellingham, WA 98225 |
| Receiving water impaired | 303(D) Listed |
| Subwatershed | Chuckanot Creek-Frontal Bellingham Bay (HUC 171100040604) |
NPDES WAG030141: effluent limits and exceedances
FAIRHAVEN MARINE INDUSTRIAL PARK (BIRDON AMERICA, INC.) (NPDES WAG030141): 6 pollutants on file, 6 limited; 6 with a violation of any kind, 0 with an exceedance.
| Pollutant | Limits | Violations | Exceedances | Latest | Largest, as filed |
|---|---|---|---|---|---|
| pH, maximum | 6 | 6 | 0 | ||
| Turbidity | 3 | 3 | 0 | ||
| Copper, total [as Cu] | 3 | 3 | 0 | ||
| Zinc, total [as Zn] | 3 | 3 | 0 | ||
| Total Petroleum Hydrocarbons - Diesel | 3 | 3 | 0 | ||
| Oil and grease visual | 3 | 3 | 0 |
NPDES WAG030141: inspections, violations and enforcement
NPDES WAG030141 (FAIRHAVEN MARINE INDUSTRIAL PARK (BIRDON AMERICA, INC.)): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES WAG030141
NPDES WAG030141: one email when its EPA record changes — $99/month.
Permits near NPDES WAG030141
NPDES WAG030141: 6 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.