NPDES WAR10F06E · Clean Water Act
PROJECT GJKZ1105385 REPAIR ROAD & UTILITIES EAKER AVE., FAIRCHILD AFB, WA, Fairchild Afb, WA: NPDES WAR10F06E discharge permit, effluent exceedances, inspections, penalties
PROJECT GJKZ1105385 REPAIR ROAD & UTILITIES EAKER AVE., FAIRCHILD AFB, WA, Fairchild Afb, Washington: General permit coverage WAR10F06E, held by NNAC, Inc.; Construction stormwater; Not needed.
Washington holds 4,744 Construction stormwater coverages of this permit type in EPA’s file. NNAC, Inc. holds 4 permits in Washington.
Other permits held by NNAC, Inc.
- ADAL FLIGHT SIMULATOR FACILITY B2048, Fairchild Afb: WAR10F09C
- ADAL FLIGHT SIMULATOR FACILITY 2048, Fairchild Afb: WAR10F09D
- ADAL FLIGHT SIMULATOR PROJECT, B2048, FAIRCHILD AFB, WA, Fairchild Afb: WAR10F0AA, issued 2024-11-13
PROJECT GJKZ1105385 REPAIR ROAD & UTILITIES EAKER AVE., FAIRCHILD AFB, WA among its neighbors
11 discharge permits are in the Deep Creek subwatershed (HUC 170103070104); WAR10F06E is one.
Other permits in the Deep Creek subwatershed (HUC 170103070104)
- AIR FORCE (HQ 92D) AIR REFUELING, Fairchild Afb: WAR05B94F
- CRAIG ROAD ESP, Airway Heights: WAR315079, minor, term to 2025-12-31
- FAIRCHILD AIR FORCE BASE, Fairchild Afb: WAG87003E, minor, term to 2026-10-30
- FAIRCHILD AIR FORCE BASE, Fairchild Air Force Base: WAR10F0C2, minor, term to 2027-02-16
- GORDON BRIDGE NO 1506, Spokane: WAR315417, minor, term to 2030-12-31
- HIGHLAND VILLAGE 3RD ADDITION, Airway Heights: WAR315642, minor, term to 2030-12-31
- HUNTERS CROSSING NORTH 1ST ADDITION, Airway Heights: WAR311380, minor, term to 2025-12-31
- INTERSTATE CONCRETE AIRWAY PIT, Airway Heights: WAG507125, minor, term to 2026-03-31
- RENOVATE (RM/MC) OUTDOOR TRACK & FIELD, FAIRCHILD AFB, WA, Fairchild Afb: WAR10F04O
- SPOKANE TRIBE ECONOMIC PROJECT PHASE 2, Airway Heights: WAR10I01R, minor, term to 2022-02-15
What stands out
- No dated event in the 365 days to September 15, 2026.
- It is one of 8,573 discharge permits on the register in Washington; 4,744 of them (55%) are in its program, Construction stormwater.
Identity
| Facility | PROJECT GJKZ1105385 REPAIR ROAD & UTILITIES EAKER AVE., FAIRCHILD AFB, WA |
|---|---|
| Permittee | NNAC, Inc. |
| NPDES ID | WAR10F06E |
| Status | Not needed |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Address | Fairchild Afb, WA 99011 |
| Subwatershed | Deep Creek (HUC 170103070104) |
NPDES WAR10F06E: effluent limits and exceedances
PROJECT GJKZ1105385 REPAIR ROAD & UTILITIES EAKER AVE., FAIRCHILD AFB, WA (NPDES WAR10F06E): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES WAR10F06E: no pollutant row on file.
NPDES WAR10F06E: inspections, violations and enforcement
NPDES WAR10F06E (PROJECT GJKZ1105385 REPAIR ROAD & UTILITIES EAKER AVE., FAIRCHILD AFB, WA): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES WAR10F06E
NPDES WAR10F06E: one email when its EPA record changes — $99/month.
Permits near NPDES WAR10F06E
NPDES WAR10F06E: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.