NPDES WAR10F0CS · Clean Water Act
RM18-1806 (PHASE 2) REPAIR RAILROAD CULVERT RM8.2, Shelton, WA: NPDES WAR10F0CS discharge permit, effluent exceedances, inspections, penalties
RM18-1806 (PHASE 2) REPAIR RAILROAD CULVERT RM8.2, Shelton, Washington: General permit coverage WAR10F0CS, held by NAVFAC NW; Construction stormwater; Effective; issued May 28, 2026, term to February 16, 2027, by U.S. EPA.
Washington holds 4,744 Construction stormwater coverages of this permit type in EPA’s file; 4,643 were issued before WAR10F0CS. NAVFAC NW holds 10 permits in Washington.
Other permits held by NAVFAC NW
- CONVERT PARADE GROUNDS TO PARKING LOT, PSNS, Bremerton: WAR10F07B, issued 2022-05-16
- RENOVATION OF BEQ-13, BUILDING 2701, Oak Harbor: WAR10F083, issued 2023-02-17
- PQ502 COLD WATER TRAINING FACILITY, Keyport: WAR10F0B8, issued 2025-07-17
- P982 ARMORED FIGHTING VEHICLE SUPPORT FACILITY, Silverdale: WAR10F0BK, issued 2025-11-13
- P970 NBK JACKSON PARK CDC, Bremerton: WAR10F0BT, issued 2025-12-22
- RM18-1806 REPAIR RAILROAD CULVERTS PHASE 3, Bremerton: WAR10F0CC, issued 2026-03-23
- SEISMIC REPAIR DD4 BREMERTON - TOPSIDE PAVING, Bremerton: WAR10F0CK, issued 2026-04-22
- REPAIR MISSILE HAUL ROUTE, Silverdale: WAR10F0CM, issued 2026-04-27
- PSNS U-LOT FOUNDATION & INFRASTRUCTURE, Bremerton: WAR10F0D0, issued 2026-07-20
Coverages issued nearest WAR10F0CS
- 2026-04-28: OLYMPIC NATIONAL FOREST, ERFO REPAIRS 2022 (WA EFRO F6 OLYMPIC 2022-1(1)), Forks: WAR10F0CN, held by Bruch & Bruch Construction, Inc.
- 2026-05-07: SAMMAMISH - MAPLE VALLEY ROADS AND IMPAIRMENTS - P06900, Renton: WAR10F0CP, held by Bonneville Power Administration
- 2026-05-22: SUQUAMISH ELEMENTARY SCHOOL, Suquamish: WAR10I046, held by David Carver
- 2026-05-25: HOWARD A. HANSON DAM - FISH PASSAGE FACILITY PROJECT, Palmer: WAR10F0CQ, held by Flatiron-Aecon Joint Venture
- 2026-05-28: RM18-1806 (PHASE 2) REPAIR RAILROAD CULVERT RM8.2, BREMERTON, WA, Shelton: WAR10F0CR, held by GSI Pacific NA JV II LLC
- 2026-06-05: PNNL SEQUIM CAMPUS DEVELOPMENT, Sequim: WAR10F0CU, held by Battelle Memorial Institute, Pacific Northwest Division
- 2026-06-09: MSL7 OFFICE RELOCATION, Sequim: WAR10F0CV, held by Interwest Construction, Inc.
- 2026-06-22: REALIGN 12TH AND LIGGETT AVE, JBLM, Jblm: WAR10F0CW, held by Alutiiq General Contractors, LLC
- 2026-07-15: TWO TROUT CREEK CULVERT REPLACEMENT, Forks: WAR10F0CX, held by Highline Construction
- 2026-07-15: GIFFORD PINCHOT REPAIRS 2020, PHASE 1, Ashford: WAR10F0CY, held by JJH Earthworks LLC
RM18-1806 (PHASE 2) REPAIR RAILROAD CULVERT RM8.2 among its neighbors
22 discharge permits are in the Cranberry Creek-Frontal Oakland Bay subwatershed (HUC 171100190606); WAR10F0CS is one.
Other permits in the Cranberry Creek-Frontal Oakland Bay subwatershed (HUC 171100190606)
- BAYSHORE SAND AND GRAVEL, Shelton: WAG501474, minor, term to 2026-03-31
- BIO RECYCLING CORP, Rochester: WA0026115
- CAMCO INC SHELTON, Shelton: WAR002342, minor, term to 2014-12-31
- CITY OF SHELTON SW, Shelton: WAR308477, minor, term to 2024-07-31
- COSTELLO ROCK, Shelton: WAG501183, minor, term to 2026-03-31
- FRONTIER CONSTRUCTION SUPPLY LLC- SHELTON PLANT, Shelton: WAG501597, minor, term to 2026-03-31
- ISLAND LAKE - LAKE TREATMENT, Unspecified: WAG994192, minor, term to 2026-03-21
- LAKE LIMERICK & LEPRECHAUN - LAKE TREATMENT, Unspecified: WAG994087, minor, term to 2026-03-21
- MANKE FAMILY RESOURCES SHELTON MINE, Shelton: WAG501460, minor, term to 2026-03-31
- MANKE LUMBER SHELTON LOG DUMP, Shelton: WAR000473, minor, term to 2024-12-31
What stands out
- Its term runs 264 days, May 28, 2026 to February 16, 2027.
- No dated event in the 365 days to September 15, 2026.
- It is one of 8,573 discharge permits on the register in Washington; 4,744 of them (55%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | RM18-1806 (PHASE 2) REPAIR RAILROAD CULVERT RM8.2 |
|---|---|
| Permittee | NAVFAC NW |
| NPDES ID | WAR10F0CS |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | May 28, 2026 |
| Expires | February 16, 2027 |
| Agency | U.S. EPA |
| Address | Shelton, WA 98584 |
| Subwatershed | Cranberry Creek-Frontal Oakland Bay (HUC 171100190606) |
NPDES WAR10F0CS: effluent limits and exceedances
RM18-1806 (PHASE 2) REPAIR RAILROAD CULVERT RM8.2 (NPDES WAR10F0CS): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES WAR10F0CS: no pollutant row on file.
NPDES WAR10F0CS: inspections, violations and enforcement
NPDES WAR10F0CS (RM18-1806 (PHASE 2) REPAIR RAILROAD CULVERT RM8.2): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES WAR10F0CS
NPDES WAR10F0CS: one email when its EPA record changes — $99/month.
Permits near NPDES WAR10F0CS
NPDES WAR10F0CS: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.