NPDES WAR10I01C · Clean Water Act
TALLAWHALT PHASE II RESIDENTIAL DEVELOPMENT, La Conner, WA: NPDES WAR10I01C discharge permit, effluent exceedances, inspections, penalties
TALLAWHALT PHASE II RESIDENTIAL DEVELOPMENT, La Conner, Washington: General permit coverage WAR10I01C, held by Keri Lynn Shepherd-Cleary; Construction stormwater; Administratively continued; issued September 11, 2019, term to February 15, 2022, by U.S. EPA.
Washington holds 4,744 Construction stormwater coverages of this permit type in EPA’s file; 1,649 were issued before WAR10I01C.
Coverages issued nearest WAR10I01C
- 2018-09-05: US 101 / HARLOW CREEK - REMOVE FISH BARRIER, Queets: WAR10I011, held by Washington State Dept. of Transportation
- 2018-11-13: UPPER HOH RIVER ROAD PHASE II, Forks: WAR10F035, held by FHWA - Western Federal Lands Highway Division
- 2019-04-05: I-5/PORTLAND AVENUE TO PORT OF TACOMA ROAD - SOUTHBOUND HOV, Fife: WAR10I018, held by Atkinson Construction
- 2019-07-16: LUMMI SHORE DR. PEDESTRIAN PATHWAY, Bellingham: WAR10I01A, held by Lummi Public Works
- 2019-07-16: LUMMI NATION COMMUNITY PARK, Bellingham: WAR10I01B, held by Lummi Indian Business Council
- 2019-10-02: LUMMI NATION COMMUNITY PARK - PHASE 1, Bellingham: WAR10I01D, held by Andy F Kamkoff
- 2019-12-31: SR 164 PUSSYFOOT CREEK FISH PASSAGE PROJECT, Enumclaw: WAR10I01G, held by Washington State Department of Transportation (WSDOT)
- 2020-04-08: REHABILITATE STEVENS CANYON ROAD, MP 5.0 THROUGH 14.0, WA NPS MORA 13(7), Near Longmire: WAR10F052, held by FHWA, Western Federal Lands Highway Division
- 2020-04-13: WA FS ERFO 2017(1) - 22(11) GIFFORD PINCHO REPAIRS 2017, Cowlitz, Lewis, Skamania Cos.: WAR10F053, held by Western Federal Lands Highway Divisin
- 2020-07-02: P386 UNDERSEA VEHICLE MAINTENANCE FACILITY, Keyport: WAR10F05A, held by Naval Facilities Engineering Command NW
TALLAWHALT PHASE II RESIDENTIAL DEVELOPMENT among its neighbors
15 discharge permits are in the Fidalgo Island-Frontal Similk Bay subwatershed (HUC 171100190101); WAR10I01C is one.
Other permits in the Fidalgo Island-Frontal Similk Bay subwatershed (HUC 171100190101)
- BEACHWOOD LANE, Anacortes: WAR302895, minor, term to 2015-12-31
- CAMPBELL LAKE - LAKE TREATMENT, Unspecified: WAG994114, minor, term to 2026-03-21
- COHO REARING PONDS, Laconner: WA0025852
- DOOSDAWHUB TIDAL MARSH RESTORATION SITE, La Conner: WAR10I03L, minor, term to 2027-02-16
- LA CONNER MARITIME SVC, La Conner: WAG030074, minor, term to 2021-07-31
- LA CONNER STP, La Conner: WA0022446, minor, term to 2024-02-29
- LAKE ERIE - LAKE TREATMENT, Unspecified: WAG994112, minor, term to 2026-03-21
- LAKESIDE INDUSTRIES ANACORTES, Anacortes: WAG503197, minor, term to 2026-03-31
- SIMILK ESTUARY RESTORATION, Anacortes: WAR313867, minor, term to 2025-12-31
- SKYLINE MARINA, Anacortes: WAG030039, minor, term to 2021-07-31
What stands out
- Its term runs 2 years and 157 days, September 11, 2019 to February 15, 2022; the term ended 1,702 days before EPA's file was loaded on October 14, 2026, and the file lists the permit as administratively continued.
- No dated event in the 365 days to October 14, 2026.
- It is one of 8,573 discharge permits on the register in Washington; 4,744 of them (55%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | TALLAWHALT PHASE II RESIDENTIAL DEVELOPMENT |
|---|---|
| Permittee | Keri Lynn Shepherd-Cleary |
| NPDES ID | WAR10I01C |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | September 11, 2019 |
| Expires | February 15, 2022 |
| Agency | U.S. EPA |
| Address | La Conner, WA 98257 |
| Subwatershed | Fidalgo Island-Frontal Similk Bay (HUC 171100190101) |
NPDES WAR10I01C: effluent limits and exceedances
TALLAWHALT PHASE II RESIDENTIAL DEVELOPMENT (NPDES WAR10I01C): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES WAR10I01C: no pollutant row on file.
NPDES WAR10I01C: inspections, violations and enforcement
NPDES WAR10I01C (TALLAWHALT PHASE II RESIDENTIAL DEVELOPMENT): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES WAR10I01C
NPDES WAR10I01C: one email when its EPA record changes — $99/month.
Permits near NPDES WAR10I01C
NPDES WAR10I01C: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded October 14, 2026.