NPDES WAR10I02Q · Clean Water Act
TOPPENISH SEWER PHASE 2 IMPROVEMENTS, Toppenish, WA: NPDES WAR10I02Q discharge permit, effluent exceedances, inspections, penalties
TOPPENISH SEWER PHASE 2 IMPROVEMENTS, Toppenish, Washington: General permit coverage WAR10I02Q, held by DW Excavating, Inc.; Construction stormwater; Effective; issued November 25, 2022, term to February 16, 2027, by U.S. EPA.
Washington holds 4,744 Construction stormwater coverages of this permit type in EPA’s file; 3,814 were issued before WAR10I02Q.
Coverages issued nearest WAR10I02Q
- 2022-06-20: QUILLAYUTE RIVER RESTORATION - REACH 3, La Push: WAR10I02N, held by BCI Contracting, Inc.
- 2022-07-07: REHABILITATE STEVENS CANYON ROAD, MP 5.0 THROUGH 14.0, WA NPS MORA 13(7), Near Longmire: WAR10F07G, held by FHWA, Western Federal Lands Highway Division
- 2022-07-07: REHABILITATE STEVENS CANYON ROAD, MP 5.0 THROUGH 14.0, WA NPS MORA 13(7), Near Longmire: WAR10F07H, held by Tucci & Sons, Inc.
- 2022-09-08: HERMOSA HEIGHTS, Quil Ceda Village: WAR10I02O, held by Tulalip Tribes of Washington
- 2022-10-31: ANGEL OF THE WINDS RV RESORT, Arlington: WAR10I02P, held by SCJ Alliance
- 2022-12-29: MUD MOUNTAIN DAM FISH PASSAGE FACILITY, Enumclaw: WAR10I02R, held by KOMAN Integrated Solutions, LLC
- 2023-02-15: ILANI CONVENTION CENTER EXPANSION, Ridgefield: WAR10I02S, held by Swinerton Builders
- 2023-02-17: RENOVATION OF BEQ-13, BUILDING 2701, Oak Harbor: WAR10F083, held by NAVFAC NW
- 2023-03-08: NOCA - STEHEKIN FIRE CACHE, Stehekin: WAR10F085, held by HBHansen Construction
- 2023-04-06: MAIN GATE REPAIR AT FAIRCHILD AIR FORCE BASE, Fairchild Air Force Base: WAR10F08B, held by Northcon Inc.
TOPPENISH SEWER PHASE 2 IMPROVEMENTS among its neighbors
8 discharge permits are in the Wanity Slough-Marion Drain subwatershed (HUC 170300030403); WAR10I02Q is one.
Other permits in the Wanity Slough-Marion Drain subwatershed (HUC 170300030403)
- CITY OF WAPATO - FRENCH LANE IMPROVEMENTS, Wapato: WAR10I01Z
- ENDURANCE FRUIT PROCESSING INC, Wapato: WA0025895
- SILGAN CONTAINER MANUFACTURING, Toppenish: WAR00A171
- WAPATO HP REPLACEMENT, Wapato: WAR10I02U
- WAPATO, CITY OF, Wapato: WAL050229, minor, term to 2025-12-31
- WAPATO, CITY OF - WAPATO WWTP, Wapato: WA0050229, minor, term to 2016-10-31
- YAKAMA NATION - YAKAMA NATION'S LEGENDS CASINO WWTP, Toppenish: WA0026743, minor, term to 2018-10-31
What stands out
- Its term runs 4 years and 83 days, November 25, 2022 to February 16, 2027.
- No dated event in the 365 days to September 15, 2026.
- It is one of 8,573 discharge permits on the register in Washington; 4,744 of them (55%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | TOPPENISH SEWER PHASE 2 IMPROVEMENTS |
|---|---|
| Permittee | DW Excavating, Inc. |
| NPDES ID | WAR10I02Q |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | November 25, 2022 |
| Expires | February 16, 2027 |
| Agency | U.S. EPA |
| Address | Toppenish, WA 98948 |
| Subwatershed | Wanity Slough-Marion Drain (HUC 170300030403) |
NPDES WAR10I02Q: effluent limits and exceedances
TOPPENISH SEWER PHASE 2 IMPROVEMENTS (NPDES WAR10I02Q): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES WAR10I02Q: no pollutant row on file.
NPDES WAR10I02Q: inspections, violations and enforcement
NPDES WAR10I02Q (TOPPENISH SEWER PHASE 2 IMPROVEMENTS): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES WAR10I02Q
NPDES WAR10I02Q: one email when its EPA record changes — $99/month.
Permits near NPDES WAR10I02Q
NPDES WAR10I02Q: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.