NPDES WAR302671 · Clean Water Act
CSO PHASE 2/FRONT STREET STORMWATER, Port Angeles, WA: NPDES WAR302671 discharge permit, effluent exceedances, inspections, penalties
CSO PHASE 2/FRONT STREET STORMWATER, Port Angeles, Washington: General permit coverage WAR302671, held by CSO Phase 2/Front Street Stormwater; Construction stormwater; Administratively continued; issued December 1, 2010, term to December 31, 2015, by State.
- pH: 2 limits, 34 violations of any kind.
- Turbidity: 1 limit, 17 violations of any kind.
- Transparency: 1 limit, 17 violations of any kind.
Washington holds 4,744 Construction stormwater coverages of this permit type in EPA’s file; 112 were issued before WAR302671.
Coverages issued nearest WAR302671
- 2010-12-01: SINNEMA QUAALE UPPER REVETMENT, Carnation: WAR302661, held by Sinnema Quaale Upper Revetment
- 2010-12-01: NE 4TH ST BNSF RR ROW TO 120TH AVE, Bellevue: WAR302662, held by NE 4th St BNSF RR ROW to 120th Ave
- 2010-12-01: ENELL RESIDENCE, Chelan: WAR302664, held by Enell Residence
- 2010-12-01: E12 PARKING LOT RENOVATION, Seattle: WAR302667, held by E12 Parking Lot Renovation
- 2010-12-01: LACAMAS PRAIRIE ESTATES PHASE 1, Vancouver: WAR302669, held by Lacamas Prairie Estates Phase 1
- 2010-12-01: RESIDENCES AT LAKE BOREN, Newcastle: WAR302673, held by Residences at Lake Boren
- 2010-12-01: NE 119TH ST PUD DR HORTON, Vancouver: WAR302674, held by NE 119th St Pud DR Horton
- 2010-12-01: SUMNER CORP PARK PH 1 & 2, Sumner: WAR302675, held by Sumner Corporate Park Cascad & Glacier Sites
- 2010-12-01: HUMMINGBIRD LANE V2, Battle Ground: WAR302676, held by Hummingbird Lane v2
- 2010-12-01: SUNLAND GRADING PROJECT, Anacortes: WAR302677, held by Sunland Grading Project
CSO PHASE 2/FRONT STREET STORMWATER among its neighbors
59 discharge permits are in the Ennis Creek-Frontal Port Angeles Harbor subwatershed (HUC 171100200405); WAR302671 is one. Its county: 108, 2 major; WAR302671 is minor permit.
Other permits in the Ennis Creek-Frontal Port Angeles Harbor subwatershed (HUC 171100200405)
- 10TH & M STREET PROPERTY, Port Angeles: WAR311815, minor, term to 2025-12-31
- AIRPORT ROAD LOGYARD, Port Angeles: WAR302477, minor, term to 2024-12-31
- ALPINE AUTO INC, Port Angeles: WAR003282, minor, term to 2024-12-31
- BLACK DIAMOND QUARRY, Port Angeles: WAG501513, minor, term to 2026-03-31
- BRIX MARINE, Port Angeles: WAR316046, minor, term to 2030-12-31
- CLALLAM COUNTY PW MORSE CREEK PIT, Port Angeles: WAG501282, minor, term to 2026-03-31
- CLALLAM TRANSIT SYSTEM ADM MTCE OP, Port Angeles: WAR001767, minor, term to 2024-12-31
- DELHUR INDUSTRIES ANGELES CONCRETE, Port Angeles: WAG501485, minor, term to 2026-03-31
- ECLIPSE LOG YARD EVERGREEN FIBRE IN, Port Angeles: WAR000861, minor, term to 2024-12-31
- EKLUND SUBDIVISION, Port Angeles: WAR009986, minor, term to 2025-12-31
What stands out
- Its term runs 5 years and 30 days, December 1, 2010 to December 31, 2015; the term ended 3,911 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as administratively continued.
- No dated event in the 365 days to September 15, 2026.
- It is one of 8,573 discharge permits on the register in Washington; 4,744 of them (55%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | CSO PHASE 2/FRONT STREET STORMWATER |
|---|---|
| Permittee | CSO Phase 2/Front Street Stormwater |
| NPDES ID | WAR302671 |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | December 1, 2010 |
| Expires | December 31, 2015 |
| Agency | State |
| Address | Port Angeles, WA 98362 |
| Subwatershed | Ennis Creek-Frontal Port Angeles Harbor (HUC 171100200405) |
NPDES WAR302671: effluent limits and exceedances
CSO PHASE 2/FRONT STREET STORMWATER (NPDES WAR302671): 3 pollutants on file, 3 limited; 3 with a violation of any kind, 0 with an exceedance.
| Pollutant | Limits | Violations | Exceedances | Latest | Largest, as filed |
|---|---|---|---|---|---|
| pH | 2 | 34 | 0 | ||
| Turbidity | 1 | 17 | 0 | ||
| Transparency | 1 | 17 | 0 |
NPDES WAR302671: inspections, violations and enforcement
NPDES WAR302671 (CSO PHASE 2/FRONT STREET STORMWATER): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES WAR302671
NPDES WAR302671: one email when its EPA record changes — $99/month.
Permits near NPDES WAR302671
NPDES WAR302671: 3 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.