Clean Water Act discharge permit · NPDES WAR303097
EAST LINK EXTENSION OLYMPIC PIPELINE RELOCATION, Bellevue, WA: NPDES WAR303097 discharge permit, effluent exceedances, inspections, penalties
- Administratively continuedPermit status
- MinorDischarger class
- 0Pollutants under a numeric limit
- 0Pollutants with an effluent exceedance
- 0Inspections on file
- 0Formal enforcement actions
EAST LINK EXTENSION OLYMPIC PIPELINE RELOCATION, held by East Link Extension Olympic Pipeline Relocation, holds NPDES permit WAR303097. EPA’s file records it issued December 1, 2010 and expiring December 31, 2015. The status and dates are as EPA’s permit file stood when Velarion loaded it (October 14, 2026); EPA’s free Detailed Facility Report on ECHO carries the permit’s current standing.
What the register holds for EAST LINK EXTENSION OLYMPIC PIPELINE RELOCATION: its NPDES ID, its permit type and status, its dates, its address in Bellevue, Washington. EPA’s effluent violation file and its single-event violation file hold no violation for NPDES WAR303097.
What stands out
- Its term runs 5 years and 30 days, December 1, 2010 to December 31, 2015; the term ended 3,940 days before EPA's file was loaded on October 14, 2026, and the file lists the permit as administratively continued.
- No dated event in the 365 days to October 14, 2026.
- It is one of 8,573 discharge permits on the register in Washington; 4,744 of them (55%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility as filed | EAST LINK EXTENSION OLYMPIC PIPELINE RELOCATION |
|---|---|
| Permittee as filed | East Link Extension Olympic Pipeline Relocation |
| NPDES ID | WAR303097 |
| Permit status | Administratively continued (past its expiration date and still in force until reissued) |
| Permit type | Coverage under a general permit |
| Discharger class | Minor discharger |
| Facility type | Not a publicly owned treatment works |
| Program | Construction stormwater |
| Issued | December 1, 2010 |
| Expiration date | December 31, 2015 |
| Issuing agency | State |
| Address | Bellevue, WA 98005 |
| Subwatershed | Lake Washington-Sammamish River (HUC 171100120400) |
| SIC | 1794 – Excavation Work |
Cited to the EPA ICIS-NPDES permit file (ECHO download) and EPA’s NAICS/SIC and component files, the same download.
Effluent limits and exceedances
- 0Pollutants on file
- 0Under a numeric limit
- 0With a violation of any kind
- 0With an effluent exceedance
EPA’s limits and effluent violation files hold no pollutant row for NPDES WAR303097.
Cited to the EPA ICIS-NPDES limits and effluent violations files (ECHO download); up to 60 rows shown, most exceedances first.
Inspections, violations and enforcement
- 0Single-event violations
EPA’s single-event violation file, as loaded, holds no violation for NPDES WAR303097.
Inspections
EPA’s inspection file holds no inspection for NPDES WAR303097.
Formal enforcement and penalties
0 formal actions, 0 of them with a penalty assessed. Federal and state penalties are separate figures from separate authorities and are shown as each was filed, never added together.
Informal enforcement
EPA’s informal enforcement file holds no action for NPDES WAR303097.
Cited to the EPA ICIS-NPDES violation, inspection and enforcement files (ECHO download); up to 50 rows of each shown, newest first.
Watch this permit
One permit holder, $99/month. Watch the register for one permit holder and the places and receiving waters tied to its permits. Choose “One permit holder” and enter this permit’s NPDES ID, WAR303097.
Start the watch
- One permit holder — $99/month
- One watershed — $2,990/year
- One state — $4,990/year
- The whole register — $18,000/year
How we handle your data → Privacy
EPA publishes a free Detailed Facility Report for every permit on ECHO: its compliance status quarter by quarter, its inspections, and its enforcement actions and penalties. EPA also sends free notices of new inspections and enforcement actions through ECHO Notify; enter NPDES ID WAR303097 there.
EAST LINK EXTENSION OLYMPIC PIPELINE RELOCATION, Bellevue, Washington: Coverage under a general permit WAR303097, held by East Link Extension Olympic Pipeline Relocation; Construction stormwater; Administratively continued (past its expiration date and still in force until reissued); issued December 1, 2010, term to December 31, 2015, by State.
Washington holds 4,744 Construction stormwater coverages of this permit type in EPA’s file; 112 were issued before WAR303097.
Coverages issued nearest WAR303097
- 2010-12-01: BP 9-1, Redmond Ridge: WAR303089
- 2010-12-01: SPURGEON SUBSTATION, Olympia: WAR303091, held by Spurgeon Substation
- 2010-12-01: GRANITE CREEK TRAILHEAD - A, North Bend: WAR303094, held by Granite Creek Trailhead - A
- 2010-12-01: ALDARRA CORPORATE PARK EAST, Kent: WAR303095, held by Aldarra Corporate Park East
- 2010-12-01: STAR RENTALS AT ALDARRA PARK, Kent: WAR303096, held by Star Rentals at Aldarra Park
- 2010-12-01: OAK HARBOR CLEAN WATER FACILITY, Oak Harbor: WAR303098, held by Oak Harbor Clean Water Facility
- 2010-12-01: RESERVOIR RIDGE, Tacoma: WAR303099
- 2010-12-01: BIG ROCK PARK, Sammamish: WAR303100, held by Big Rock Park
- 2010-12-01: WEEKENDER STORAGE, Woodland: WAR303101, held by Weekender Storage
- 2010-12-01: 1ST AVE S AT S 328TH STREET INTERSECTION, Federal Way: WAR303102, held by 1st Ave S at S 328th Street Intersection
EAST LINK EXTENSION OLYMPIC PIPELINE RELOCATION among its neighbors
475 discharge permits are in the Lake Washington-Sammamish River subwatershed (HUC 171100120400); WAR303097 is one. Its county: 1,319, 8 major; WAR303097 is minor permit.
Other permits in the Lake Washington-Sammamish River subwatershed (HUC 171100120400)
- 10400 NE 52ND STREET, Kirkland: WAR127048, minor, term to 2015-12-31
- 11040 MAIN STREET, Bellevue: WAR315164, minor, term to 2025-12-31
- 115 KV LINE SEATTLE, Seattle: WAR303474, minor, term to 2015-12-31
- 120TH AVE NE STAGE 2, Bellevue: WAR302269, minor, term to 2015-12-31
- 120TH AVE NE STAGE 2, Bellevue: WAR302988, minor, term to 2015-12-31
- 120TH AVE NE STAGE 2 - A, Bellevue: WAR302686, minor, term to 2015-12-31
- 124TH AVE NE PEDESTRIAN SAFETY IMPROVEMENTS, Kirkland: WAR313048, minor, term to 2025-12-31
- 145TH STREET AND I5 INTERCHANGE IMPROVEMENTS, Shoreline: WAR312278, minor, term to 2025-12-31
- 150TH AVENUE SE AT I90 ROADWAY PROJECT, Bellevue: WAR314605, minor, term to 2025-12-31
- 1740 NW MARKET ST, Seattle: WAR315491, minor, term to 2030-12-31
Nearby on the register
- Discharge permits in Bellevue
- Every permit record in Bellevue, A to Z
- Discharge permits in Washington
- Every permit record in Washington, A to Z
Figures from EPA’s ICIS-NPDES download, loaded October 14, 2026.
What this page shows
The East Link Extension Olympic Pipeline Relocation storm water construction permit, issued December 1, 2010 in Bellevue, King County, Washington, is one of 756 storm water construction permits on the EPA's NPDES register in King County, this one included. Only 0.5% of the 753 storm water construction permits in King County, this one included, carry an earlier issue date than this permit. The permit records no pollutants under a numeric limit and no pollutants with an effluent exceedance.