NPDES WAR305049 · Clean Water Act
MCS RENTON, Renton, WA: NPDES WAR305049 discharge permit, effluent exceedances, inspections, penalties
MCS RENTON, Renton, Washington: General permit coverage WAR305049, held by DTG Enterprises Inc.; Administratively continued; issued November 20, 2019, term to December 31, 2024, by State; Recyclable Material Merchant Wholesalers.
- Turbidity: 1 limit, 45 violations of any kind, 36 effluent exceedances, latest December 31, 2024.
- Zinc, total [as Zn]: 1 limit, 19 violations of any kind, 9 effluent exceedances, latest September 30, 2020, largest 74% over the limit.
- pH: 2 limits, 18 violations of any kind.
- Total Petroleum Hydrocarbons - Diesel: 1 limit, 11 violations of any kind.
- Copper, total [as Cu]: 1 limit, 10 violations of any kind.
- Lead, total [as Pb]: 1 limit, 10 violations of any kind.
- Oil and grease visual: 1 limit, 9 violations of any kind.
- Total Petroleum Hydrocarbons - Diesel and Waste Oil: 0 limits, 1 violation of any kind.
- January 27, 2026: CWA 309G2B AO For Class II Penalties (EPA), $154,250 federal penalty.
- August 22, 2025: Discharge from an industrial stormwater outfall to waters of the U.S. without NPDES permit coverage (ST6).
- August 22, 2025: Failure to properly install, initiate, or fully implement industrial stormwater controls (ST6).
- May 3, 2025: Discharge from an industrial stormwater outfall to waters of the U.S. without NPDES permit coverage (EP6).
- December 31, 2024: Failure to comply with monitoring requirements related to industrial stormwater [40 CFR 122.41(j)] (EP6).
- October 18, 2024: Failure to comply with recordkeeping requirements - industrial stormwater [40 CFR 122.41(j)] (EP6).
- September 30, 2024: Failure to comply with monitoring requirements related to industrial stormwater [40 CFR 122.41(j)] (EP6).
- September 30, 2024: Failure to develop, maintain, or get approval of an adequate SWPPP (industrial stormwater) (EP6).
- September 16, 2024: Failure to comply with recordkeeping requirements - industrial stormwater [40 CFR 122.41(j)] (EP6).
- August 14, 2024: Failure to develop, maintain, or get approval of an adequate SWPPP (industrial stormwater) (EP6).
- August 13, 2024: Discharge from an industrial stormwater outfall to waters of the U.S. without NPDES permit coverage (ST6).
- August 13, 2024: Failure to properly install, initiate, or fully implement industrial stormwater controls (ST6).
- August 9, 2024: Failure to comply with recordkeeping requirements - industrial stormwater [40 CFR 122.41(j)] (EP6).
- July 19, 2024: Failure to comply with recordkeeping requirements - industrial stormwater [40 CFR 122.41(j)] (EP6).
- June 30, 2024: Failure to comply with monitoring requirements related to industrial stormwater [40 CFR 122.41(j)] (EP6).
- June 6, 2024: Failure to comply with recordkeeping requirements - industrial stormwater [40 CFR 122.41(j)] (EP6).
- May 14, 2024: Failure to comply with recordkeeping requirements - industrial stormwater [40 CFR 122.41(j)] (EP6).
- April 29, 2024: Failure to comply with recordkeeping requirements - industrial stormwater [40 CFR 122.41(j)] (EP6).
- March 31, 2024: Failure to comply with monitoring requirements related to industrial stormwater [40 CFR 122.41(j)] (EP6).
- March 29, 2024: Failure to comply with recordkeeping requirements - industrial stormwater [40 CFR 122.41(j)] (EP6).
- February 15, 2024: Failure to comply with recordkeeping requirements - industrial stormwater [40 CFR 122.41(j)] (EP6).
- January 24, 2024: Failure to comply with recordkeeping requirements - industrial stormwater [40 CFR 122.41(j)] (EP6).
- December 18, 2023: Failure to comply with recordkeeping requirements - industrial stormwater [40 CFR 122.41(j)] (EP6).
- November 10, 2023: Failure to comply with recordkeeping requirements - industrial stormwater [40 CFR 122.41(j)] (EP6).
- October 30, 2023: Failure to comply with recordkeeping requirements - industrial stormwater [40 CFR 122.41(j)] (EP6).
- September 30, 2023: Failure to comply with monitoring requirements related to industrial stormwater [40 CFR 122.41(j)] (EP6).
- August 7, 2023: Failure to comply with recordkeeping requirements - industrial stormwater [40 CFR 122.41(j)] (EP6).
- July 27, 2023: Failure to comply with recordkeeping requirements - industrial stormwater [40 CFR 122.41(j)] (EP6).
- June 30, 2023: Failure to comply with monitoring requirements related to industrial stormwater [40 CFR 122.41(j)] (EP6).
- June 7, 2023: Failure to comply with recordkeeping requirements - industrial stormwater [40 CFR 122.41(j)] (EP6).
- April 27, 2023: Failure to comply with recordkeeping requirements - industrial stormwater [40 CFR 122.41(j)] (EP6).
- March 31, 2023: Failure to comply with monitoring requirements related to industrial stormwater [40 CFR 122.41(j)] (EP6).
- March 21, 2023: Failure to comply with recordkeeping requirements - industrial stormwater [40 CFR 122.41(j)] (EP6).
- February 21, 2023: Failure to comply with recordkeeping requirements - industrial stormwater [40 CFR 122.41(j)] (EP6).
- January 11, 2023: Failure to comply with recordkeeping requirements - industrial stormwater [40 CFR 122.41(j)] (EP6).
- December 31, 2022: Failure to comply with monitoring requirements related to industrial stormwater [40 CFR 122.41(j)] (EP6).
- June 30, 2022: Failure to comply with monitoring requirements related to industrial stormwater [40 CFR 122.41(j)] (EP6).
- April 27, 2022: Failure to comply with recordkeeping requirements - industrial stormwater [40 CFR 122.41(j)] (EP6).
- March 31, 2022: Failure to comply with monitoring requirements related to industrial stormwater [40 CFR 122.41(j)] (EP6).
- March 28, 2022: Failure to comply with recordkeeping requirements - industrial stormwater [40 CFR 122.41(j)] (EP6).
- January 19, 2022: Failure to develop, maintain, or get approval of an adequate SWPPP (industrial stormwater) (EP6).
- January 19, 2022: Failure to properly install, initiate, or fully implement industrial stormwater controls (EP6).
- January 19, 2022: Failure to properly operate or maintain industrial stormwater controls (EP6).
- December 31, 2021: Failure to comply with monitoring requirements related to industrial stormwater [40 CFR 122.41(j)] (EP6).
- December 31, 2021: Failure to comply with recordkeeping requirements - industrial stormwater [40 CFR 122.41(j)] (EP6).
- November 30, 2021: Failure to comply with recordkeeping requirements - industrial stormwater [40 CFR 122.41(j)] (EP6).
- September 30, 2021: Failure to comply with monitoring requirements related to industrial stormwater [40 CFR 122.41(j)] (EP6).
- September 30, 2021: Failure to develop, maintain, or get approval of an adequate SWPPP (industrial stormwater) (EP6).
- March 31, 2021: Failure to comply with monitoring requirements related to industrial stormwater [40 CFR 122.41(j)] (EP6).
- December 13, 2020: Failure to comply with monitoring requirements related to industrial stormwater [40 CFR 122.41(j)] (EP6).
Other permits held by DTG Enterprises Inc.
- DTG SNOHOMISH, Snohomish: WAR003265, issued 2019-11-20
- MCS REDMOND, Redmond: WAR305821, issued 2019-11-20
- RECOVERY 1 TACOMA YARD, Tacoma: WAR307170, issued 2019-11-20
- MCS MALTBY, Woodinville: WAR311608, issued 2019-11-20
MCS RENTON among its neighbors
362 discharge permits are in the Green River subwatershed (HUC 171100130305); WAR305049 is one.
Other permits in the Green River subwatershed (HUC 171100130305)
- 116TH AVENUE SE AND SE 248TH STREET ROUNDABOUT, Kent: WAR316076, minor, term to 2030-12-31
- 37TH & 40TH AVE SIDEWALK PROJECT, Seatac: WAR303423, minor, term to 2015-12-31
- 5TH AVENUE TOWNHOMES, Kent: WAR303021, minor, term to 2015-12-31
- 7 ELEVEN WEST VALLEY HWY, Tukwila: WAR313558, minor, term to 2025-12-31
- 76TH AVE S ROAD RAISING, Kent: WAR309038, minor, term to 2025-12-31
- 8801 E MARGINAL WAY S, Tukwila: WAR008681, minor, term to 2014-12-31
- ABF FREIGHT SYSTEMS KENT, Kent: WAR313014, minor, term to 2024-12-31
- ABX AIR INC SEATTLE, Seattle: WAR004602, minor, term to 2014-12-31
- ACE GALVANIZING INC 96TH, Seattle: WAR000154, minor, term to 2024-12-31
- AIRGAS KENT, Kent: WAR312174, minor, term to 2025-12-31
What stands out
- Its term runs 5 years and 41 days, November 20, 2019 to December 31, 2024; the term ended 652 days before EPA's file was loaded on October 14, 2026, and the file lists the permit as administratively continued.
- Its newest dated event on file is a formal enforcement action on January 27, 2026, 260 days before EPA's file was loaded.
- In the 365 days to October 14, 2026, it was dated 1 formal enforcement action.
- EPA's file dates 50 events for it, from 2020 to 2026; the busiest year is 2024 with 18.
- 2 of its 8 pollutants on file have an effluent exceedance (25%); 7 are under a numeric limit; the largest exceedance is Zinc, total [as Zn] at 74% over its limit.
- It is one of 8,573 discharge permits on the register in Washington; the file names no program for it, and it is a minor discharger.
Identity
| Facility | MCS RENTON |
|---|---|
| Permittee | DTG Enterprises Inc. |
| NPDES ID | WAR305049 |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Issued | November 20, 2019 |
| Expires | December 31, 2024 |
| Agency | State |
| Address | Renton, WA 98055 |
| Subwatershed | Green River (HUC 171100130305) |
| NAICS | 423930 – Recyclable Material Merchant Wholesalers |
| SIC | 5093 – Scrap And Waste Materials |
NPDES WAR305049: effluent limits and exceedances
MCS RENTON (NPDES WAR305049): 8 pollutants on file, 7 limited; 8 with a violation of any kind, 2 with an exceedance.
| Pollutant | Limits | Violations | Exceedances | Latest | Largest, as filed |
|---|---|---|---|---|---|
| Turbidity | 1 | 45 | 36 | December 31, 2024 | |
| Zinc, total [as Zn] | 1 | 19 | 9 | September 30, 2020 | 74% over the limit |
| pH | 2 | 18 | 0 | ||
| Total Petroleum Hydrocarbons - Diesel | 1 | 11 | 0 | ||
| Copper, total [as Cu] | 1 | 10 | 0 | ||
| Lead, total [as Pb] | 1 | 10 | 0 | ||
| Oil and grease visual | 1 | 9 | 0 | ||
| Total Petroleum Hydrocarbons - Diesel and Waste Oil | 0 | 1 | 0 |
NPDES WAR305049: inspections, violations and enforcement
NPDES WAR305049: 49 single-event violations
| Date | What EPA recorded | Agency |
|---|---|---|
| August 22, 2025 | Discharge from an industrial stormwater outfall to waters of the U.S. without NPDES permit coverage | ST6 |
| August 22, 2025 | Failure to properly install, initiate, or fully implement industrial stormwater controls | ST6 |
| May 3, 2025 | Discharge from an industrial stormwater outfall to waters of the U.S. without NPDES permit coverage | EP6 |
| December 31, 2024 | Failure to comply with monitoring requirements related to industrial stormwater [40 CFR 122.41(j)] | EP6 |
| October 18, 2024 | Failure to comply with recordkeeping requirements - industrial stormwater [40 CFR 122.41(j)] | EP6 |
| September 30, 2024 | Failure to comply with monitoring requirements related to industrial stormwater [40 CFR 122.41(j)] | EP6 |
| September 30, 2024 | Failure to develop, maintain, or get approval of an adequate SWPPP (industrial stormwater) | EP6 |
| September 16, 2024 | Failure to comply with recordkeeping requirements - industrial stormwater [40 CFR 122.41(j)] | EP6 |
| August 14, 2024 | Failure to develop, maintain, or get approval of an adequate SWPPP (industrial stormwater) | EP6 |
| August 13, 2024 | Discharge from an industrial stormwater outfall to waters of the U.S. without NPDES permit coverage | ST6 |
| August 13, 2024 | Failure to properly install, initiate, or fully implement industrial stormwater controls | ST6 |
| August 9, 2024 | Failure to comply with recordkeeping requirements - industrial stormwater [40 CFR 122.41(j)] | EP6 |
| July 19, 2024 | Failure to comply with recordkeeping requirements - industrial stormwater [40 CFR 122.41(j)] | EP6 |
| June 30, 2024 | Failure to comply with monitoring requirements related to industrial stormwater [40 CFR 122.41(j)] | EP6 |
| June 6, 2024 | Failure to comply with recordkeeping requirements - industrial stormwater [40 CFR 122.41(j)] | EP6 |
| May 14, 2024 | Failure to comply with recordkeeping requirements - industrial stormwater [40 CFR 122.41(j)] | EP6 |
| April 29, 2024 | Failure to comply with recordkeeping requirements - industrial stormwater [40 CFR 122.41(j)] | EP6 |
| March 31, 2024 | Failure to comply with monitoring requirements related to industrial stormwater [40 CFR 122.41(j)] | EP6 |
| March 29, 2024 | Failure to comply with recordkeeping requirements - industrial stormwater [40 CFR 122.41(j)] | EP6 |
| February 15, 2024 | Failure to comply with recordkeeping requirements - industrial stormwater [40 CFR 122.41(j)] | EP6 |
| January 24, 2024 | Failure to comply with recordkeeping requirements - industrial stormwater [40 CFR 122.41(j)] | EP6 |
| December 18, 2023 | Failure to comply with recordkeeping requirements - industrial stormwater [40 CFR 122.41(j)] | EP6 |
| November 10, 2023 | Failure to comply with recordkeeping requirements - industrial stormwater [40 CFR 122.41(j)] | EP6 |
| October 30, 2023 | Failure to comply with recordkeeping requirements - industrial stormwater [40 CFR 122.41(j)] | EP6 |
| September 30, 2023 | Failure to comply with monitoring requirements related to industrial stormwater [40 CFR 122.41(j)] | EP6 |
| August 7, 2023 | Failure to comply with recordkeeping requirements - industrial stormwater [40 CFR 122.41(j)] | EP6 |
| July 27, 2023 | Failure to comply with recordkeeping requirements - industrial stormwater [40 CFR 122.41(j)] | EP6 |
| June 30, 2023 | Failure to comply with monitoring requirements related to industrial stormwater [40 CFR 122.41(j)] | EP6 |
| June 7, 2023 | Failure to comply with recordkeeping requirements - industrial stormwater [40 CFR 122.41(j)] | EP6 |
| April 27, 2023 | Failure to comply with recordkeeping requirements - industrial stormwater [40 CFR 122.41(j)] | EP6 |
| March 31, 2023 | Failure to comply with monitoring requirements related to industrial stormwater [40 CFR 122.41(j)] | EP6 |
| March 21, 2023 | Failure to comply with recordkeeping requirements - industrial stormwater [40 CFR 122.41(j)] | EP6 |
| February 21, 2023 | Failure to comply with recordkeeping requirements - industrial stormwater [40 CFR 122.41(j)] | EP6 |
| January 11, 2023 | Failure to comply with recordkeeping requirements - industrial stormwater [40 CFR 122.41(j)] | EP6 |
| December 31, 2022 | Failure to comply with monitoring requirements related to industrial stormwater [40 CFR 122.41(j)] | EP6 |
| June 30, 2022 | Failure to comply with monitoring requirements related to industrial stormwater [40 CFR 122.41(j)] | EP6 |
| April 27, 2022 | Failure to comply with recordkeeping requirements - industrial stormwater [40 CFR 122.41(j)] | EP6 |
| March 31, 2022 | Failure to comply with monitoring requirements related to industrial stormwater [40 CFR 122.41(j)] | EP6 |
| March 28, 2022 | Failure to comply with recordkeeping requirements - industrial stormwater [40 CFR 122.41(j)] | EP6 |
| January 19, 2022 | Failure to develop, maintain, or get approval of an adequate SWPPP (industrial stormwater) | EP6 |
| January 19, 2022 | Failure to properly install, initiate, or fully implement industrial stormwater controls | EP6 |
| January 19, 2022 | Failure to properly operate or maintain industrial stormwater controls | EP6 |
| December 31, 2021 | Failure to comply with monitoring requirements related to industrial stormwater [40 CFR 122.41(j)] | EP6 |
| December 31, 2021 | Failure to comply with recordkeeping requirements - industrial stormwater [40 CFR 122.41(j)] | EP6 |
| November 30, 2021 | Failure to comply with recordkeeping requirements - industrial stormwater [40 CFR 122.41(j)] | EP6 |
| September 30, 2021 | Failure to comply with monitoring requirements related to industrial stormwater [40 CFR 122.41(j)] | EP6 |
| September 30, 2021 | Failure to develop, maintain, or get approval of an adequate SWPPP (industrial stormwater) | EP6 |
| March 31, 2021 | Failure to comply with monitoring requirements related to industrial stormwater [40 CFR 122.41(j)] | EP6 |
| December 13, 2020 | Failure to comply with monitoring requirements related to industrial stormwater [40 CFR 122.41(j)] | EP6 |
NPDES WAR305049: 1 formal enforcement action
1 of them with a penalty assessed. How penalties are shown.
| Date | What EPA recorded | Agency | Federal penalty | State or local penalty |
|---|---|---|---|---|
| January 27, 2026 | CWA 309G2B AO For Class II Penalties | EPA | $154,250 |
NPDES WAR305049 (MCS RENTON): no inspection and informal enforcement action on file.
Watch NPDES WAR305049
NPDES WAR305049: one email when its EPA record changes — $99/month.
Permits near NPDES WAR305049
NPDES WAR305049: 8 pollutant rows, 50 dated events; ICIS-NPDES download, loaded October 14, 2026.