NPDES WAR306509 · Clean Water Act

SUMNER SOUNDER STATION, Sumner, WA: NPDES WAR306509 discharge permit, effluent exceedances, inspections, penalties

SUMNER SOUNDER STATION, Sumner, Washington: General permit coverage WAR306509, held by Harbor Pacific Contractors, Inc.; Construction stormwater; Administratively continued; issued November 18, 2020, term to December 31, 2025, by State.

  • pH: 2 limits, 6 violations of any kind.
  • Turbidity: 1 limit, 3 violations of any kind.
  • 4-Isopropyltoluene: 1 limit, 3 violations of any kind.
  • Benzene: 1 limit, 3 violations of any kind.
  • Ethylbenzene: 1 limit, 3 violations of any kind.
  • Naphthalene: 1 limit, 3 violations of any kind.
  • p-Xylene: 1 limit, 3 violations of any kind.
  • Transparency: 1 limit, 3 violations of any kind.
  • Total Petroleum Hydrocarbons - Diesel: 1 limit, 3 violations of any kind.
  • Total Petroleum Hydrocarbons - Gasoline: 1 limit, 3 violations of any kind.
  • 1,2,4-Trimethylbenzene: 1 limit, 3 violations of any kind.
  • Isopropylbenzene: 1 limit, 3 violations of any kind.
  • n-Propylbenzene: 1 limit, 3 violations of any kind.
  • 1,3,5-Trimethylbenzene: 1 limit, 3 violations of any kind.
  • n-Butylbenzene: 1 limit, 3 violations of any kind.
  • .meta.-Xylene: 1 limit, 3 violations of any kind.

Washington holds 4,744 Construction stormwater coverages of this permit type in EPA’s file; 1,658 were issued before WAR306509. Harbor Pacific Contractors, Inc. holds 2 permits in Washington.

Other permits held by Harbor Pacific Contractors, Inc.

Coverages issued nearest WAR306509

SUMNER SOUNDER STATION among its neighbors

27 discharge permits are in the Fennel Creek-Puyallup River subwatershed (HUC 171100140501); WAR306509 is one.

Other permits in the Fennel Creek-Puyallup River subwatershed (HUC 171100140501)

What stands out

  • Its term runs 5 years and 43 days, November 18, 2020 to December 31, 2025; the term ended 258 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as administratively continued.
  • No dated event in the 365 days to September 15, 2026.
  • It is one of 8,573 discharge permits on the register in Washington; 4,744 of them (55%) are in its program, Construction stormwater, and it is a minor discharger.

Identity

FacilitySUMNER SOUNDER STATION
PermitteeHarbor Pacific Contractors, Inc.
NPDES IDWAR306509
StatusAdministratively continued
TypeGeneral permit coverage
ClassMinor
Facility typeNon-POTW
ProgramConstruction stormwater
IssuedNovember 18, 2020
ExpiresDecember 31, 2025
AgencyState
AddressSumner, WA 98390
Receiving water impaired303(D) Listed
SubwatershedFennel Creek-Puyallup River (HUC 171100140501)

NPDES WAR306509: effluent limits and exceedances

SUMNER SOUNDER STATION (NPDES WAR306509): 16 pollutants on file, 16 limited; 16 with a violation of any kind, 0 with an exceedance.

How exceedances are counted.

PollutantLimitsViolationsExceedancesLatestLargest, as filed
pH260
Turbidity130
4-Isopropyltoluene130
Benzene130
Ethylbenzene130
Naphthalene130
p-Xylene130
Transparency130
Total Petroleum Hydrocarbons - Diesel130
Total Petroleum Hydrocarbons - Gasoline130
1,2,4-Trimethylbenzene130
Isopropylbenzene130
n-Propylbenzene130
1,3,5-Trimethylbenzene130
n-Butylbenzene130
.meta.-Xylene130

NPDES WAR306509: inspections, violations and enforcement

NPDES WAR306509 (SUMNER SOUNDER STATION): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.

Watch NPDES WAR306509

NPDES WAR306509: one email when its EPA record changes — $99/month.