NPDES WAR308422 · Clean Water Act
FUTURE TOTEM LAKE CONNECTOR BRIDGE, Kirkland, WA: NPDES WAR308422 discharge permit, effluent exceedances, inspections, penalties
FUTURE TOTEM LAKE CONNECTOR BRIDGE, Kirkland, Washington: General permit coverage WAR308422, held by City of Kirkland; Construction stormwater; Administratively continued; issued November 18, 2015, term to December 31, 2020, by State.
- Turbidity: 0 limits, 3 violations of any kind, 1 effluent exceedance, latest January 31, 2023.
- Transparency: 0 limits, 3 violations of any kind, 1 effluent exceedance, latest January 31, 2023, largest 96% over the limit.
- pH: 0 limits, 4 violations of any kind.
Washington holds 4,744 Construction stormwater coverages of this permit type in EPA’s file; 1,530 were issued before WAR308422. City of Kirkland holds 2 permits in Washington.
Other permits held by City of Kirkland
- KIRKLAND CITY, Kirkland: WAR045521, issued 2019-07-01
Coverages issued nearest WAR308422
- 2015-11-18: SAPPHIRE ON TALBOT, Renton: WAR308357
- 2015-11-18: STATE AVENUE CORRIDOR WIDENING PROJECT, Marysville: WAR308365, held by City of Marysville
- 2015-11-18: UNIVERSITY VILLAGE, Pullman: WAR308383, held by CP Sagamore University Crossing Investors, LLC
- 2015-11-18: ALUMNI POINTE AT UNIVERSITY CROSSING, Pullman: WAR308384, held by CP Sagamore University Crossings Investors, LLC
- 2015-11-18: ALDRICH ROAD, Bellingham: WAR308420, held by Jones Engineers, Inc. PS
- 2017-03-22: LATITUDE MEDICAL OFFICE BUILDING, Puyallup: WAR305582, held by Latitude Development, LLC
- 2017-12-28: BPA RAVER SUBSTATION EXPANSION, Ravensdale: WAR10F01V, held by Bonneville Power Administration
- 2018-07-30: COVE STORE, Bellingham: WAR10I00Y, held by Lummi Commercial Company
- 2018-09-05: US 101 / HARLOW CREEK - REMOVE FISH BARRIER, Queets: WAR10I011, held by Washington State Dept. of Transportation
- 2018-11-13: UPPER HOH RIVER ROAD PHASE II, Forks: WAR10F035, held by FHWA - Western Federal Lands Highway Division
FUTURE TOTEM LAKE CONNECTOR BRIDGE among its neighbors
475 discharge permits are in the Lake Washington-Sammamish River subwatershed (HUC 171100120400); WAR308422 is one.
Other permits in the Lake Washington-Sammamish River subwatershed (HUC 171100120400)
- 10400 NE 52ND STREET, Kirkland: WAR127048, minor, term to 2015-12-31
- 11040 MAIN STREET, Bellevue: WAR315164, minor, term to 2025-12-31
- 115 KV LINE SEATTLE, Seattle: WAR303474, minor, term to 2015-12-31
- 120TH AVE NE STAGE 2, Bellevue: WAR302269, minor, term to 2015-12-31
- 120TH AVE NE STAGE 2, Bellevue: WAR302988, minor, term to 2015-12-31
- 120TH AVE NE STAGE 2 - A, Bellevue: WAR302686, minor, term to 2015-12-31
- 124TH AVE NE PEDESTRIAN SAFETY IMPROVEMENTS, Kirkland: WAR313048, minor, term to 2025-12-31
- 145TH STREET AND I5 INTERCHANGE IMPROVEMENTS, Shoreline: WAR312278, minor, term to 2025-12-31
- 150TH AVENUE SE AT I90 ROADWAY PROJECT, Bellevue: WAR314605, minor, term to 2025-12-31
- 1740 NW MARKET ST, Seattle: WAR315491, minor, term to 2030-12-31
What stands out
- Its term runs 5 years and 43 days, November 18, 2015 to December 31, 2020; the term ended 2,084 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as administratively continued.
- No dated event in the 365 days to September 15, 2026.
- 2 of its 3 pollutants on file have an effluent exceedance (67%); 0 are under a numeric limit; the largest exceedance is Transparency at 96% over its limit.
- It is one of 8,573 discharge permits on the register in Washington; 4,744 of them (55%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | FUTURE TOTEM LAKE CONNECTOR BRIDGE |
|---|---|
| Permittee | City of Kirkland |
| NPDES ID | WAR308422 |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | November 18, 2015 |
| Expires | December 31, 2020 |
| Agency | State |
| Address | Kirkland, WA 98034 |
| Subwatershed | Lake Washington-Sammamish River (HUC 171100120400) |
NPDES WAR308422: effluent limits and exceedances
FUTURE TOTEM LAKE CONNECTOR BRIDGE (NPDES WAR308422): 3 pollutants on file, 0 limited; 3 with a violation of any kind, 2 with an exceedance.
| Pollutant | Limits | Violations | Exceedances | Latest | Largest, as filed |
|---|---|---|---|---|---|
| Turbidity | 0 | 3 | 1 | January 31, 2023 | |
| Transparency | 0 | 3 | 1 | January 31, 2023 | 96% over the limit |
| pH | 0 | 4 | 0 |
NPDES WAR308422: inspections, violations and enforcement
NPDES WAR308422 (FUTURE TOTEM LAKE CONNECTOR BRIDGE): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES WAR308422
NPDES WAR308422: one email when its EPA record changes — $99/month.
Permits near NPDES WAR308422
NPDES WAR308422: 3 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.