GENERAL CONSTRUCTION COMPANY SEATTLE, Seattle, WA: NPDES WAR309232 discharge permit, effluent exceedances, inspections, penalties
GENERAL CONSTRUCTION COMPANY SEATTLE, Seattle, Washington: General permit coverage WAR309232, held by General Construction Company; Administratively continued; issued November 20, 2019, term to December 31, 2024, by State.
- Copper, total [as Cu]: 2 limits, 24 violations of any kind, 14 effluent exceedances, latest December 31, 2024, largest 1,257% over the limit.
- Turbidity: 2 limits, 22 violations of any kind, 12 effluent exceedances, latest December 31, 2024.
- Zinc, total [as Zn]: 2 limits, 20 violations of any kind, 10 effluent exceedances, latest December 31, 2024, largest 1,148% over the limit.
- Solids, total suspended: 4 limits, 21 violations of any kind, 9 effluent exceedances, latest December 31, 2024, largest 4,633% over the limit.
- pH: 4 limits, 20 violations of any kind.
- Oil and grease visual: 2 limits, 10 violations of any kind.
- Total Petroleum Hydrocarbons - Diesel: 0 limits, 4 violations of any kind.
GENERAL CONSTRUCTION COMPANY SEATTLE among its neighbors
107 discharge permits are in the Miller Creek-Frontal East Passage subwatershed (HUC 171100190204); WAR309232 is one. Its county: 1,319, 8 major; WAR309232 is minor permit.
Other permits in the Miller Creek-Frontal East Passage subwatershed (HUC 171100190204)
- 45TH AVE SW CULVERT REPLACEMENT, Seattle: WAR315511, minor, term to 2030-12-31
- AIRPORT STATION AREA PEDESTRIAN IMPROVEMENT PROJECT, Seatac: WAR315472, minor, term to 2030-12-31
- AMAZON.COM SERVICES LLC BFI8, Seatac: WAR309403, minor, term to 2024-12-31
- ARROW LAKE - LAKE TREATMENT, Unspecified: WAG994391, minor, term to 2026-03-21
- BARNES CREEK TRAIL, Des Moines: WAR315080, minor, term to 2025-12-31
- BOEING SPARES DISTRIBUTION CENTER, Seatac: WAR000225, minor, term to 2024-12-31
- BRACE POINT RECONDUCTOR 2021, Seattle: WAR310800, minor, term to 2025-12-31
- BURIEN CITY, Burien: WAR045509, minor, term to 2024-07-31
- BURIEN MERRILL GARDENS, Burien: WAR302237, minor, term to 2015-12-31
- BURIEN METRO LANDING, Burien: WAR314903, minor, term to 2025-12-31
What stands out
- Its term runs 5 years and 41 days, November 20, 2019 to December 31, 2024; the term ended 623 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as administratively continued.
- No dated event in the 365 days to September 15, 2026.
- 4 of its 7 pollutants on file have an effluent exceedance (57%); 6 are under a numeric limit; the largest exceedance is Solids, total suspended at 4,633% over its limit.
- It is one of 8,573 discharge permits on the register in Washington; the file names no program for it, and it is a minor discharger.
Identity
| Facility | GENERAL CONSTRUCTION COMPANY SEATTLE |
|---|---|
| Permittee | General Construction Company |
| NPDES ID | WAR309232 |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Issued | November 20, 2019 |
| Expires | December 31, 2024 |
| Agency | State |
| Address | Seattle, WA 98106 |
| Receiving water impaired | 303(D) Listed |
| Subwatershed | Miller Creek-Frontal East Passage (HUC 171100190204) |
| Other EPA IDs (FRS) | RCRA handler WAD982658445 |
NPDES WAR309232: effluent limits and exceedances
GENERAL CONSTRUCTION COMPANY SEATTLE (NPDES WAR309232): 7 pollutants on file, 6 limited; 7 with a violation of any kind, 4 with an exceedance.
| Pollutant | Limits | Violations | Exceedances | Latest | Largest, as filed |
|---|---|---|---|---|---|
| Copper, total [as Cu] | 2 | 24 | 14 | December 31, 2024 | 1,257% over the limit |
| Turbidity | 2 | 22 | 12 | December 31, 2024 | |
| Zinc, total [as Zn] | 2 | 20 | 10 | December 31, 2024 | 1,148% over the limit |
| Solids, total suspended | 4 | 21 | 9 | December 31, 2024 | 4,633% over the limit |
| pH | 4 | 20 | 0 | ||
| Oil and grease visual | 2 | 10 | 0 | ||
| Total Petroleum Hydrocarbons - Diesel | 0 | 4 | 0 |
NPDES WAR309232: inspections, violations and enforcement
NPDES WAR309232 (GENERAL CONSTRUCTION COMPANY SEATTLE): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES WAR309232
NPDES WAR309232: one email when its EPA record changes — $99/month.
Permits near NPDES WAR309232
NPDES WAR309232: 7 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.