Velarion Records
Free: one email when NPDES WAR309441 changes. Unsubscribe any time.

NPDES WAR309441 · Clean Water Act

EAST MAPLE RIDGE, Blaine, WA: NPDES WAR309441 discharge permit, effluent exceedances, inspections, penalties

EAST MAPLE RIDGE, Blaine, Washington: General permit coverage WAR309441, held by JIJ Corporation; Construction stormwater; Administratively continued; issued November 18, 2020, term to December 31, 2025, by State.

  • Turbidity: 3 limits, 18 violations of any kind, 16 effluent exceedances, latest April 30, 2025.
  • pH: 6 limits, 4 violations of any kind.
  • July 30, 2026: Evaluation (S).
  • July 30, 2026: Evaluation (S).
  • July 30, 2026: Evaluation (S).
  • July 30, 2026: Evaluation (S).
  • July 30, 2026: Evaluation (S).

Washington holds 4,744 Construction stormwater coverages of this permit type in EPA’s file; 1,658 were issued before WAR309441.

Coverages issued nearest WAR309441

EAST MAPLE RIDGE among its neighbors

23 discharge permits are in the Dakota Creek-Frontal Drayton Harbor subwatershed (HUC 171100020202); WAR309441 is one.

Other permits in the Dakota Creek-Frontal Drayton Harbor subwatershed (HUC 171100020202)

What stands out

  • Its term runs 5 years and 43 days, November 18, 2020 to December 31, 2025; the term ended 287 days before EPA's file was loaded on October 14, 2026, and the file lists the permit as administratively continued.
  • Its newest dated event on file is an inspection on July 30, 2026, 76 days before EPA's file was loaded.
  • In the 365 days to October 14, 2026, it was dated 5 inspections.
  • EPA's file dates 5 events for it, all in 2026.
  • 1 of its 2 pollutants on file has an effluent exceedance (50%); 2 are under a numeric limit.
  • It is one of 8,573 discharge permits on the register in Washington; 4,744 of them (55%) are in its program, Construction stormwater, and it is a minor discharger.

Identity

FacilityEAST MAPLE RIDGE
PermitteeJIJ Corporation
NPDES IDWAR309441
StatusAdministratively continued
TypeGeneral permit coverage
ClassMinor
Facility typeNon-POTW
ProgramConstruction stormwater
IssuedNovember 18, 2020
ExpiresDecember 31, 2025
AgencyState
AddressBlaine, WA 98230
SubwatershedDakota Creek-Frontal Drayton Harbor (HUC 171100020202)
SIC1794 – Excavation Work

NPDES WAR309441: effluent limits and exceedances

EAST MAPLE RIDGE (NPDES WAR309441): 2 pollutants on file, 2 limited; 2 with a violation of any kind, 1 with an exceedance.

How exceedances are counted.

PollutantLimitsViolationsExceedancesLatestLargest, as filed
Turbidity31816April 30, 2025
pH640

NPDES WAR309441: inspections, violations and enforcement

NPDES WAR309441: 5 inspections

DateWhat EPA recordedAgency
July 30, 2026EvaluationS
July 30, 2026EvaluationS
July 30, 2026EvaluationS
July 30, 2026EvaluationS
July 30, 2026EvaluationS

NPDES WAR309441 (EAST MAPLE RIDGE): no single-event violation, formal enforcement action and informal enforcement action on file.

Watch NPDES WAR309441

NPDES WAR309441: one email when its EPA record changes — $99/month.

Billing

Privacy

Permits near NPDES WAR309441

NPDES WAR309441: 2 pollutant rows, 5 dated events; ICIS-NPDES download, loaded October 14, 2026.