NPDES WAR313983 · Clean Water Act
OLYMPIC DISCOVERY TRAIL ANDERSON LAKE CONNECTION, Port Townsend, WA: NPDES WAR313983 discharge permit, effluent exceedances, inspections, penalties
OLYMPIC DISCOVERY TRAIL ANDERSON LAKE CONNECTION, Port Townsend, Washington: General permit coverage WAR313983, held by Seton Construction Inc; Construction stormwater; Administratively continued; issued November 18, 2020, term to December 31, 2025, by State.
- pH: 2 limits, 16 violations of any kind.
- Turbidity: 1 limit, 8 violations of any kind.
Washington holds 4,744 Construction stormwater coverages of this permit type in EPA’s file; 1,658 were issued before WAR313983.
Coverages issued nearest WAR313983
- 2020-11-18: PEPIN CREEK / PINE ST BRIDGE, Lynden: WAR313971, held by Dekoster Excavating, Inc.
- 2020-11-18: STORYBROOK PARK PHASE 1, Bellingham: WAR313972, held by Premium Services Inc
- 2020-11-18: WASHINGTON STATE VETERANS CEMETERY, Medical Lake: WAR313974, held by Wesslen Construction and Development Inc
- 2020-11-18: THRIVE INTERNATIONAL APARTMENTS, Spokane: WAR313976, held by Walker Construction Inc
- 2020-11-18: VELKOMMEN MOBILE HOME PARK, Tumwater: WAR313980, held by Iversen and Sons
- 2020-11-18: CITY OF LACEY LIFT STATION NO. 3, Lacey: WAR313986, held by Prospect Construction
- 2020-11-18: BOBLETT STREET, Blaine: WAR313992, held by City of Blaine, Public Works Department
- 2020-11-18: BUS BASE NORTH, Bothell: WAR313995, held by PCL Construction Services, Inc
- 2020-11-18: MARCH POINT (WHITMARSH) LANDFILL, Anacortes: WAR313996, held by Skagit County Public Works
- 2020-11-18: SHERWOOD FOREST LLC, Arlington: WAR313997, held by Cornerstone Homes NW LLC
OLYMPIC DISCOVERY TRAIL ANDERSON LAKE CONNECTION among its neighbors
4 discharge permits are in the Beckett Point-Frontal Discovery Bay subwatershed (HUC 171100200102); WAR313983 is one.
Other permits in the Beckett Point-Frontal Discovery Bay subwatershed (HUC 171100200102)
- LAKESIDE INDUSTRIES CAPE GEORGE PIT, Port Townsend: WAG501382, minor, term to 2026-03-31
- RESERVE AT DISCOVERY BAY, Port Townsend: WAR008814, minor, term to 2015-12-31
- WATER TREATMENT FACILITY AND RESERVOIR, Port Townsend: WAR303240, minor, term to 2015-12-31
What stands out
- Its term runs 5 years and 43 days, November 18, 2020 to December 31, 2025; the term ended 258 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as administratively continued.
- No dated event in the 365 days to September 15, 2026.
- It is one of 8,573 discharge permits on the register in Washington; 4,744 of them (55%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | OLYMPIC DISCOVERY TRAIL ANDERSON LAKE CONNECTION |
|---|---|
| Permittee | Seton Construction Inc |
| NPDES ID | WAR313983 |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | November 18, 2020 |
| Expires | December 31, 2025 |
| Agency | State |
| Address | Port Townsend, WA 98368 |
| Subwatershed | Beckett Point-Frontal Discovery Bay (HUC 171100200102) |
NPDES WAR313983: effluent limits and exceedances
OLYMPIC DISCOVERY TRAIL ANDERSON LAKE CONNECTION (NPDES WAR313983): 2 pollutants on file, 2 limited; 2 with a violation of any kind, 0 with an exceedance.
| Pollutant | Limits | Violations | Exceedances | Latest | Largest, as filed |
|---|---|---|---|---|---|
| pH | 2 | 16 | 0 | ||
| Turbidity | 1 | 8 | 0 |
NPDES WAR313983: inspections, violations and enforcement
NPDES WAR313983 (OLYMPIC DISCOVERY TRAIL ANDERSON LAKE CONNECTION): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES WAR313983
NPDES WAR313983: one email when its EPA record changes — $99/month.
Permits near NPDES WAR313983
NPDES WAR313983: 2 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.