NPDES WAR314048 · Clean Water Act
JAMES STREET AND BAKERVIEW ROAD INTERSECTION RECONSTRUCTION, Bellingham, WA: NPDES WAR314048 discharge permit, effluent exceedances, inspections, penalties
JAMES STREET AND BAKERVIEW ROAD INTERSECTION RECONSTRUCTION, Bellingham, Washington: General permit coverage WAR314048, held by Faber Construction Corporation; Construction stormwater; Administratively continued; issued November 18, 2020, term to December 31, 2025, by State.
- pH: 2 limits, 2 violations of any kind.
- Turbidity: 1 limit, 1 violation of any kind.
- Transparency: 1 limit, 1 violation of any kind.
Washington holds 4,744 Construction stormwater coverages of this permit type in EPA’s file; 1,658 were issued before WAR314048. Faber Construction Corporation holds 7 permits in Washington.
Other permits held by Faber Construction Corporation
- GOOSEBERRY POINT WASTEWATER TREATMENT PLANT IMPROVEMENTS, Bellingham: WAR10I02B, issued 2022-02-07
- LA QUINTA HAWTHORN HOTEL, Leavenworth: WAR312877, issued 2020-11-18
- SQUALICUM CREEK TRAIL - SUNSET POND CONNECTOR, Bellingham: WAR313686, issued 2020-11-18
- LAKE STEVENS LIBRARY, Lake Stevens: WAR314091, issued 2020-11-18
- LYNDEN ICE PRODUCTION PLANT, Lynden: WAR314157, issued 2020-11-18
- PADDEN CREEK AT 12TH AND 14TH STREETS, Bellingham: WAR314581, issued 2020-11-18
Coverages issued nearest WAR314048
- 2020-11-18: ALASTOR GROUP, LLC, Ferndale: WAR314038, held by Alastor Group, LLC
- 2020-11-18: SHEPARD, Renton: WAR314043, held by Harbour Homes, LLC
- 2020-11-18: ELKINGTON, Bothell: WAR314044, held by Harbour Homes LLC
- 2020-11-18: ELKINGTON PHASE II, Bothell: WAR314045, held by Harbour Homes LLC
- 2020-11-18: THE RIDGES, Sumner: WAR314046, held by Nash Cascadia Verde, LLC
- 2020-11-18: LINDSAY SHORT PLAT, Vancouver: WAR314049, held by Hinton Development
- 2020-11-18: POINT NO POINT PARK PHASE 2, Hansville: WAR314051, held by Pacific Civil and Infrastructure
- 2020-11-18: TORVAL TOWNHOMES, Poulsbo: WAR314053, held by HTTS R2, LLC
- 2020-11-18: SUMMIT POINTE, Gig Harbor: WAR314055, held by Rush Residential, Inc.
- 2020-11-18: PACIFIC NORTHWEST NATIONAL LABORATORY SEQUIM CAMPUS, Sequim: WAR314056, held by Battelle Memorial Institute, Pacific NW Division
JAMES STREET AND BAKERVIEW ROAD INTERSECTION RECONSTRUCTION among its neighbors
70 discharge permits are in the Squalicum Creek-Frontal Bellingham Bay subwatershed (HUC 171100040601); WAR314048 is one.
Other permits in the Squalicum Creek-Frontal Bellingham Bay subwatershed (HUC 171100040601)
- 215 PRINCE AVENUE, Bellingham: WAR312409, minor, term to 2025-12-31
- AFFINITY AT BELLINGHAM, Bellingham: WAR302201, minor, term to 2015-12-31
- ALL AMERICAN MARINE, Bellingham: WAR315431, minor, term to 2029-12-31
- AMRIZE STONERIDGE, Bellingham: WAG503343, minor, term to 2026-03-31
- BAKERVIEW INDUSTRIAL STORAGE, Bellingham: WAR313799, minor, term to 2025-12-31
- BELL LUMBER & POLE COMPANY, Bellingham: WA0030813, minor, term to 2023-12-31
- BELLINGHAM SCHOOL DISTRICT, Bellingham: WAR045708, minor, term to 2024-07-31
- BELLINGHAM STP, Bellingham: WA0023744, major, term to 2019-06-30
- BELLINGHAM TECHNICAL COLLEGE, Bellingham: WAR045702, minor, term to 2024-07-31
- BELLIS FAIR BUILDING 1 – FAMILY HOUSING & ELC, Bellingham: WAR314128, minor, term to 2025-12-31
What stands out
- Its term runs 5 years and 43 days, November 18, 2020 to December 31, 2025; the term ended 258 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as administratively continued.
- No dated event in the 365 days to September 15, 2026.
- It is one of 8,573 discharge permits on the register in Washington; 4,744 of them (55%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | JAMES STREET AND BAKERVIEW ROAD INTERSECTION RECONSTRUCTION |
|---|---|
| Permittee | Faber Construction Corporation |
| NPDES ID | WAR314048 |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | November 18, 2020 |
| Expires | December 31, 2025 |
| Agency | State |
| Address | Bellingham, WA 98226 |
| Subwatershed | Squalicum Creek-Frontal Bellingham Bay (HUC 171100040601) |
NPDES WAR314048: effluent limits and exceedances
JAMES STREET AND BAKERVIEW ROAD INTERSECTION RECONSTRUCTION (NPDES WAR314048): 3 pollutants on file, 3 limited; 3 with a violation of any kind, 0 with an exceedance.
| Pollutant | Limits | Violations | Exceedances | Latest | Largest, as filed |
|---|---|---|---|---|---|
| pH | 2 | 2 | 0 | ||
| Turbidity | 1 | 1 | 0 | ||
| Transparency | 1 | 1 | 0 |
NPDES WAR314048: inspections, violations and enforcement
NPDES WAR314048 (JAMES STREET AND BAKERVIEW ROAD INTERSECTION RECONSTRUCTION): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES WAR314048
NPDES WAR314048: one email when its EPA record changes — $99/month.
Permits near NPDES WAR314048
NPDES WAR314048: 3 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.