NPDES WAR314147 · Clean Water Act
JEFFERSON KAUFFMAN REALIGNMENT PROJECT, Vancouver, WA: NPDES WAR314147 discharge permit, effluent exceedances, inspections, penalties
JEFFERSON KAUFFMAN REALIGNMENT PROJECT, Vancouver, Washington: General permit coverage WAR314147, held by Midway Underground, LLC; Construction stormwater; Administratively continued; issued November 18, 2020, term to December 31, 2025, by State.
- pH: 2 limits, 2 violations of any kind.
- Turbidity: 1 limit, 1 violation of any kind.
- Transparency: 1 limit, 1 violation of any kind.
- January 13, 2026: Evaluation (S).
Washington holds 4,744 Construction stormwater coverages of this permit type in EPA’s file; 1,658 were issued before WAR314147. Midway Underground, LLC holds 3 permits in Washington.
Other permits held by Midway Underground, LLC
- GREG CUOIO PARK - PHASE 1A, Lacey: WAR314183, issued 2020-11-18
- MALAGA WATER SYSTEM IMPROVEMENTS PHASE 2 - MEADOW LAKE RESERVOIRS EARTHWORK, Malaga: WAR315115, issued 2020-11-18
Coverages issued nearest WAR314147
- 2020-11-18: VRFA FIRE STATION 36, Auburn: WAR314138, held by Swinerton Builders
- 2020-11-18: I5 YESLER WAY TO NORTHGATE WAY, Seattle: WAR314139, held by Atkinson Construction
- 2020-11-18: GREENWALK PARK, Edmonds: WAR314140, held by Connor Homes at Greenwalk Park, LLC
- 2020-11-18: DESC LAKE CITY, Seattle: WAR314143, held by Washington Stormwater LLC
- 2020-11-18: NORTHEAST 182ND AVE & NORTHEAST RISTO ROAD ROADWAY IMPROVEMENTS, Battle Ground: WAR314146, held by Clark County Public Works
- 2020-11-18: WELL NO. 2R, West Richland: WAR314150, held by POW Contracting
- 2020-11-18: TIETON RIVER MILE 4.3 RESTORATION, Naches: WAR314153, held by Gibson and Son Road Building
- 2020-11-18: ELLIOTT ROAD FLOOD REDUCTION, Snohomish: WAR314155, held by Scarsella Bros., Inc.
- 2020-11-18: WESTWOOD ESTATES, Bothell: WAR314156, held by JM1 Holdings, LLC
- 2020-11-18: LYNDEN ICE PRODUCTION PLANT, Lynden: WAR314157, held by Faber Construction Corporation
JEFFERSON KAUFFMAN REALIGNMENT PROJECT among its neighbors
35 discharge permits are in the Hayden Island-Columbia River subwatershed (HUC 170900120500); WAR314147 is one.
Other permits in the Hayden Island-Columbia River subwatershed (HUC 170900120500)
- 15 WEST APARTMENT PROJECT, Vancouver: WAR301906, minor, term to 2015-12-31
- ALBINA ASPHALT - TERMINAL 2, Vancouver: WAR314737, minor, term to 2025-12-31
- ALBINA ASPHALT TERMINAL 2, Vancouver: WAR314739, minor, term to 2029-12-31
- BNSF VANCOUVER BYPASS PROJECT (VBP), Vancouver: WAR011992, minor, term to 2015-12-31
- BOWERS STEEL FRANCIS, Vancouver: WAR010297, minor, term to 2014-12-31
- C-TRAN BRT STATIONS, VMTC, MAINT. FAC., Vancouver: WAR303285, minor, term to 2015-12-31
- CHRISTENSEN SHIPYARDS LTD, Vancouver: WAR000034, minor, term to 2014-12-31
- COLUMBIA BUSINESS CENTER RAILROAD, Vancouver: WAR006669, minor, term to 2024-12-31
- COLUMBIA RIVER LOGISTICS, Vancouver: WAR006716, minor, term to 2014-12-31
- CROWN PARK, Camas: WAR313595, minor, term to 2025-12-31
What stands out
- Its term runs 5 years and 43 days, November 18, 2020 to December 31, 2025; the term ended 258 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as administratively continued.
- Its newest dated event on file is an inspection on January 13, 2026, 245 days before EPA's file was loaded.
- In the 365 days to September 15, 2026, it was dated 1 inspection.
- EPA's file dates 1 event for it, all in 2026.
- It is one of 8,573 discharge permits on the register in Washington; 4,744 of them (55%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | JEFFERSON KAUFFMAN REALIGNMENT PROJECT |
|---|---|
| Permittee | Midway Underground, LLC |
| NPDES ID | WAR314147 |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | November 18, 2020 |
| Expires | December 31, 2025 |
| Agency | State |
| Address | Vancouver, WA 98660 |
| Receiving water impaired | 303(D) Listed |
| Subwatershed | Hayden Island-Columbia River (HUC 170900120500) |
NPDES WAR314147: effluent limits and exceedances
JEFFERSON KAUFFMAN REALIGNMENT PROJECT (NPDES WAR314147): 3 pollutants on file, 3 limited; 3 with a violation of any kind, 0 with an exceedance.
| Pollutant | Limits | Violations | Exceedances | Latest | Largest, as filed |
|---|---|---|---|---|---|
| pH | 2 | 2 | 0 | ||
| Turbidity | 1 | 1 | 0 | ||
| Transparency | 1 | 1 | 0 |
NPDES WAR314147: inspections, violations and enforcement
NPDES WAR314147: 1 inspection
| Date | What EPA recorded | Agency |
|---|---|---|
| January 13, 2026 | Evaluation | S |
NPDES WAR314147 (JEFFERSON KAUFFMAN REALIGNMENT PROJECT): no single-event violation, formal enforcement action and informal enforcement action on file.
Watch NPDES WAR314147
NPDES WAR314147: one email when its EPA record changes — $99/month.
Permits near NPDES WAR314147
NPDES WAR314147: 3 pollutant rows, 1 dated events; ICIS-NPDES download, loaded September 15, 2026.