NPDES WAR314345 · Clean Water Act
WATER TRANSMISSION MAIN REPLACEMENT, Leavenworth, WA: NPDES WAR314345 discharge permit, effluent exceedances, inspections, penalties
WATER TRANSMISSION MAIN REPLACEMENT, Leavenworth, Washington: General permit coverage WAR314345, held by City of Leavenworth; Construction stormwater; Administratively continued; issued November 18, 2020, term to December 31, 2025, by State.
- pH: 2 limits, 30 violations of any kind.
- Turbidity: 1 limit, 15 violations of any kind.
- Transparency: 1 limit, 15 violations of any kind.
Washington holds 4,744 Construction stormwater coverages of this permit type in EPA’s file; 1,658 were issued before WAR314345. City of Leavenworth holds 4 permits in Washington.
Other permits held by City of Leavenworth
- LEAVENWORTH POTW, Leavenworth: WA0020974, issued 2017-09-22
- LEAVENWORTH WATER TREATMENT PLANT, Leavenworth: WAG645001, issued 2019-07-17
- PUBLIC WORKS CAMPUS, Leavenworth: WAR314819, issued 2024-12-02
Coverages issued nearest WAR314345
- 2020-11-18: TACOMA SMELTER PLUME GROUP 17 EPA, Tacoma: WAR314336, held by Green Earthworks Construction, Inc
- 2020-11-18: AFFINITY AT DUPONT, Dupont: WAR314337, held by Affinity at DuPont, LLC
- 2020-11-18: FORDS PRAIRIE INDUSTRIAL PARK PHASE 1, Centralia: WAR314338, held by Poe Construction, Inc.
- 2020-11-18: CHICK-FIL-A MARYSVILLE, Marysville: WAR314339, held by Chick-Fil-A, Inc.
- 2020-11-18: MOUNTAINVIEW MARKETPLACE LOT 3, Bonney Lake: WAR314343, held by HHJ Inc
- 2020-11-18: GRANITE HIGHLANDS MANOR HOMES, Washougal: WAR314346, held by Manor Homes Northwest Inc
- 2020-11-18: THE FARM MARYSVILLE, Marysville: WAR314348, held by K&A Investment Holdings, LLC
- 2020-11-18: BRADLEY HEIGHTS, Puyallup: WAR314349, held by Rush Commercial
- 2020-11-18: 5TH AVE NW IMPROVEMENTS PROJECT, Puyallup: WAR314351, held by Reed Trucking & Excavating, Inc.
- 2020-11-18: SNOHOMISH PUBLIC UTILITY DISTRICT NO.1, Arlington: WAR314352, held by Ameresco
WATER TRANSMISSION MAIN REPLACEMENT among its neighbors
1 discharge permits are in the Tumwater Canyon-Wenatchee River subwatershed (HUC 170200110703); WAR314345 is one.
What stands out
- Its term runs 5 years and 43 days, November 18, 2020 to December 31, 2025; the term ended 258 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as administratively continued.
- No dated event in the 365 days to September 15, 2026.
- It is one of 8,573 discharge permits on the register in Washington; 4,744 of them (55%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | WATER TRANSMISSION MAIN REPLACEMENT |
|---|---|
| Permittee | City of Leavenworth |
| NPDES ID | WAR314345 |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | November 18, 2020 |
| Expires | December 31, 2025 |
| Agency | State |
| Address | Leavenworth, WA 98826 |
| Subwatershed | Tumwater Canyon-Wenatchee River (HUC 170200110703) |
NPDES WAR314345: effluent limits and exceedances
WATER TRANSMISSION MAIN REPLACEMENT (NPDES WAR314345): 3 pollutants on file, 3 limited; 3 with a violation of any kind, 0 with an exceedance.
| Pollutant | Limits | Violations | Exceedances | Latest | Largest, as filed |
|---|---|---|---|---|---|
| pH | 2 | 30 | 0 | ||
| Turbidity | 1 | 15 | 0 | ||
| Transparency | 1 | 15 | 0 |
NPDES WAR314345: inspections, violations and enforcement
NPDES WAR314345 (WATER TRANSMISSION MAIN REPLACEMENT): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES WAR314345
NPDES WAR314345: one email when its EPA record changes — $99/month.
Permits near NPDES WAR314345
NPDES WAR314345: 3 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.