NPDES WAR314854 · Clean Water Act
NE 167TH AVE/170TH AVE WATER MAIN CONSTRUCTION, Brush Prairie, WA: NPDES WAR314854 discharge permit, effluent exceedances, inspections, penalties
NE 167TH AVE/170TH AVE WATER MAIN CONSTRUCTION, Brush Prairie, Washington: General permit coverage WAR314854, held by Rotschy Inc.; Construction stormwater; Administratively continued; issued November 18, 2020, term to December 31, 2025, by State.
- pH: 2 limits, 28 violations of any kind.
- Turbidity: 1 limit, 14 violations of any kind.
- Transparency: 1 limit, 9 violations of any kind.
- May 4, 2026: Evaluation (S).
Washington holds 4,744 Construction stormwater coverages of this permit type in EPA’s file; 1,658 were issued before WAR314854. Rotschy Inc. holds 9 permits in Washington.
Other permits held by Rotschy Inc.
- GREEN MOUNTAIN URBAN VILLAGE, Camas: WAR309988, issued 2020-11-18
- RIDGEFIELD HEIGHTS ODC, Ridgefield: WAR312741, issued 2020-11-18
- SCHNELL FARMS PUD, Vancouver: WAR314388, issued 2020-11-18
- MOUNTAIN VIEW SITE, Ridgefield: WAR315013, issued 2020-11-18
- COMPASS INVESTMENT FUND LLC, Vancouver: WAR315575, issued 2025-11-19
- PEDESTRIAN CROSSING REPLACEMENT, Kalama: WAR315680, issued 2025-11-19
- VINEYARD VISTA, La Center: WAR315759, issued 2025-11-19
- 88TH STREET SUBDIVISION, Vancouver: WAR315828, issued 2025-11-19
Coverages issued nearest WAR314854
- 2020-11-18: GREENWOOD APARTMENTS, Seattle: WAR314849, held by Ryan Companies
- 2020-11-18: BLAKELEY VILLAGE, Seattle: WAR314850, held by GDSU Washington LLC
- 2020-11-18: TRIPLE 60 PARTNERS LLC, North Bend: WAR314851, held by Triple 60 Partners, LLC
- 2020-11-18: RUTLEDGE JOHNSON FLOODPLAIN RESTORATION PROJECT, Maple Valley: WAR314852, held by King County Water and Land Resources Division
- 2020-11-18: SKYVIEW EAST, Vancouver: WAR314853, held by Ten Talents Investments 19 LLC
- 2020-11-18: RENTON FIRE STATION 16, Renton: WAR314855, held by LPD Engineering
- 2020-11-18: COOK PROPERTY SUBDIVISION SITE, Battle Ground: WAR314856, held by MLR Investments, LLC
- 2020-11-18: 10TH STREET PROJECT, Bellingham: WAR314857, held by Boiler Works, LLC
- 2020-11-18: TERMINAL 18 SHORE POWER, Seattle: WAR314858, held by Port of Seattle
- 2020-11-18: THE GALLERY AT RICHMOND BEACH, Shoreline: WAR314859, held by Ryan Companies US, Inc.
NE 167TH AVE/170TH AVE WATER MAIN CONSTRUCTION among its neighbors
48 discharge permits are in the Upper Salmon River subwatershed (HUC 170900120302); WAR314854 is one.
Other permits in the Upper Salmon River subwatershed (HUC 170900120302)
- 2408 SE GRACE AVENUE, Battle Ground: WAR313377, minor, term to 2025-12-31
- 25TH ST TOWNHOMES SUBDIVISION, Battle Ground: WAR311070, minor, term to 2025-12-31
- 503 BATTLE GROUND SUBDIVISION, Battle Ground: WAR308997, minor, term to 2025-12-31
- ALLWORTH VALLEY ESTATES, Battle Ground: WAR302700, minor, term to 2015-12-31
- ANDERSEN DAIRY INC, Battle Ground: WAR125110, minor, term to 2024-12-31
- BATTLE GROUND CITY, Battle Ground: WAR045001, minor, term to 2024-07-31
- BATTLE GROUND VILLAGE EXTENSION, Battle Ground: WAR314889, minor, term to 2025-12-31
- BELLIKKA SUBDIVISION, Battle Ground: WAR314690, minor, term to 2025-12-31
- BG CORPORATE CENTER LOT 11, Battle Ground: WAR315502, minor, term to 2030-12-31
- BLOOMQUIST 2 SUBDIVISION, Battle Ground: WAR313000, minor, term to 2025-12-31
What stands out
- Its term runs 5 years and 43 days, November 18, 2020 to December 31, 2025; the term ended 287 days before EPA's file was loaded on October 14, 2026, and the file lists the permit as administratively continued.
- Its newest dated event on file is an inspection on May 4, 2026, 163 days before EPA's file was loaded.
- In the 365 days to October 14, 2026, it was dated 1 inspection.
- EPA's file dates 1 event for it, all in 2026.
- It is one of 8,573 discharge permits on the register in Washington; 4,744 of them (55%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | NE 167TH AVE/170TH AVE WATER MAIN CONSTRUCTION |
|---|---|
| Permittee | Rotschy Inc. |
| NPDES ID | WAR314854 |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | November 18, 2020 |
| Expires | December 31, 2025 |
| Agency | State |
| Address | Brush Prairie, WA 98606 |
| Receiving water impaired | 303(D) Listed |
| Subwatershed | Upper Salmon River (HUC 170900120302) |
| SIC | 1794 – Excavation Work |
NPDES WAR314854: effluent limits and exceedances
NE 167TH AVE/170TH AVE WATER MAIN CONSTRUCTION (NPDES WAR314854): 3 pollutants on file, 3 limited; 3 with a violation of any kind, 0 with an exceedance.
| Pollutant | Limits | Violations | Exceedances | Latest | Largest, as filed |
|---|---|---|---|---|---|
| pH | 2 | 28 | 0 | ||
| Turbidity | 1 | 14 | 0 | ||
| Transparency | 1 | 9 | 0 |
NPDES WAR314854: inspections, violations and enforcement
NPDES WAR314854: 1 inspection
| Date | What EPA recorded | Agency |
|---|---|---|
| May 4, 2026 | Evaluation | S |
NPDES WAR314854 (NE 167TH AVE/170TH AVE WATER MAIN CONSTRUCTION): no single-event violation, formal enforcement action and informal enforcement action on file.
Watch NPDES WAR314854
NPDES WAR314854: one email when its EPA record changes — $99/month.
Permits near NPDES WAR314854
NPDES WAR314854: 3 pollutant rows, 1 dated events; ICIS-NPDES download, loaded October 14, 2026.