NPDES WAR314965 · Clean Water Act
BOEING THOMPSON SITE CONSTRUCTION, Tukwila, WA: NPDES WAR314965 discharge permit, effluent exceedances, inspections, penalties
BOEING THOMPSON SITE CONSTRUCTION, Tukwila, Washington: General permit coverage WAR314965, held by The Boeing Company; Construction stormwater; Administratively continued; issued November 18, 2020, term to December 31, 2025, by State.
19 of the 24 pollutants listed for NPDES WAR314965 have no violation or effluent exceedance.
- Di[2-ethylhexyl] phthalate [DEHP]: 4 limits, 1 violation of any kind, 1 effluent exceedance, latest November 30, 2025, largest 21% over the limit.
- pH: 8 limits, 12 violations of any kind.
- Transparency: 4 limits, 5 violations of any kind.
- Total Petroleum Hydrocarbons - Gasoline: 4 limits, 5 violations of any kind.
- Turbidity: 4 limits, 4 violations of any kind.
- Arsenic, total [as As]: 4 limits.
- Barium, total [as Ba]: 4 limits.
- Beryllium, total [as Be]: 4 limits.
- Cadmium, total [as Cd]: 4 limits.
- Chromium, total [as Cr]: 4 limits.
- Copper, total [as Cu]: 4 limits.
- Lead, total [as Pb]: 4 limits.
- Nickel, total [as Ni]: 4 limits.
- Zinc, total [as Zn]: 4 limits.
- Benzo[b]fluoranthene: 4 limits.
- Benzo[k]fluoranthene: 4 limits.
- Benzo[a]pyrene: 4 limits.
- Chrysene: 4 limits.
- Indeno[1,2,3-cd]pyrene: 4 limits.
- Benzo[a]anthracene: 4 limits.
- Vinyl chloride: 4 limits.
- Polychlorinated biphenyls [PCBs]: 4 limits.
- Total Petroleum Hydrocarbons - Diesel: 4 limits.
- Mercury, total [as Hg]: 4 limits.
Washington holds 4,744 Construction stormwater coverages of this permit type in EPA’s file; 1,658 were issued before WAR314965. The Boeing Company holds 16 permits in Washington.
Other permits held by The Boeing Company
- BOEING DEVELOPMENTAL CENTER, Tukwila: WAR000146, issued 2019-11-20
- BOEING ELECTRONICS CENTER, Renton: WAR000147, issued 2019-11-20
- BOEING THOMPSON SITE, Tukwila: WAR000148, issued 2019-11-20
- BOEING MILITARY DELIVERY CENTER, Tukwila: WAR000150, issued 2019-11-20
- THE BOEING COMPANY AUBURN SITE, Auburn: WAR000221, issued 2019-11-20
- BOEING SPACE CENTER, Kent: WAR000481, issued 2019-11-20
- BOEING EVERETT, Everett: WAR001143, issued 2019-11-20
- BOEING PAINE FIELD LEASED AREAS, Everett: WAR124607, issued 2019-11-20
- BOEING EVERETT MODIFICATION CENTER, Everett: WAR126710, issued 2019-11-20
- BOMARC 45 70, Everett: WAR313619, issued 2019-11-20
Coverages issued nearest WAR314965
- 2020-11-18: ADAMS TRACTOR, Spokane: WAR314959, held by StanCraft Construction Group
- 2020-11-18: RUSH GATEWAY – MASS GRADING, Belfair: WAR314960
- 2020-11-18: BELLWETHER OVERLAKE APARTMENTS, Redmond: WAR314961, held by Walsh Construction Co.
- 2020-11-18: KENT VALVOLINE INSTANT OIL CHANGE, Kent: WAR314962, held by Valvoline
- 2020-11-18: WOODLAND CREEK SUBDIVISION HOLT PH 1 & 2, Woodland: WAR314964, held by Holt Holdings WA LLC
- 2020-11-18: KESSEL COURT, Vader: WAR314966, held by DARO LLC
- 2020-11-18: SIERRA GROVE, Shoreline: WAR314967, held by Adamant Homes, Inc.
- 2020-11-18: BNSF CONNELL INTERCHANGE TRACK, Connell: WAR314968, held by BNSF Railway Co.
- 2020-11-18: KENMORE PUBLIC WORKS OPERATIONS CENTER, Kenmore: WAR314969, held by City of Kenmore
- 2020-11-18: MEADOWVIEW BY PULTE (URBAN DOWNS II), Ridgefield: WAR314971, held by Pulte Homes of Washington
BOEING THOMPSON SITE CONSTRUCTION among its neighbors
362 discharge permits are in the Green River subwatershed (HUC 171100130305); WAR314965 is one. Its county: 1,319, 8 major; WAR314965 is minor permit.
Other permits in the Green River subwatershed (HUC 171100130305)
- 116TH AVENUE SE AND SE 248TH STREET ROUNDABOUT, Kent: WAR316076, minor, term to 2030-12-31
- 37TH & 40TH AVE SIDEWALK PROJECT, Seatac: WAR303423, minor, term to 2015-12-31
- 5TH AVENUE TOWNHOMES, Kent: WAR303021, minor, term to 2015-12-31
- 7 ELEVEN WEST VALLEY HWY, Tukwila: WAR313558, minor, term to 2025-12-31
- 76TH AVE S ROAD RAISING, Kent: WAR309038, minor, term to 2025-12-31
- 8801 E MARGINAL WAY S, Tukwila: WAR008681, minor, term to 2014-12-31
- ABF FREIGHT SYSTEMS KENT, Kent: WAR313014, minor, term to 2024-12-31
- ABX AIR INC SEATTLE, Seattle: WAR004602, minor, term to 2014-12-31
- ACE GALVANIZING INC 96TH, Seattle: WAR000154, minor, term to 2024-12-31
- AIRGAS KENT, Kent: WAR312174, minor, term to 2025-12-31
What stands out
- Its term runs 5 years and 43 days, November 18, 2020 to December 31, 2025; the term ended 258 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as administratively continued.
- No dated event in the 365 days to September 15, 2026.
- 1 of its 24 pollutants on file has an effluent exceedance (4.2%); 24 are under a numeric limit; the largest exceedance is Di[2-ethylhexyl] phthalate [DEHP] at 21% over its limit.
- It is one of 8,573 discharge permits on the register in Washington; 4,744 of them (55%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | BOEING THOMPSON SITE CONSTRUCTION |
|---|---|
| Permittee | The Boeing Company |
| NPDES ID | WAR314965 |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | November 18, 2020 |
| Expires | December 31, 2025 |
| Agency | State |
| Address | Tukwila, WA 98108 |
| Receiving water impaired | 303(D) Listed |
| Subwatershed | Green River (HUC 171100130305) |
| Other EPA IDs (FRS) | RCRA handler WAD980982912 |
NPDES WAR314965: effluent limits and exceedances
BOEING THOMPSON SITE CONSTRUCTION (NPDES WAR314965): 24 pollutants on file, 24 limited; 5 with a violation of any kind, 1 with an exceedance.
| Pollutant | Limits | Violations | Exceedances | Latest | Largest, as filed |
|---|---|---|---|---|---|
| Di[2-ethylhexyl] phthalate [DEHP] | 4 | 1 | 1 | November 30, 2025 | 21% over the limit |
| pH | 8 | 12 | 0 | ||
| Transparency | 4 | 5 | 0 | ||
| Total Petroleum Hydrocarbons - Gasoline | 4 | 5 | 0 | ||
| Turbidity | 4 | 4 | 0 | ||
| Arsenic, total [as As] | 4 | 0 | 0 | ||
| Barium, total [as Ba] | 4 | 0 | 0 | ||
| Beryllium, total [as Be] | 4 | 0 | 0 | ||
| Cadmium, total [as Cd] | 4 | 0 | 0 | ||
| Chromium, total [as Cr] | 4 | 0 | 0 | ||
| Copper, total [as Cu] | 4 | 0 | 0 | ||
| Lead, total [as Pb] | 4 | 0 | 0 | ||
| Nickel, total [as Ni] | 4 | 0 | 0 | ||
| Zinc, total [as Zn] | 4 | 0 | 0 | ||
| Benzo[b]fluoranthene | 4 | 0 | 0 | ||
| Benzo[k]fluoranthene | 4 | 0 | 0 | ||
| Benzo[a]pyrene | 4 | 0 | 0 | ||
| Chrysene | 4 | 0 | 0 | ||
| Indeno[1,2,3-cd]pyrene | 4 | 0 | 0 | ||
| Benzo[a]anthracene | 4 | 0 | 0 | ||
| Vinyl chloride | 4 | 0 | 0 | ||
| Polychlorinated biphenyls [PCBs] | 4 | 0 | 0 | ||
| Total Petroleum Hydrocarbons - Diesel | 4 | 0 | 0 | ||
| Mercury, total [as Hg] | 4 | 0 | 0 |
NPDES WAR314965: inspections, violations and enforcement
NPDES WAR314965 (BOEING THOMPSON SITE CONSTRUCTION): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES WAR314965
NPDES WAR314965: one email when its EPA record changes — $99/month.
Permits near NPDES WAR314965
NPDES WAR314965: 24 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.