Velarion Records
Follow this permit Velarion Records emails you this permit’s record, cited to the public filing, and tells you when the register changes it. Free.
One more press on the next page sends it; there is no link to click in an email. The continuous daily watch on every change is the paid alert. Unsubscribe any time.
Also free: The Pay Desk, the weekly executive pay briefing.

Clean Water Act discharge permit · NPDES WAR315182

BARNABIE POINT PROJECT, Mercer Island, WA: NPDES WAR315182 discharge permit, effluent exceedances, inspections, penalties

BARNABIE POINT PROJECT, held by Exxel Pacific, Inc., holds NPDES permit WAR315182. EPA’s file records it issued November 18, 2020 and expiring December 31, 2025. The status and dates are as EPA’s permit file stood when Velarion loaded it (October 14, 2026); EPA’s free Detailed Facility Report on ECHO carries the permit’s current standing.

What stands out

  • Its term runs 5 years and 43 days, November 18, 2020 to December 31, 2025; the term ended 287 days before EPA's file was loaded on October 14, 2026, and the file lists the permit as administratively continued.
  • No dated event in the 365 days to October 14, 2026.
  • It is one of 8,573 discharge permits on the register in Washington; 4,744 of them (55%) are in its program, Construction stormwater, and it is a minor discharger.

Identity

Facility as filedBARNABIE POINT PROJECT
Permittee as filedExxel Pacific, Inc.
NPDES IDWAR315182
Permit statusAdministratively continued (past its expiration date and still in force until reissued)
Permit typeCoverage under a general permit
Discharger classMinor discharger
Facility typeNot a publicly owned treatment works
ProgramConstruction stormwater
IssuedNovember 18, 2020
Expiration dateDecember 31, 2025
Issuing agencyState
AddressMercer Island, WA 98040
SubwatershedLake Washington-Sammamish River (HUC 171100120400)
SIC1794 – Excavation Work

Cited to the EPA ICIS-NPDES permit file (ECHO download) and EPA’s NAICS/SIC and component files, the same download.

Effluent limits and exceedances

An effluent exceedance is a discharge monitoring report value over the permit’s numeric limit (EPA’s violation code E90). A violation of any kind also counts a report not filed. Each row is EPA’s own count for that pollutant.

Pollutant or measureLimitsViolations, any kindEffluent exceedancesLatest exceedanceLargest exceedance, as filed
pH020
Turbidity010
Transparency010

EPA’s effluent violation file records no exceedance of a numeric limit for NPDES WAR315182.

Cited to the EPA ICIS-NPDES limits and effluent violations files (ECHO download); up to 60 rows shown, most exceedances first.

Inspections, violations and enforcement

EPA’s single-event violation file, as loaded, holds no violation for NPDES WAR315182.

Inspections

EPA’s inspection file holds no inspection for NPDES WAR315182.

Formal enforcement and penalties

0 formal actions, 0 of them with a penalty assessed. Federal and state penalties are separate figures from separate authorities and are shown as each was filed, never added together.

Informal enforcement

EPA’s informal enforcement file holds no action for NPDES WAR315182.

Cited to the EPA ICIS-NPDES violation, inspection and enforcement files (ECHO download); up to 50 rows of each shown, newest first.

Watch this permit

One permit holder, $99/month. Watch the register for one permit holder and the places and receiving waters tied to its permits. Choose “One permit holder” and enter this permit’s NPDES ID, WAR315182.

Start the watch

How often?
  • One permit holder — $99/month
  • One watershed — $2,990/year
  • One state — $4,990/year
  • The whole register — $18,000/year

How we handle your data → Privacy

EPA publishes a free Detailed Facility Report for every permit on ECHO: its compliance status quarter by quarter, its inspections, and its enforcement actions and penalties. EPA also sends free notices of new inspections and enforcement actions through ECHO Notify; enter NPDES ID WAR315182 there.

BARNABIE POINT PROJECT, Mercer Island, Washington: Coverage under a general permit WAR315182, held by Exxel Pacific, Inc.; Construction stormwater; Administratively continued (past its expiration date and still in force until reissued); issued November 18, 2020, term to December 31, 2025, by State.

  • pH: 0 limits, 2 violations of any kind.
  • Turbidity: 0 limits, 1 violation of any kind.
  • Transparency: 0 limits, 1 violation of any kind.

Washington holds 4,744 Construction stormwater coverages of this permit type in EPA’s file; 1,658 were issued before WAR315182.

Coverages issued nearest WAR315182

BARNABIE POINT PROJECT among its neighbors

475 discharge permits are in the Lake Washington-Sammamish River subwatershed (HUC 171100120400); WAR315182 is one. Its county: 1,319, 8 major; WAR315182 is minor permit.

Other permits in the Lake Washington-Sammamish River subwatershed (HUC 171100120400)

Nearby on the register

Figures from EPA’s ICIS-NPDES download, loaded October 14, 2026.

What this page shows

The Barnabie Point Project, a storm water construction permit held by Exxel Pacific, Inc. in Mercer Island, is one of 756 such permits in King County, where 82.1% carry a violation on file. Among 753 storm water construction permits in King County, 56.2% were issued before this one, and the permit recorded no pollutants under a numeric limit and no effluent exceedances.