Velarion Records
Follow this permit Velarion Records emails you this permit’s record, cited to the public filing, and tells you when the register changes it. Free.
One more press on the next page sends it; there is no link to click in an email. The continuous daily watch on every change is the paid alert. Unsubscribe any time.
Also free: The Pay Desk, the weekly executive pay briefing.

Clean Water Act discharge permit · NPDES WAR315520

MALAGA WATER SYSTEM IMPROVEMENTS PH 2 WALLACE RD TRANS WATER MAIN AND RESERVOIRS, Malaga, WA: NPDES WAR315520 discharge permit, effluent exceedances, inspections, penalties

MALAGA WATER SYSTEM IMPROVEMENTS PH 2 WALLACE RD TRANS WATER MAIN AND RESERVOIRS, held by Chelan Douglas Regional Port Authority, holds NPDES permit WAR315520. EPA’s file records it issued November 19, 2025 and expiring December 31, 2030. The status and dates are as EPA’s permit file stood when Velarion loaded it (September 15, 2026); EPA’s free Detailed Facility Report on ECHO carries the permit’s current standing.

What stands out

  • Its term runs 5 years and 42 days, November 19, 2025 to December 31, 2030.
  • No dated event in the 365 days to September 15, 2026.
  • It is one of 8,573 discharge permits on the register in Washington; 4,744 of them (55%) are in its program, Construction stormwater, and it is a minor discharger.

Identity

Facility as filedMALAGA WATER SYSTEM IMPROVEMENTS PH 2 WALLACE RD TRANS WATER MAIN AND RESERVOIRS
Permittee as filedChelan Douglas Regional Port Authority
NPDES IDWAR315520
Permit statusEffective
Permit typeCoverage under a general permit
Discharger classMinor discharger
Facility typeNot a publicly owned treatment works
ProgramConstruction stormwater
IssuedNovember 19, 2025
Expiration dateDecember 31, 2030
Issuing agencyState
AddressMalaga, WA 98828
SubwatershedHammond Lake-Columbia River (HUC 170200100313)

Cited to the EPA ICIS-NPDES permit file (ECHO download).

Effluent limits and exceedances

An effluent exceedance is a discharge monitoring report value over the permit’s numeric limit (EPA’s violation code E90). A violation of any kind also counts a report not filed. Each row is EPA’s own count for that pollutant.

Pollutant or measureLimitsViolations, any kindEffluent exceedancesLatest exceedanceLargest exceedance, as filed
pH240
Turbidity120
Transparency120

EPA’s effluent violation file records no exceedance of a numeric limit for NPDES WAR315520.

Cited to the EPA ICIS-NPDES limits and effluent violations files (ECHO download); up to 60 rows shown, most exceedances first.

Inspections, violations and enforcement

EPA’s single-event violation file, as loaded, holds no violation for NPDES WAR315520.

Inspections

EPA’s inspection file holds no inspection for NPDES WAR315520.

Formal enforcement and penalties

0 formal actions, 0 of them with a penalty assessed. Federal and state penalties are separate figures from separate authorities and are shown as each was filed, never added together.

Informal enforcement

EPA’s informal enforcement file holds no action for NPDES WAR315520.

Cited to the EPA ICIS-NPDES violation, inspection and enforcement files (ECHO download); up to 50 rows of each shown, newest first.

Watch this permit

One permit holder, $99/month. Watch the register for one permit holder and the places and receiving waters tied to its permits. Choose “One permit holder” and enter this permit’s NPDES ID, WAR315520.

Start the watch

How often?
  • One permit holder — $99/month
  • One watershed — $2,990/year
  • One state — $4,990/year
  • The whole register — $18,000/year

How we handle your data → Privacy

EPA publishes a free Detailed Facility Report for every permit on ECHO: its compliance status quarter by quarter, its inspections, and its enforcement actions and penalties. EPA also sends free notices of new inspections and enforcement actions through ECHO Notify; enter NPDES ID WAR315520 there.

MALAGA WATER SYSTEM IMPROVEMENTS PH 2 WALLACE RD TRANS WATER MAIN AND RESERVOIRS, Malaga, Washington: Coverage under a general permit WAR315520, held by Chelan Douglas Regional Port Authority; Construction stormwater; Effective; issued November 19, 2025, term to December 31, 2030, by State.

  • pH: 2 limits, 4 violations of any kind.
  • Turbidity: 1 limit, 2 violations of any kind.
  • Transparency: 1 limit, 2 violations of any kind.

Washington holds 4,744 Construction stormwater coverages of this permit type in EPA’s file; 3,913 were issued before WAR315520.

Coverages issued nearest WAR315520

MALAGA WATER SYSTEM IMPROVEMENTS PH 2 WALLACE RD TRANS WATER MAIN AND RESERVOIRS among its neighbors

36 discharge permits are in the Hammond Lake-Columbia River subwatershed (HUC 170200100313); WAR315520 is one.

Other permits in the Hammond Lake-Columbia River subwatershed (HUC 170200100313)

Nearby on the register

Figures from EPA’s ICIS-NPDES download, loaded September 15, 2026.

What this page shows

This public-records page covers Clean Water Act NPDES permit WAR315520 for the Malaga Water System Improvements Ph 2 facility in Malaga, WA, held by Chelan Douglas Regional Port Authority, with a Minor discharger class and a Construction stormwater program. The page lists a permit status of Effective, an issue date of November 19, 2025, an expiration date of December 31, 2030, and 0 pollutants under a numeric limit, with the subwatershed given as Hammond Lake-Columbia River (HUC 170200100313).