NPDES WAR315673 · Clean Water Act
ROOSEVELT WAY PRESERVATION PROJECT, Seattle, WA: NPDES WAR315673 discharge permit, effluent exceedances, inspections, penalties
ROOSEVELT WAY PRESERVATION PROJECT, Seattle, Washington: General permit coverage WAR315673, held by Seattle Department of Transportation; Construction stormwater; Effective; issued November 19, 2025, term to December 31, 2030, by State.
No violation or effluent exceedance is on file for any of the 3 pollutants listed for NPDES WAR315673.
- pH: 2 limits.
- Turbidity: 1 limit.
- Transparency: 1 limit.
Washington holds 4,744 Construction stormwater coverages of this permit type in EPA’s file; 3,913 were issued before WAR315673. Seattle Department of Transportation holds 8 permits in Washington.
Other permits held by Seattle Department of Transportation
- SEATTLE DOT - FREMONT BRIDGE, Seattle: WAG994703, issued 2022-06-29
- SEATTLE DOT - BALLARD BRIDGE, Seattle: WAG994704, issued 2022-06-29
- BURKE-GILMAN TRAIL MISSING LINK, Seattle: WAR305992, issued 2020-11-18
- GREENWOOD AVE N SIDEWALK IMPROVEMENTS, Seattle: WAR314795, issued 2020-11-18
- 1ST AVE NE SHARED USE PATH PROJECT, Seattle: WAR315517, issued 2025-11-19
- EAST MARGINAL WAY S PRESERVATION, Seattle: WAR315535, issued 2025-11-19
- PRIORITY CURB RAMPS PROJECT, Seattle: WAR315834, issued 2025-11-19
Coverages issued nearest WAR315673
- 2025-11-19: ICON DRAINAGE FACILITY, Maple Valley: WAR315667, held by Integrity Land, LLC
- 2025-11-19: WESLEY HOMES DES MOINES PHASE 5, Des Moines: WAR315668, held by Walsh Construction Co
- 2025-11-19: SAMMAMISH SUBSTATION SECURITY PROJECT, Redmond: WAR315669, held by Puget Sound Energy
- 2025-11-19: DOE TOWNHOMES, Bellevue: WAR315670, held by DOE TH Development LLC
- 2025-11-19: ORCAS ISLAND SCHOOL DISTRICT, Eastsound: WAR315672, held by Tiger Construction Ltd
- 2025-11-19: NORTHWEST TOWNHOMES, Bellingham: WAR315675, held by GB Northwest Inc
- 2025-11-19: CHERRY COURT, Port Orchard: WAR315677, held by Irish Kelly LLC
- 2025-11-19: CHERRY HILL PARTIAL, Kingston: WAR315678, held by Irish Kerry LLC
- 2025-11-19: SVIA, Spokane Valley: WAR315679, held by Garco Construction
- 2025-11-19: PEDESTRIAN CROSSING REPLACEMENT, Kalama: WAR315680, held by Rotschy Inc.
ROOSEVELT WAY PRESERVATION PROJECT among its neighbors
475 discharge permits are in the Lake Washington-Sammamish River subwatershed (HUC 171100120400); WAR315673 is one.
Other permits in the Lake Washington-Sammamish River subwatershed (HUC 171100120400)
- 10400 NE 52ND STREET, Kirkland: WAR127048, minor, term to 2015-12-31
- 11040 MAIN STREET, Bellevue: WAR315164, minor, term to 2025-12-31
- 115 KV LINE SEATTLE, Seattle: WAR303474, minor, term to 2015-12-31
- 120TH AVE NE STAGE 2, Bellevue: WAR302269, minor, term to 2015-12-31
- 120TH AVE NE STAGE 2, Bellevue: WAR302988, minor, term to 2015-12-31
- 120TH AVE NE STAGE 2 - A, Bellevue: WAR302686, minor, term to 2015-12-31
- 124TH AVE NE PEDESTRIAN SAFETY IMPROVEMENTS, Kirkland: WAR313048, minor, term to 2025-12-31
- 145TH STREET AND I5 INTERCHANGE IMPROVEMENTS, Shoreline: WAR312278, minor, term to 2025-12-31
- 150TH AVENUE SE AT I90 ROADWAY PROJECT, Bellevue: WAR314605, minor, term to 2025-12-31
- 1740 NW MARKET ST, Seattle: WAR315491, minor, term to 2030-12-31
What stands out
- Its term runs 5 years and 42 days, November 19, 2025 to December 31, 2030.
- No dated event in the 365 days to October 14, 2026.
- It is one of 8,573 discharge permits on the register in Washington; 4,744 of them (55%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | ROOSEVELT WAY PRESERVATION PROJECT |
|---|---|
| Permittee | Seattle Department of Transportation |
| NPDES ID | WAR315673 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | November 19, 2025 |
| Expires | December 31, 2030 |
| Agency | State |
| Address | Seattle, WA 98125 |
| Subwatershed | Lake Washington-Sammamish River (HUC 171100120400) |
| SIC | 1794 – Excavation Work |
NPDES WAR315673: effluent limits and exceedances
ROOSEVELT WAY PRESERVATION PROJECT (NPDES WAR315673): 3 pollutants on file, 3 limited; 0 with a violation of any kind, 0 with an exceedance.
| Pollutant | Limits | Violations | Exceedances | Latest | Largest, as filed |
|---|---|---|---|---|---|
| pH | 2 | 0 | 0 | ||
| Turbidity | 1 | 0 | 0 | ||
| Transparency | 1 | 0 | 0 |
NPDES WAR315673: inspections, violations and enforcement
NPDES WAR315673 (ROOSEVELT WAY PRESERVATION PROJECT): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES WAR315673
NPDES WAR315673: one email when its EPA record changes — $99/month.
Permits near NPDES WAR315673
NPDES WAR315673: 3 pollutant rows, 0 dated events; ICIS-NPDES download, loaded October 14, 2026.