Velarion Records
Free: one email when NPDES WAR316019 changes. Unsubscribe any time.

NPDES WAR316019 · Clean Water Act

SUGAR CHANNEL RECONNECTION PROJECT RIGHT, Twisp, WA: NPDES WAR316019 discharge permit, effluent exceedances, inspections, penalties

SUGAR CHANNEL RECONNECTION PROJECT RIGHT, Twisp, Washington: General permit coverage WAR316019, held by Hurst Construction; Construction stormwater; Effective; issued November 19, 2025, term to December 31, 2030, by State.

No violation or effluent exceedance is on file for any of the 2 pollutants listed for NPDES WAR316019.

  • pH: 8 limits.
  • Turbidity: 4 limits.

Washington holds 4,744 Construction stormwater coverages of this permit type in EPA’s file; 3,913 were issued before WAR316019.

Coverages issued nearest WAR316019

SUGAR CHANNEL RECONNECTION PROJECT RIGHT among its neighbors

7 discharge permits are in the Thompson Creek-Methow River subwatershed (HUC 170200080605); WAR316019 is one. Its county: 57, 0 major; WAR316019 is minor permit.

Other permits in the Thompson Creek-Methow River subwatershed (HUC 170200080605)

What stands out

  • Its term runs 5 years and 42 days, November 19, 2025 to December 31, 2030.
  • No dated event in the 365 days to September 15, 2026.
  • It is one of 8,573 discharge permits on the register in Washington; 4,744 of them (55%) are in its program, Construction stormwater, and it is a minor discharger.

Identity

FacilitySUGAR CHANNEL RECONNECTION PROJECT RIGHT
PermitteeHurst Construction
NPDES IDWAR316019
StatusEffective
TypeGeneral permit coverage
ClassMinor
Facility typeNon-POTW
ProgramConstruction stormwater
IssuedNovember 19, 2025
ExpiresDecember 31, 2030
AgencyState
AddressTwisp, WA 98856
Receiving water impaired303(D) Listed
SubwatershedThompson Creek-Methow River (HUC 170200080605)

NPDES WAR316019: effluent limits and exceedances

SUGAR CHANNEL RECONNECTION PROJECT RIGHT (NPDES WAR316019): 2 pollutants on file, 2 limited; 0 with a violation of any kind, 0 with an exceedance.

How exceedances are counted.

PollutantLimitsViolationsExceedancesLatestLargest, as filed
pH800
Turbidity400

NPDES WAR316019: inspections, violations and enforcement

NPDES WAR316019 (SUGAR CHANNEL RECONNECTION PROJECT RIGHT): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.

Watch NPDES WAR316019

NPDES WAR316019: one email when its EPA record changes — $99/month.

Billing

Privacy

Permits near NPDES WAR316019

NPDES WAR316019: 2 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.