EPA · Washington · discharge permits by watershed
Watershed 1710010401 in Washington
- 7Permits in Washington
A watershed is a unit of the national Watershed Boundary Dataset, and water crosses state lines: this page holds only the permits placed in Washington. Each permit is placed by the outfall EPA names as its representative discharge point.
Permits
| Permit holder | NPDES ID | City | Program | Discharger | Receiving water |
|---|---|---|---|---|---|
| NORTHWEST ROCK, INC. - CHANDLER PIT | WAG501538 | ELMA | Minor | Lower East Fork Satsop River | |
| NORTHWEST ROCK, INC. - DECKER CREEK PIT | WAG501524 | ELMA | Minor | Decker Creek | |
| NORTHWEST ROCK, INC. - STUDER PIT | WAG501110 | MONTESANO | Minor | Lower East Fork Satsop River | |
| PORT BLAKELY SKOOKUM ROCK QUARRY | WAG501076 | MCCLEARY | Minor | Lower East Fork Satsop River | |
| SATSOP RIVER MILE 0.7 TO 2.0 | WAR314466 | MONTESANO | Construction stormwater | Minor | Town of Satsop-Satsop River |
| SATSOP RIVER MILE 2.5-5.0 | WAR313382 | MONTESANO | Construction stormwater | Minor | Town of Satsop-Satsop River |
| STILLWATER INDUSTRIAL PARK | WAR000787 | SHELTON | Minor | Upper East Fork Satsop River |
Other watersheds in Washington
- Subbasin 17010216 25
- Watershed 1701021601 12
- Subwatershed 170102160107 3
- Subwatershed 170102160111 4
- Watershed 1701021603 11
- Subwatershed 170102160302 4
- Subwatershed 170102160308 3
- Subbasin 17010305 108
- Watershed 1701030503 9
- Subwatershed 170103050306 8
- Watershed 1701030504 99
- Subwatershed 170103050401 3
- Subwatershed 170103050402 96
- Subbasin 17010306 41
- Watershed 1701030602 9
- Subwatershed 170103060207 4
- Watershed 1701030603 31
- Subwatershed 170103060304 6
- Subwatershed 170103060305 4
- Subwatershed 170103060306 17