Watershed · by program
Storm Water Industrial discharge permits in subbasin 03130009
- 5Permits
- 25Permits in the subbasin
- 1States the subbasin touches
5 of the 25 Clean Water Act discharge permits in hydrologic subbasin 03130009 are filed as Storm Water Industrial. A subbasin is a watershed unit, not a political one, so it crosses state lines: this one is named on permits in GA.
Where the subbasin lies
- GA 25 permits in the subbasin
Other cuts of subbasin 03130009
- program: Storm Water Construction 17
- major or minor: Minor dischargers 25
- permit type: General permit coverage 22
Every discharge permit in subbasin 03130009 →
Figures from EPA’s ICIS-NPDES download.