Watershed · by program
Storm Water Construction discharge permits in subbasin 03170008
- 174Permits
- 255Permits in the subbasin
- 2States the subbasin touches
174 of the 255 Clean Water Act discharge permits in hydrologic subbasin 03170008 are filed as Storm Water Construction. A subbasin is a watershed unit, not a political one, so it crosses state lines: this one is named on permits in AL, MS.
Where the subbasin lies
Other cuts of subbasin 03170008
- major or minor: Minor dischargers 251
- permit type: General permit coverage 230
- program: Storm Water Industrial 30
- permit type: Individual permits 23
- program: POTW 6
Every discharge permit in subbasin 03170008 →
Figures from EPA’s ICIS-NPDES download.