Watershed · by major or minor
Major dischargers discharge permits in subbasin 08080205
- 6Permits
- 45Permits in the subbasin
- 2States the subbasin touches
6 of the 45 Clean Water Act discharge permits in hydrologic subbasin 08080205 are filed as Major dischargers. A subbasin is a watershed unit, not a political one, so it crosses state lines: this one is named on permits in LA, TX.
Where the subbasin lies
Other cuts of subbasin 08080205
- program: Storm Water Construction 5
- program: Storm Water Industrial 3
- major or minor: Minor dischargers 39
- permit type: General permit coverage 33
- permit type: Individual permits 11
Every discharge permit in subbasin 08080205 →
Figures from EPA’s ICIS-NPDES download.