Watershed · by program
Storm Water Construction discharge permits in subbasin 10080012
- 3Permits
- 4Permits in the subbasin
- 1States the subbasin touches
3 of the 4 Clean Water Act discharge permits in hydrologic subbasin 10080012 are filed as Storm Water Construction. A subbasin is a watershed unit, not a political one, so it crosses state lines: this one is named on permits in WY.
Where the subbasin lies
- WY 4 permits in the subbasin
Other cuts of subbasin 10080012
Every discharge permit in subbasin 10080012 →
Figures from EPA’s ICIS-NPDES download.