Watershed · by program
Storm Water Construction discharge permits in subbasin 14060008
- 7Permits
- 15Permits in the subbasin
- 1States the subbasin touches
7 of the 15 Clean Water Act discharge permits in hydrologic subbasin 14060008 are filed as Storm Water Construction. A subbasin is a watershed unit, not a political one, so it crosses state lines: this one is named on permits in UT.
Where the subbasin lies
- UT 15 permits in the subbasin
Other cuts of subbasin 14060008
- permit type: General permit coverage 14
- major or minor: Minor dischargers 13
- program: Storm Water Industrial 5
Every discharge permit in subbasin 14060008 →
Figures from EPA’s ICIS-NPDES download.