Watershed · by program
Storm Water Industrial discharge permits in subbasin 20040000
- 3Permits
- 23Permits in the subbasin
- 1States the subbasin touches
3 of the 23 Clean Water Act discharge permits in hydrologic subbasin 20040000 are filed as Storm Water Industrial. A subbasin is a watershed unit, not a political one, so it crosses state lines: this one is named on permits in HI.
Where the subbasin lies
- HI 23 permits in the subbasin
Other cuts of subbasin 20040000
- major or minor: Minor dischargers 23
- permit type: General permit coverage 22
- program: Storm Water Construction 8
Every discharge permit in subbasin 20040000 →
Figures from EPA’s ICIS-NPDES download.