ALLISON DRAW 115-13.8 KV DISTRIBUTION SUBSTATION, (Unknown City), WY: NPDES WYR106637 discharge permit, effluent exceedances, inspections, penalties
ALLISON DRAW 115-13.8 KV DISTRIBUTION SUBSTATION, (Unknown City), Wyoming: General permit coverage WYR106637, held by Electrical Consultants, Inc.; Construction stormwater; Effective; issued August 7, 2024, term to May 15, 2025, by Wyoming Department of Environmental Quality.
Wyoming holds 323 Construction stormwater coverages of this permit type in EPA’s file; 261 were issued before WYR106637. Electrical Consultants, Inc. holds 7 permits in Wyoming.
Other permits held by Electrical Consultants, Inc.
- READY WYOMING LAYDOWN YARD #2, (Unknown City): WYR106523, issued 2023-10-20
- READY WYOMING LAYDOWN YARD #1, (Unknown City): WYR106524, issued 2023-10-23
- BISON TO WEST CHEYENNE ORCHARD VALLEY KING RANCH 115 KV TRANSMISSION LINE, (Unknown City): WYR106529, issued 2023-11-21
- WEST CHEYENNE TO WINDSTAR 230 KV TRANSMISSION LINE, (Unknown City): WYR106591, issued 2024-10-30
- CAMPSTOOL TO ALLISON DRAW 115 KV TRANSMISSION LINE, (Unknown City): WYR106631, issued 2024-08-06
- SWEETGRASS TO WEST CHEYENNE TRANSMISSION LINE, (Unknown City): WYR106672, issued 2025-01-22
Coverages issued nearest WYR106637
- 2024-08-01: LEAVITT RESERVOIR EXPANSION-BID PACKAGE C, (Unknown City): WYR106627, held by Mountain View Building, Inc.
- 2024-08-02: CHEYENNE TO OVERTHRUST COMPRESSOR STATION PROJECT, (Unknown City): WYR106620, held by Wyoming Interstate Company, L.L.C.
- 2024-08-02: CHEYENNE POWER PARK, (Unknown City): WYR106629, held by Thunder Basin Land Co, LLC
- 2024-08-05: BIG FILL SLIDE MITIGATION, WYDOT ND32401WP1, (Unknown City): WYR106630, held by Ames Construction, Inc.
- 2024-08-06: CAMPSTOOL TO ALLISON DRAW 115 KV TRANSMISSION LINE, (Unknown City): WYR106631, held by Electrical Consultants, Inc.
- 2024-08-08: ALEIXO RANCH DEVELOPMENT, (Unknown City): WYR106650, held by Rockin' T Construction, Inc.
- 2024-08-21: CODY TEMPLE, Cody: WYR106640, held by Haskell Architecture and Engineering, Inc.
- 2024-08-26: BAYER P4 PLANT WATERLINE REPLACEMENT, Rock Springs: WYR106647, held by Brahma Group Inc
- 2024-09-06: SPIRE CROSS CREEK 2 PIPELINE, (Unknown City): WYR106639, held by Enterprise Products Operating LLC
- 2024-09-09: HIGH PLAINS BUSINESS PARK 1ST FILING INFRASTRUCTURE 24 SEWER INTERCEPTOR, South Greeley: WYR106645, held by Reiman Corp.
ALLISON DRAW 115-13.8 KV DISTRIBUTION SUBSTATION among its neighbors
3 discharge permits are in the Crow Creek-Carpenter subwatershed (HUC 101900090203); WYR106637 is one. Its county: 96, 2 major; WYR106637 is minor permit.
Other permits in the Crow Creek-Carpenter subwatershed (HUC 101900090203)
- PROJECT STEAMBOAT, Cheyenne: WYR106716, minor, term to 2025-08-01
- WAYNE CHILD SUBSTATION (2021), Cheyenne: WYR106212, minor, term to 2024-06-01
What stands out
- Its term runs 281 days, August 7, 2024 to May 15, 2025; the term ended 517 days before EPA's file was loaded on October 14, 2026, and the file lists the permit as effective.
- No dated event in the 365 days to October 14, 2026.
- It is one of 1,686 discharge permits on the register in Wyoming; 323 of them (19%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | ALLISON DRAW 115-13.8 KV DISTRIBUTION SUBSTATION |
|---|---|
| Permittee | Electrical Consultants, Inc. |
| NPDES ID | WYR106637 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | August 7, 2024 |
| Expires | May 15, 2025 |
| Agency | Wyoming Department of Environmental Quality |
| Address | (Unknown City), WY |
| Subwatershed | Crow Creek-Carpenter (HUC 101900090203) |
NPDES WYR106637: effluent limits and exceedances
ALLISON DRAW 115-13.8 KV DISTRIBUTION SUBSTATION (NPDES WYR106637): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES WYR106637: no pollutant row on file.
NPDES WYR106637: inspections, violations and enforcement
NPDES WYR106637 (ALLISON DRAW 115-13.8 KV DISTRIBUTION SUBSTATION): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES WYR106637
NPDES WYR106637: one email when its EPA record changes — $99/month.
Permits near NPDES WYR106637
NPDES WYR106637: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded October 14, 2026.