Air-emissions inspections in Mohave County, Arizona, 2018

A compliance evaluation is the on-site or file review a state, local or federal air agency records against a permitted source. Each row below is one inspection recorded against a source in Mohave County, Arizona during 2018. A facility can appear several times: this is the year’s record of what happened, not a list of places. The sources themselves are on the Mohave County facility page.

Mohave County, Arizona, 2018

Air-emissions inspections in Mohave County, other years

Air-emissions inspections recorded in Mohave County, Arizona, 2018

DateFacilityKindAgency
2018-11-21UNS ELECTRIC INC - BLACK MOUNTAIN GENERATING STATIONFCE On-SiteState
2018-11-16EL PASO NATURAL GAS CO - HACKBERRY COMPRESSOR STATIONFCE On-SiteState
2018-11-15MOHAVE VALLEY LANDFILL — high-priority violation on fileFCE On-SiteState
2018-10-29GRIFFITH POWER PLANTFCE On-SiteState
2018-09-05TRANSWESTERN PIPELINE - KINGMAN COMPRESSOR STATIONPCE On-SiteState
2018-08-15GRIFFITH POWER PLANTPCE On-SiteState
2018-08-14MOHAVE VALLEY LANDFILL — high-priority violation on filePCE On-SiteState
2018-06-26UNS ELECTRIC INC - BLACK MOUNTAIN GENERATING STATIONPCE On-SiteState
2018-05-30AMERICAN WOODMARK CORPORATION - KINGMAN PLANTPCE On-SiteState
2018-04-18EL PASO NATURAL GAS CO - DUTCH FLAT COMPRESSOR STATIONFCE On-SiteState
2018-03-28EL PASO NATURAL GAS CO - HACKBERRY COMPRESSOR STATIONPCE On-SiteState
2018-03-28EL PASO NATURAL GAS CO - DUTCH FLAT COMPRESSOR STATIONPCE On-SiteState
2018-02-21UNS ELECTRIC INC - BLACK MOUNTAIN GENERATING STATIONPCE On-SiteState
2018-02-21UNS ELECTRIC INC - BLACK MOUNTAIN GENERATING STATIONFCE On-SiteState
2018-02-21EL PASO NATURAL GAS CO - MOJAVE TOPOCK COMPRESSOR STATIONPCE On-SiteState
2018-02-21EL PASO NATURAL GAS CO - MOJAVE TOPOCK COMPRESSOR STATIONFCE On-SiteState
2018-01-17TOPOCK LNG PLANT 1 COOLING WATER BLOWDOWN PONDPCE On-SiteState
2018-01-17TOPOCK LNG PLANT 1 COOLING WATER BLOWDOWN PONDFCE On-SiteState

Dates as filed by the agency that recorded the inspection. Figures from EPA’s ICIS-AIR download.