EPA Air · inspections by county and year
Air-emissions inspections in Mohave County, Arizona, 2024
- 22Inspections
A compliance evaluation is the on-site or file review a state, local or federal air agency records against a permitted source. Each row below is one inspection recorded against a source in Mohave County, Arizona during 2024. A facility can appear several times: this is the year’s record of what happened, not a list of places. The sources themselves are on the Mohave County facility page.
Mohave County, Arizona, 2024
Air-emissions inspections in Mohave County, other years
Air-emissions inspections recorded in Mohave County, Arizona, 2024
| Date | Facility | Kind | Agency |
|---|---|---|---|
| 2024-11-28 | MOHAVE VALLEY LANDFILL — high-priority violation on file | FCE On-Site | U.S. EPA |
| 2024-08-06 | EL PASO NATURAL GAS CO - DUTCH FLAT COMPRESSOR STATION | FCE On-Site | State |
| 2024-08-06 | SAND PIT | FCE On-Site | State |
| 2024-07-03 | EL PASO NATURAL GAS CO - HACKBERRY COMPRESSOR STATION | PCE On-Site | State |
| 2024-05-21 | GOLD ROAD MINE | PCE On-Site | State |
| 2024-05-21 | GOLD ROAD MINE | FCE On-Site | State |
| 2024-04-24 | MOHAVE VALLEY LANDFILL — high-priority violation on file | PCE On-Site | State |
| 2024-04-24 | MOHAVE VALLEY LANDFILL — high-priority violation on file | FCE On-Site | State |
| 2024-04-16 | TRANSWESTERN PIPELINE - KINGMAN COMPRESSOR STATION | PCE On-Site | State |
| 2024-04-16 | TRANSWESTERN PIPELINE - KINGMAN COMPRESSOR STATION | FCE On-Site | State |
| 2024-04-16 | TOPOCK LNG PLANT 1 COOLING WATER BLOWDOWN POND | PCE On-Site | State |
| 2024-04-16 | TOPOCK LNG PLANT 1 COOLING WATER BLOWDOWN POND | FCE On-Site | State |
| 2024-04-16 | EL PASO NATURAL GAS CO - MOJAVE TOPOCK COMPRESSOR STATION | PCE On-Site | State |
| 2024-04-16 | EL PASO NATURAL GAS CO - MOJAVE TOPOCK COMPRESSOR STATION | FCE On-Site | State |
| 2024-03-27 | UNS ELECTRIC INC - BLACK MOUNTAIN GENERATING STATION | PCE On-Site | State |
| 2024-03-27 | UNS ELECTRIC INC - BLACK MOUNTAIN GENERATING STATION | FCE On-Site | State |
| 2024-03-26 | GRIFFITH POWER PLANT | PCE On-Site | State |
| 2024-03-26 | GRIFFITH POWER PLANT | FCE On-Site | State |
| 2024-03-05 | MOSS MINE | PCE On-Site | State |
| 2024-03-05 | MOSS MINE | FCE On-Site | State |
| 2024-02-14 | LAKE HAVASU CITY LANDFILL | PCE On-Site | State |
| 2024-02-14 | LAKE HAVASU CITY LANDFILL | FCE On-Site | State |
Dates as filed by the agency that recorded the inspection. Figures from EPA’s ICIS-AIR download.