EPA Air · inspections by county and year
Air-emissions inspections in Riverside County, California, 2017
- 56Inspections
A compliance evaluation is the on-site or file review a state, local or federal air agency records against a permitted source. Each row below is one inspection recorded against a source in Riverside County, California during 2017. A facility can appear several times: this is the year’s record of what happened, not a list of places. The sources themselves are on the Riverside County facility page.
Riverside County, California, 2017
- Stack tests 31
Air-emissions inspections in Riverside County, other years
Air-emissions inspections recorded in Riverside County, California, 2017
| Date | Facility | Kind | Agency |
|---|---|---|---|
| 2017-12-13 | DART CONTAINER CORP OF CALIFORNIA — high-priority violation on file | FCE On-Site | Local |
| 2017-11-11 | METAL CONTAINER CORP | FCE On-Site | Local |
| 2017-10-29 | SAN DIEGO GAS & ELECTRIC | FCE On-Site | Local |
| 2017-10-24 | BLYTHE ENERGY LLC (FPL FLORIDA POWER) | PCE On-Site | Local |
| 2017-10-20 | WILDFLOWER ENERGY LP, INDIGO ENERGY FAC | FCE On-Site | Local |
| 2017-10-11 | SIERRA ALUMINUM, DIV IF SAMUEL, SON & CO | FCE On-Site | Local |
| 2017-10-10 | WILDFLOWER ENERGY LP, INDIGO ENERGY FAC | PCE On-Site | Local |
| 2017-10-06 | EASTERN MUNICIPAL WATER DISTRICT | FCE On-Site | Local |
| 2017-10-03 | 3M COMPANY | FCE On-Site | Local |
| 2017-09-29 | ROHR, INC. | FCE On-Site | Local |
| 2017-09-27 | TXI RIVERSIDE CEMENT CO - CRESTMORE PLT | FCE On-Site | Local |
| 2017-08-24 | AOC, LLC | FCE On-Site | Local |
| 2017-08-08 | TXI RIVERSIDE CEMENT CO - CRESTMORE PLT | PCE On-Site | Local |
| 2017-08-01 | SAN DIEGO GAS & ELECTRIC | PCE On-Site | Local |
| 2017-07-27 | SO CAL GAS - BLYTHE | PCE On-Site | Local |
| 2017-07-27 | USA WASTE OF CA - EL SOBRANTE LANDFILL | FCE On-Site | Local |
| 2017-07-20 | ROHR, INC. | PCE On-Site | Local |
| 2017-06-30 | AOC, LLC | PCE On-Site | Local |
| 2017-06-23 | USA WASTE OF CA - EL SOBRANTE LANDFILL | PCE On-Site | Local |
| 2017-06-21 | 3M COMPANY | PCE On-Site | Local |
| 2017-06-16 | RIV CO WASTE MGMT BADLANDS LANDFILL | PCE On-Site | Local |
| 2017-06-16 | RIV CO WASTE MGMT BADLANDS LANDFILL | FCE On-Site | Local |
| 2017-06-15 | RIV CO, WASTE RESOURCES MGMT DIST, LAMB | PCE On-Site | Local |
| 2017-06-15 | RIV CO, WASTE RESOURCES MGMT DIST, LAMB | FCE On-Site | Local |
| 2017-06-14 | EASTERN MUNICIPAL WATER DIST-PERRIS | PCE On-Site | Local |
| 2017-06-14 | EASTERN MUNICIPAL WATER DIST-PERRIS | FCE On-Site | Local |
| 2017-06-13 | EASTERN MUNICIPAL WATER DISTRICT | PCE On-Site | Local |
| 2017-06-06 | SENTINEL ENERGY CENTER LLC | FCE On-Site | Local |
| 2017-05-18 | CITY OF RIVERSIDE PUBLIC UTILITIES DEPT | FCE On-Site | Local |
| 2017-05-04 | PACIFIC CLAY PRODUCTS INC | FCE On-Site | Local |
| 2017-05-02 | WESTLAKE ROYAL ROOFING LLC | FCE On-Site | Local |
| 2017-04-19 | IMPERIAL IRRIGATION DISTRICT/COACHELLA | FCE On-Site | Local |
| 2017-04-19 | SENTINEL ENERGY CENTER LLC | PCE On-Site | Local |
| 2017-04-05 | GALASSO'S BAKERY | PCE On-Site | Local |
| 2017-03-30 | ABBOTT CARDIOVASCULAR SYSTEMS | PCE On-Site | Local |
| 2017-03-29 | DART CONTAINER CORP OF CALIFORNIA — high-priority violation on file | PCE On-Site | Local |
| 2017-03-29 | IMPERIAL IRRIGATION DISTRICT/COACHELLA | PCE On-Site | Local |
| 2017-03-28 | CITY OF RIVERSIDE PUBLIC UTILITIES DEPT | PCE On-Site | Local |
| 2017-03-24 | QG PRINTING CORP — high-priority violation on file | PCE On-Site | Local |
| 2017-03-24 | QG PRINTING CORP — high-priority violation on file | FCE On-Site | Local |
| 2017-03-24 | SILVER CREEK MODULAR | PCE On-Site | Local |
| 2017-03-22 | PREPRODUCTION PLASTICS INC. | PCE On-Site | Local |
| 2017-03-22 | OLDCASTLE INFRASTRUCTURE | PCE On-Site | Local |
| 2017-03-22 | AMERICAN DOCK BOX | PCE On-Site | Local |
| 2017-03-14 | NEW BASIS (FRMLY ASSOCIATED PLASTICS) | PCE On-Site | Local |
| 2017-03-08 | FLEETWOOD HOMES INC | PCE On-Site | Local |
| 2017-03-08 | FLEETWOOD HOMES INC | FCE On-Site | Local |
| 2017-03-08 | THORO PACKAGING | PCE On-Site | Local |
| 2017-03-03 | METAL CONTAINER CORP | PCE On-Site | Local |
| 2017-03-02 | RGF ENTERPRISES | PCE On-Site | Local |
| 2017-02-23 | ALL AMERICAN ASPHALT- UNIT #1 | PCE On-Site | Local |
| 2017-02-16 | SIERRA ALUMINUM, DIV IF SAMUEL, SON & CO | PCE On-Site | Local |
| 2017-02-14 | WESTLAKE ROYAL ROOFING LLC | PCE On-Site | Local |
| 2017-02-09 | SO CAL GAS - BLYTHE | FCE Off-Site | Local |
| 2017-02-09 | BLYTHE ENERGY LLC (FPL FLORIDA POWER) | FCE Off-Site | Local |
| 2017-02-01 | PACIFIC CLAY PRODUCTS INC | PCE On-Site | Local |
Dates as filed by the agency that recorded the inspection. Figures from EPA’s ICIS-AIR download.