EPA Air · inspections by county and year
Air-emissions inspections in Riverside County, California, 2022
- 35Inspections
A compliance evaluation is the on-site or file review a state, local or federal air agency records against a permitted source. Each row below is one inspection recorded against a source in Riverside County, California during 2022. A facility can appear several times: this is the year’s record of what happened, not a list of places. The sources themselves are on the Riverside County facility page.
Riverside County, California, 2022
- Stack tests 20
Air-emissions inspections in Riverside County, other years
Air-emissions inspections recorded in Riverside County, California, 2022
| Date | Facility | Kind | Agency |
|---|---|---|---|
| 2022-12-27 | PACIFIC CLAY PRODUCTS INC | PCE Off-Site | Local |
| 2022-12-21 | ALL AMERICAN ASPHALT- UNIT #1 | PCE Off-Site | Local |
| 2022-12-16 | WESTLAKE ROYAL ROOFING LLC | PCE Off-Site | Local |
| 2022-12-15 | MODERN GINNING CO | PCE On-Site | Local |
| 2022-12-15 | BLYTHE ENERGY LLC (FPL FLORIDA POWER) | PCE On-Site | Local |
| 2022-12-02 | WILDFLOWER ENERGY LP, INDIGO ENERGY FAC | PCE Off-Site | Local |
| 2022-11-21 | DART CONTAINER CORP OF CALIFORNIA — high-priority violation on file | PCE Off-Site | Local |
| 2022-11-20 | SIERRA ALUMINUM, DIV IF SAMUEL, SON & CO | PCE Off-Site | Local |
| 2022-11-15 | SAN DIEGO GAS & ELECTRIC | PCE Off-Site | Local |
| 2022-11-05 | ROHR, INC. | PCE Off-Site | Local |
| 2022-11-03 | 3M COMPANY | PCE Off-Site | Local |
| 2022-10-26 | AOC, LLC | PCE Off-Site | Local |
| 2022-07-26 | SENTINEL ENERGY CENTER LLC | PCE Off-Site | Local |
| 2022-07-15 | SENTINEL ENERGY CENTER LLC | PCE Off-Site | Local |
| 2022-06-29 | AMERICAN DOCK BOX | FCE On-Site | Local |
| 2022-06-10 | ROHR, INC. | FCE On-Site | Local |
| 2022-05-26 | PREPRODUCTION PLASTICS INC. | FCE On-Site | Local |
| 2022-05-23 | DART CONTAINER CORP OF CALIFORNIA — high-priority violation on file | FCE On-Site | Local |
| 2022-05-14 | CITY OF RIVERSIDE PUBLIC UTILITIES DEPT | PCE Off-Site | Local |
| 2022-05-12 | OLDCASTLE INFRASTRUCTURE | FCE On-Site | Local |
| 2022-05-06 | NEW BASIS (FRMLY ASSOCIATED PLASTICS) | FCE On-Site | Local |
| 2022-04-20 | SIERRA ALUMINUM, DIV IF SAMUEL, SON & CO | FCE On-Site | Local |
| 2022-04-19 | SO CAL GAS - BLYTHE | PCE On-Site | Local |
| 2022-04-13 | ABBOTT CARDIOVASCULAR SYSTEMS | FCE On-Site | Local |
| 2022-04-06 | METAL CONTAINER CORP | FCE On-Site | Local |
| 2022-04-06 | WILDFLOWER ENERGY LP, INDIGO ENERGY FAC | FCE On-Site | Local |
| 2022-03-18 | AOC, LLC | FCE On-Site | Local |
| 2022-03-10 | 3M COMPANY | FCE On-Site | Local |
| 2022-03-10 | ALL AMERICAN ASPHALT- UNIT #1 | FCE On-Site | Local |
| 2022-03-08 | WESTLAKE ROYAL ROOFING LLC | FCE On-Site | Local |
| 2022-03-02 | SENTINEL ENERGY CENTER LLC | FCE On-Site | Local |
| 2022-03-01 | PACIFIC CLAY PRODUCTS INC | FCE On-Site | Local |
| 2022-01-25 | CITY OF RIVERSIDE PUBLIC UTILITIES DEPT | FCE On-Site | Local |
| 2022-01-06 | SO CAL GAS - BLYTHE | FCE On-Site | Local |
| 2022-01-01 | BLYTHE ENERGY LLC (FPL FLORIDA POWER) | FCE On-Site | Local |
Dates as filed by the agency that recorded the inspection. Figures from EPA’s ICIS-AIR download.