EPA Air · inspections by state, industry and year
Utilities (NAICS 2211): inspections in New Hampshire, 2024
- 19Inspections
A compliance evaluation is the on-site or file review a state, local or federal air agency records against a permitted source. Each row is one inspection recorded during 2024 at a New Hampshire source whose primary industry code is NAICS 2211. A facility filing more than one industry code is counted under the first one on its record.
Utilities (NAICS 2211) in New Hampshire, other years
Other industries in New Hampshire, 2024
- Waste management and remediation (NAICS 5622) 28
- Mining and quarrying (NAICS 2123) 6
- Wood product manufacturing (NAICS 3219) 5
- Waste management and remediation (NAICS 5621) 4
- Amusement, gambling and recreation (NAICS 7139) 3
- Petroleum and coal products manufacturing (NAICS 3241) 3
- Nursing and residential care facilities (NAICS 6233) 3
- Crop production (NAICS 1114) 3
- Educational services (NAICS 6113) 3
- Computer and electronic product manufacturing (NAICS 3344) 3
- Hospitals (NAICS 6221) 3
- Plastics and rubber products manufacturing (NAICS 3261) 3
Air-emissions inspections recorded in New Hampshire, 2024
| Date | Facility | Where | Kind | Agency |
|---|---|---|---|---|
| 2024-12-06 | MERRIMACK STATION | BOW, Merrimack, NH | PCE On-Site | State |
| 2024-11-14 | NEWINGTON ENERGY | NEWINGTON, Rockingham, NH | FCE On-Site | State |
| 2024-10-18 | NEXTERA RENEWABLE FUELS, LLC - FOUR HILLS LANDFILL | NASHUA, Hillsborough, NH | FCE On-Site | State |
| 2024-09-30 | NE RENEWABLE POWER TAMWORTH — high-priority violation on file | TAMWORTH, Carroll, NH | PCE On-Site | State |
| 2024-08-26 | BRIDGEWATER POWER COMPANY, L.P. | BRIDGEWATER, Grafton, NH | FCE On-Site | State |
| 2024-07-01 | NE RENEWABLE POWER BETHLEHEM | BETHLEHEM, Grafton, NH | FCE On-Site | State |
| 2024-06-14 | NE RENEWABLE POWER WHITEFIELD | WHITEFIELD, Coos, NH | PCE On-Site | State |
| 2024-06-14 | NE RENEWABLE POWER WHITEFIELD | WHITEFIELD, Coos, NH | PCE On-Site | State |
| 2024-06-14 | NE RENEWABLE POWER WHITEFIELD | WHITEFIELD, Coos, NH | PCE On-Site | State |
| 2024-06-12 | NE RENEWABLE POWER TAMWORTH — high-priority violation on file | TAMWORTH, Carroll, NH | PCE On-Site | State |
| 2024-05-30 | GSP NEWINGTON LLC | NEWINGTON, Rockingham, NH | FCE On-Site | State |
| 2024-05-23 | BURGESS BIOPOWER | BERLIN, Coos, NH | PCE On-Site | State |
| 2024-05-23 | BURGESS BIOPOWER | BERLIN, Coos, NH | PCE On-Site | State |
| 2024-03-07 | BURGESS BIOPOWER | BERLIN, Coos, NH | FCE On-Site | State |
| 2024-02-08 | NE RENEWABLE POWER WHITEFIELD | WHITEFIELD, Coos, NH | FCE On-Site | State |
| 2024-01-31 | BRIDGEWATER POWER COMPANY, L.P. | BRIDGEWATER, Grafton, NH | PCE On-Site | State |
| 2024-01-31 | BRIDGEWATER POWER COMPANY, L.P. | BRIDGEWATER, Grafton, NH | PCE On-Site | State |
| 2024-01-25 | BURGESS BIOPOWER | BERLIN, Coos, NH | PCE On-Site | State |
| 2024-01-25 | BURGESS BIOPOWER | BERLIN, Coos, NH | PCE On-Site | State |
Primary NAICS code as filed on the facility record; dates as filed by the agency that recorded the inspection. Figures from EPA’s ICIS-AIR download.