EPA Air · inspections by state, industry and year
Utilities (NAICS 2211): inspections in New Hampshire, 2025
- 16Inspections
A compliance evaluation is the on-site or file review a state, local or federal air agency records against a permitted source. Each row is one inspection recorded during 2025 at a New Hampshire source whose primary industry code is NAICS 2211. A facility filing more than one industry code is counted under the first one on its record.
Utilities (NAICS 2211) in New Hampshire, other years
Other industries in New Hampshire, 2025
- Waste management and remediation (NAICS 5622) 35
- Fabricated metal product manufacturing (NAICS 3328) 6
- Hospitals (NAICS 6221) 4
- Educational services (NAICS 6111) 4
- Computer and electronic product manufacturing (NAICS 3344) 3
- Wood product manufacturing (NAICS 3211) 3
- Primary metal manufacturing (NAICS 3315) 3
- Educational services (NAICS 6113) 3
- Wood product manufacturing (NAICS 3219) 3
- Fabricated metal product manufacturing (NAICS 3323) 3
- Waste management and remediation (NAICS 5621) 3
- Petroleum and coal products manufacturing (NAICS 3241) 3
- Utilities (NAICS 2213) 3
Air-emissions inspections recorded in New Hampshire, 2025
| Date | Facility | Where | Kind | Agency |
|---|---|---|---|---|
| 2025-12-17 | NE RENEWABLE POWER TAMWORTH — high-priority violation on file | TAMWORTH, Carroll, NH | PCE On-Site | State |
| 2025-12-17 | NE RENEWABLE POWER TAMWORTH — high-priority violation on file | TAMWORTH, Carroll, NH | PCE On-Site | State |
| 2025-12-17 | NE RENEWABLE POWER TAMWORTH — high-priority violation on file | TAMWORTH, Carroll, NH | PCE On-Site | State |
| 2025-11-06 | NEXTERA ENERGY SEABROOK, LLC | SEABROOK, Rockingham, NH | FCE On-Site | State |
| 2025-09-30 | MERRIMACK STATION | BOW, Merrimack, NH | FCE On-Site | State |
| 2025-09-12 | NE RENEWABLE POWER WHITEFIELD | WHITEFIELD, Coos, NH | PCE On-Site | State |
| 2025-09-12 | NE RENEWABLE POWER WHITEFIELD | WHITEFIELD, Coos, NH | PCE On-Site | State |
| 2025-09-12 | NE RENEWABLE POWER WHITEFIELD | WHITEFIELD, Coos, NH | PCE On-Site | State |
| 2025-07-16 | NE RENEWABLE POWER TAMWORTH — high-priority violation on file | TAMWORTH, Carroll, NH | FCE On-Site | State |
| 2025-06-02 | NE RENEWABLE POWER TAMWORTH — high-priority violation on file | TAMWORTH, Carroll, NH | PCE On-Site | State |
| 2025-06-02 | NE RENEWABLE POWER TAMWORTH — high-priority violation on file | TAMWORTH, Carroll, NH | PCE On-Site | State |
| 2025-06-02 | NE RENEWABLE POWER TAMWORTH — high-priority violation on file | TAMWORTH, Carroll, NH | PCE On-Site | State |
| 2025-04-25 | NE RENEWABLE POWER SPRINGFIELD | SPRINGFIELD, Sullivan, NH | FCE On-Site | State |
| 2025-04-01 | GRANITE RIDGE ENERGY, LLC | LONDONDERRY, Rockingham, NH | FCE On-Site | State |
| 2025-03-26 | SCHILLER STATION COMBUSTION TURBINE | PORTSMOUTH, Rockingham, NH | FCE On-Site | State |
| 2025-02-12 | BURGESS BIOPOWER | BERLIN, Coos, NH | PCE On-Site | State |
Primary NAICS code as filed on the facility record; dates as filed by the agency that recorded the inspection. Figures from EPA’s ICIS-AIR download.