ICIS-AIR WY0000005603100001

LARAMIE RIVER STATION (BASIN ELECTRIC POWER COOPERATIVE), Wheatland, WY: Clean Air Act compliance record, inspections, violations, penalties

LARAMIE RIVER STATION (BASIN ELECTRIC POWER COOPERATIVE) is on EPA’s ICIS-AIR register at S30-T25N-R66W, Wheatland in Platte County, Wyoming: operating status operating, emissions classification major source, current violation status “Addressed-State”.

What stands out

  • The newest of the 89 events on file is a stack test dated July 9, 2026.
  • Of the 2 formal enforcement actions on file, 2 carry a filed penalty above zero. The largest on file is $200,000, filed July 31, 2018.
  • All 9 of its compliance evaluations on file are full compliance evaluations.
  • 2 of the 74 stack tests on file are recorded as failed.
  • 2 of the 2 violation determinations on file are high-priority.
  • The register holds 15 air-emissions sources in Platte County, Wyoming.

Every line is computed by formula from the record’s stored figures; nothing is estimated.

Identity

Facility as filedLARAMIE RIVER STATION (BASIN ELECTRIC POWER COOPERATIVE)
ICIS-AIR IDWY0000005603100001
EPA facility registry ID110000468075
Operating statusOperating
Emissions classificationMajor source
Current violation status (HPV field)Addressed-State
AddressS30-T25N-R66W, Wheatland, WY 82201
CountyPlatte County
In a nonattainment countyNo (EPA Green Book)
Industry (NAICS)Utilities (NAICS 2211)
SIC code4911
EPA region08

Programs and pollutants

The program, pollutant and Title V files are not loaded: what this page covers.

Compliance evaluations

DateWhat EPA recordedAgencyPrograms
July 23, 2025FCE On-SiteStateTitle V Permits
July 2, 2024FCE On-SiteStateTitle V Permits
May 2, 2023FCE On-SiteStateTitle V Permits
June 28, 2022FCE On-SiteStateTitle V Permits
May 7, 2021FCE On-SiteStateTitle V Permits
April 21, 2020FCE Off-SiteStateTitle V Permits
April 4, 2019FCE On-SiteStateTitle V Permits
November 14, 2017FCE On-SiteStateTitle V Permits
January 25, 2017FCE On-SiteStateTitle V Permits

Violations

What high-priority and federally reportable violations mean.

DateWhat EPA recordedAgencyPrograms
February 24, 2026HPV day-zero determinationStateTitle V Permits
June 28, 2022HPV day-zero determinationStateTitle V Permits

Enforcement and penalties

2 of the formal enforcement actions carry a penalty filed above zero. How a penalty is shown.

DateWhat EPA recordedAgencyPenalty, as filed
November 15, 2024Civil Judicial ActionState$45,000
July 31, 2018CAA 113D1 Action For PenaltyU.S. EPA$200,000

Informal enforcement

DateWhat EPA recordedAgency
May 29, 2026Notice of ViolationState
November 29, 2022Notice of ViolationState

Stack tests

The newest 50 of 74.

DateWhat EPA recordedAgency
July 9, 2026PassState
July 9, 2026PassState
July 7, 2026PassState
July 7, 2026PassState
July 7, 2026PassState
March 31, 2026PassState
March 11, 2026PassState
March 11, 2026PassState
March 11, 2026PassState
March 11, 2026PassState
December 16, 2025PassState
December 16, 2025PassState
December 16, 2025PassState
November 5, 2025PassState
November 5, 2025PassState
August 28, 2025PassState
August 28, 2025PassState
August 28, 2025PassState
August 28, 2025PassState
August 28, 2025PassState
August 28, 2025PassState
August 28, 2025PassState
August 28, 2025PassState
August 28, 2025PassState
June 5, 2025PassState
June 5, 2025PassState
June 5, 2025PassState
July 10, 2024PassState
June 26, 2024PassState
June 26, 2024PassState
March 14, 2024PassState
March 14, 2024PassState
March 14, 2024PassState
December 14, 2023PassState
December 14, 2023PassState
August 31, 2023PassState
August 31, 2023PassState
August 31, 2023PassState
August 31, 2023PassState
August 31, 2023PassState
August 31, 2023PassState
June 15, 2023PassState
April 30, 2023PassState
November 17, 2022PassState
September 9, 2022PassState
September 1, 2022PassState
August 11, 2022FailState
August 9, 2022PassState
July 6, 2022PassState
March 23, 2022PassState

Watch LARAMIE RIVER STATION (BASIN ELECTRIC POWER COOPERATIVE)

One source — $99/month

Billing

Privacy

Free from EPA: Detailed Facility Report, ECHO Notify (registry ID 110000468075).

Other air sources in Wyoming beside LARAMIE RIVER STATION (BASIN ELECTRIC POWER COOPERATIVE)

EPA ICIS-AIR download, loaded September 14, 2026.